Difference between revisions of "Second Life Railroad"

From Second Life Wiki
Jump to navigation Jump to search
Line 174: Line 174:
|title=LHRR Pumbaa Station
|title=LHRR Pumbaa Station
}}
}}
* Loco Motives - [http://world.secondlife.com/group/d47adf74-2503-ef83-85fc-b7befa691b56 group link] multi-region SLRR-gauge layouts
*[[ONSR]] - [[ONSR|Okemo, Nakiska, and Southern Railway]] {{SLurl
*[[ONSR]] - [[ONSR|Okemo, Nakiska, and Southern Railway]] {{SLurl
|region=Smithers Bluff
|region=Smithers Bluff

Revision as of 04:45, 6 September 2010


Emblem-important-yellow.png Note!

As with all wiki.secondlife pages that are not LL Official pages, this article is open to edit as and when a resident feels it is appropriate (see Editing Guidelines). If however you simply wish to ask or make a suggestion about or discuss the railroad or the content of this article, please use the Talk page. The talk page is also where any disputes over proposed page content should be discussed. This Wiki (being a document of an ever changing world) is constantly in need of updating and improvement. If you are aware of information this article should have added/changed please go ahead and do so. If you do not feel confident about editing make the suggestion on the talk page and another contributor may be able to assist.


Description

This article is a description of the Second Life Railroad ( SLRR ) on the Heterocera Atoll continent. It gives landmark locations to the official Linden railway station as well as station created by residents on private land along the railroad tracks.

SLRR

The Second Life Railroad ( SLRR ) runs over more then 60 Regions on the Heterocera Atoll (Northern) Continent. And there are 20 more Regions that have branch lines being extended out from the Main Line.

Second Life residents can operate trains on the SLRR and other railroads, much as anyone can operate a car on the roads in Second Life. Any Resident may use this public facility for any purpose consistent with the Second Life Community Standards/TOS. Along the railway line there are many stations where you can rez a train to start a journey.

Track-laying and maintenance are provided by the Linden Maintenance group (most often Michael Linden, currently) and the Linden Department of Public works LDPW.

Residents have been using the SLRR since 2005. There are many train builders in SL that make a wide variety of trains using several different methods for locomotion. The current SLRR track standards support all types of trains. Already very many Residents have personal trains they use on the SLRR. Using the SLRR with its current standard is simple to understand and accessible to Residents and builders of all skill levels.

The SLRR was originally designed to work under the prevailing conditions in Second Life; standards were not published until recently. Many changes have occurred in Second Life since 2005, and there is work underway to establish formal standards to guide Resident rail content creation for use on the SLRR (and on other networks built to any of the same standards). This work was started on the 18th of August 2010 during a LDPW led Railway Brown Bag meeting with the Rail community.

Standards for guidance, track and SLRR Switches will enable Residents to develop suitable vehicles.

Train builders and other rail networks may use different standards, or only part of these standards. Non-Linden rail networks are encouraged to publish their own standards if these networks allow the public to use them with their own rolling stock.

The standards, as published on these and following pages, are general measurements taken from in-world. However, Linden Lab is committed to adjusting and extending the SLRR in accordance with these standards - Michael Linden.

During one of the LDPW Office_hours at the beginning of 2010 Michael Linden has made the following public statements, summarized here:

  • The SLRR track specifications will not change anytime soon.
  • Signals will be installed but we will not be punished for example for "running red light signals".
  • Switches will be installed connecting the various branch lines to the main line.
  • Automated trains will not be put into regular service by the LDPW, if the residents keep using the SLRR with their private trains.
  • Residents may choose to run automated trains, consistent with the ToS.
  • Residents may make a request to the LDPW to connect their private track on the Atoll to the SLRR track via a switch.

These points where reconfirmed on the Railroad Brown Bag meeting between LDPW and the community on August 18th 2010.

History

The SLRR dates back to 2005 when Linden Lab created railroad tracks on the 2nd continent they made. On the SLRR history page you can find out more how railroad became what it is to date.

Other Railway initiatives

There are several other gauge railroads in SL and private group initiatives, some on private land, some on Linden land.
This is an alphabetic list of some examples. The different systems are not necessarily compatible with SLRR standards.


Source

The above information was initially collected by SL Residents from the Virtual Railway Consortium.
Additions have been provided by Jer Straaf, Damion Goodman, Dougie Flossberg and others associated with other SLRR related groups.
Michael Linden provided the official branch line names.

Also See

Here is a list of Related resources. You can find more information about the SLRR and other Rail related articles on these wiki pages and external websites.