Monday, January 10, 2011

General Notes


  • Reminder to devs. If a ticket doesn't pass Review and is rejected, it will move back to the To Do column in GH, if you do more work or clarify questions, it should be moved back through In Progress and then to In Review.
  • MMOTD: Merov
  • PE was on holiday Friday.

Team Status


Merov Linden


PAST

  • STORM-526 : Log out failure during Login causes loss of pending offers, including inventory : Look at that code, can't repro but pointed at potential issues, commented in JIRA
  • Cleaned-up sprint 9 stuff

FUTURE

  • sprint planning
  • STORM-745 : Produce comprehensive perf baseline: Complete that work.

IMPEDIMENTS

  • None

Oz Linden


PAST

  • Merge Monkey (up to 2.5.0-start tag), handed off to Merov
  • More looking at old VWR patches
  • Tracking down viewer dependencies
  • OH

FUTURE

  • Sprint planning
  • More VWR mining

IMPEDIMENTS

  • none

Q Linden


PAST

  • LL Planning meeting
  • STORM-34
  • STORM-777
  • SOCIAL-437 / VWR-24440
  • STORM-830
  • Blog post

FUTURE

  • STORM-830
  • Sprint planning
  • Triage

IMPEDIMENTS

  • none

Esbee Linden


PAST

  • HR stuff
  • Meetings, Email
  • Wrote Viewer 2.5 Beta 1 blog post
  • Played with Beta

FUTURE

  • Meetings
  • Sprint Planning
  • Rev Viewer 2.5 Beta 1 Blog post
  • Review Snowstorm Team product backlog and bug log
  • PO reviews for open tickets
  • Finish going through the list of VWRs assigned to PE (finally)
  • Plan update for system requirements
  • Look at VWR-18435 and VWR-24357 for Jonathan
  • Add instructions for STORM-236 for Wolfpup
  • Look at STORM-383, -797, -28, -447

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • STORM-370 (Human-readable name of region disappears from Location Bar after pressing ESC)
    • Fixed and sent for review

FUTURE

  • STORM-387 (Part of the table is hidden after increasing firsts column width in the floater and then dock it to the SP)
  • STORM-554 (NL - text overlapping in Build tools)