Difference between revisions of "Architecture Working Group"

From Second Life Wiki
Jump to navigation Jump to search
m (→‎Meetings: AWG2 info)
Line 18: Line 18:


== Documents and Resources ==
== Documents and Resources ==
=== Specifications ===
The current, and first, draft of "Second Life Grid - Open Grid Protocol" can be found here:
* [[SLGOGP Draft 1]]
** also available in [[foo|HTML]] and [[bar|PDF]]
Please Note: The draft page is locked because we want a stable reference for discussion and to base the next draft on. Each section in the draft has a link on the right to a discussion for that particular section.  Discuss!
=== Design Documents ===
=== Design Documents ===
The current state of the group's design:
The current state of the group's design:

Revision as of 09:34, 11 March 2008

About

AWG's mission is to develop the protocols that will open up the Second Life Grid from something operated solely by Linden Lab to where others can run parts of the grid.

  • Basic info here.
  • Learn more about scope, timeframe, getting started, process and best practices in About AWG.

Meetings

AWG Meetings

Formal meetings will likely be held 3-4 times/year and located in Second Life to facilitate broad participation. Meetings will be coordinated on SLDev.

  • AWG Meeting 2: Scheduled for 18 March 2008, 8am-noon Pacific Daylight Time. See invitation posted to sldev for details and instructions for RSVP-ing.
  • AWG Meeting 1: Agenda, transcript, work items, participant responses and other resources.

Zero's Office Hours

Engineering Director Zero Linden hosts technical discussions about Second Life Grid development at his office hours 2x/week. Date, time, location and transcripts available at User:Zero Linden.

NB: Task-based work groups are encouraged to self-organize community meetings to move forward particular work areas and discuss hot topics as needed. See Resources below.

Documents and Resources

Specifications

The current, and first, draft of "Second Life Grid - Open Grid Protocol" can be found here:

Please Note: The draft page is locked because we want a stable reference for discussion and to base the next draft on. Each section in the draft has a link on the right to a discussion for that particular section. Discuss!


Design Documents

The current state of the group's design:

Resources


Related efforts, groups and work: