Snowstorm Daily Scrum Archive/01282011

From Second Life Wiki
< Snowstorm Daily Scrum Archive
Revision as of 01:00, 1 February 2011 by Grumpity ProductEngine (talk | contribs) (Created page with "{{Project Snowstorm Nav}} __TOC__ <br clear="all"/> == Friday, January 28, 2011 == === General Notes === ---- * MMOTD: Oz * Daily standup cancelled due to conflict with an all…")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Friday, January 28, 2011

General Notes


  • MMOTD: Oz
  • Daily standup cancelled due to conflict with an all-hands meeting.

Team Status


Merov Linden


PAST

  • STORM-749 : Alpha in KDU: Did extensive tests with a hacked premultiplied implementation. Results were unimpressive in perf and quality (see JIRA for details). Resolved as "Won't Finish".

FUTURE

  • STORM-746 : KDU Improvements: Compress j2c with precincts
  • STORM-937 : Path to python in /scripts/*.py file inconsistent

IMPEDIMENTS

  • none

Oz Linden


  • no report due to fire hazard: “too many balls in the air today, and I'm fried”

Q Linden


  • no report due to lots of meetings

Grumpity ProductEngine


PAST

  • scheduling for snowstorm and crashhunters
  • product triage
  • resolve iQA issues
  • PEQA:LL update

FUTURE

  • determine sprint goal for sprint 11
  • prepare for sprint planning
  • crashhunters
  • PO approval requirements

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • BUG STORM-507 (User that has sent p2p call invitation to other user, is not added to Recent tab)
    • WIP. Investigating. Estimate ~ 3-4 hours. I have never been working with IM part of Viewer's code. So investigation took a little bit more time than usual. Investigation of this part of code is also useful for STORM-680 (Avaline callers are added to the Recent list)

FUTURE

  • BUG STORM-507 (User that has sent p2p call invitation to other user, is not added to Recent tab)
  • BUG STORM-680 (Avaline callers are added to the Recent list)

IMPEDIMENTS

  • none

Seth Productengine


PAST

  • BUG (STORM-379) Content permissions aren't refreshed in the "Buy copy of" floater

FUTURE

  • Pick other issues from sprint 10.

IMPEDIMENTS

  • BUG (STORM-316) Debug: Inventory.Folders by Name/Sort by Date/Sort by Name/System Folders to Top Do not apply and settings changes do not persist after relogging.
    • Waiting for product owner answers.

Vadim Productengine


PAST

  • Bug VWR-24567 (The UI Hints are always on):

    • Resolved as misfiled.
  • Bug STORM-610 (Changes to Environment Editor: water color change is not saved):
    • Finally put a small fix on review.

FUTURE

  • Commit the STORM-610 fix if it passes code review.
  • Work on issues with the first-pass STORM-2 (Customizable viewer layouts) implementation.

IMPEDIMENTS

  • Question: should we implement story STORM-326 (persistent skies/water settings) ? By chance I've made 80% of its implementation, so I'd be glad to finish the work.
    • Answer: it’s waiting for you in Sprint 11

Andrey ProductEngine


PAST

  • picked up latest v-d build
  • verified bunch of integrated ticktes, but there left ~20 issues which cannot be verified due to lack of info or other problems
  • started regression testing of the build

FUTURE

  • proceed with regression testing

IMPEDIMENTS

  • list of issues which PEQA cannot verify

Jonathan Yapp


IMPEDIMENTS

  • STORM-829 and STORM-435 are done -- is someone going to move these through the system?