Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 4: Line 4:


== Sprint 15, ends 05.16.11 ==
== Sprint 15, ends 05.16.11 ==
== Wednesday, April 27 ==
== Wednesday, May 4 ==


=== General Notes ===
=== General Notes ===
----
----
* Sprint 15 will be 3 weeks to partially compensate for holidays and vacations
* Happy Star Wars day. May the 4th be with you.  
* Seth vacation this week
* Oz vacation Wed-Fri.


===Team Status===
===Team Status===
----
----
==== Wolf Linden ====
==== Oz Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* WLRS: revised specs
* Much merging (trial merges of mesh & windlight project viewer)
* Prototyped GPU table regression test (STORM-1100)


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* will publish revision to stakeholders
* Meet on contrib-build
** will include an answer to Vadim's question
* Rewrite GPU table regression test (STORM-1100) in python
* will publish specs to OS devs next week


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Grumpity ProductEngine ====
==== Wolf Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* WLRS discussions
* Updated and published WLRS specs
* crashhunters
 
* meetings
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* VWR triage
* Following up on email from Oz re: spec change,
* finalizing first draft of customizable UI specs


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Paul ProductEngine ====
==== Grumpity ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Work on Windlight Region Settings.
* crashhunting
** Working on UI (XML) part of the task according to the spec.
* storm triage
** Creating floaters, menus, notification boxes, etc.
* WLRS updated spec
** Not committing until Jira tickets are created.
 
** Estimate: should finish this week.
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Work on Windlight Region Settings.
* I10n new issues - prioritize, future process
 
* WLRS
<b>IMPEDIMENTS</b><br />
* VWR triage
* none
 
 
==== Vadim ProductEngine ====
----
<b>PAST</b><br />
* Windlight Region Settings design meeting.
* Designing new WLRS implementation, defining technical subtasks by the way.
   
   
<b>FUTURE</b><br />
* WLRS: Continue with defining technical subtasks and implementation design.
* WLRS: Create JIRA tickets for XUI-related subtasks so that Paul can submit his work.
* Code review.
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* issues that were acknowledged previously in VWR are not getting any attention
* Project Viewer for WLRS?


==== Andrey ProductEngine ====
==== Paul ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* picked up 2.6.6 Beta build for testing
* TASK STORM-1202 (Time spin control)
* smoke & integrity tests have been passed, although an intermittent crash on Linux has been found (VWR-25624). See IQA-147 for more details
** Started implementing. Estimate ~ 12 hours.
* IQA-148 testing is in progress, there is a bunch of issues marked as Def because TPE cannot verify them
** Had troubles with my build while adding files for new TimeSpinCtrl widget. Unfortunately it took much time.
   
   
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* pickup 2.6.6 RC for testing or latest v-d build for regression testing
* TASK STORM-1202 (Time spin control)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 86: Line 69:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Working inworld(this is part of testing localy built viewers).
*STORM-1215 : added comment to RB and discussed with Oz in IRC.
** Checking on horses and bundles, plus work on note cards for them.
*STORM-1100 : Per Oz's instruction in IRC added comment with specification of video card on my Linux laptop.
** Desiding on what type of build to work on next.
* Set up development environment on Lunix notebook computer for basic work.
* OPEN-9 : still TBD.
** have one issue that is just a warning due to different compiler version between me and LL.
* STORM-1182 : tested in my local dev environment and found this had been fixed for Windows 2 months ago so Vadim and Broondas's work is simply porting it to Mac and Linux


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Working inworld(this is part of testing localy built viewers).
* STORM-1215: will generate build logs for Oz when windows system is back up and running.
* See Impediments.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Getting Autobuild system and seceurity software to play nicely on my system.
* Getting Autobuild system and security software to play nicely on my system.
 
* Windows System for development work down till parts are received and




= Past Updates =
= Past Updates =
<b>Aprli</b><br />
<b>Aprli</b><br />
[[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]  
[[Snowstorm_Daily_Scrum_Archive/04272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]  


<b>March</b><br />
<b>March</b><br />

Revision as of 22:53, 4 May 2011


Sprint 15, ends 05.16.11

Wednesday, May 4

General Notes


  • Happy Star Wars day. May the 4th be with you.

Team Status


Oz Linden


PAST

  • Much merging (trial merges of mesh & windlight project viewer)
  • Prototyped GPU table regression test (STORM-1100)

FUTURE

  • Meet on contrib-build
  • Rewrite GPU table regression test (STORM-1100) in python

IMPEDIMENTS

  • none

Wolf Linden


PAST

  • Updated and published WLRS specs

FUTURE

  • Following up on email from Oz re: spec change,
  • finalizing first draft of customizable UI specs

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunting
  • storm triage
  • WLRS updated spec

FUTURE

  • I10n new issues - prioritize, future process
  • WLRS
  • VWR triage

IMPEDIMENTS

  • issues that were acknowledged previously in VWR are not getting any attention
  • Project Viewer for WLRS?

Paul ProductEngine


PAST

  • TASK STORM-1202 (Time spin control)
    • Started implementing. Estimate ~ 12 hours.
    • Had troubles with my build while adding files for new TimeSpinCtrl widget. Unfortunately it took much time.

FUTURE

  • TASK STORM-1202 (Time spin control)

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • STORM-1215 : added comment to RB and discussed with Oz in IRC.
  • STORM-1100 : Per Oz's instruction in IRC added comment with specification of video card on my Linux laptop.
  • Set up development environment on Lunix notebook computer for basic work.
    • have one issue that is just a warning due to different compiler version between me and LL.

FUTURE

  • STORM-1215: will generate build logs for Oz when windows system is back up and running.
  • See Impediments.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.
  • Windows System for development work down till parts are received and


Past Updates

Aprli
27 | 26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16