Snowstorm Daily Scrum Archive/05052011

From Second Life Wiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Sprint 15, ends 05.16.11

Thursday, May 5

Team Status


Oz Linden


PAST

  • More trial merges of mesh (not yet in viewer-development)
  • Planning contributor build system deployment
  • VWR Triage
  • Open Development User Group

FUTURE

  • Rewrite GPU table regression test (STORM-1100) in python
  • Windlight Project viewer build
  • Windlight spec review
  • Code reviews

IMPEDIMENTS

  • none

Wolf Linden


PAST

  • WLRS p. 23 follow up with Oz,
  • updated pg. 8,
  • finalized first draft of specs for customizable UI;
  • window UI work

FUTURE

  • More window UI work (making sure I've compiled list of all floaters, etc. and how they work);
  • publishing WLRS specs if there are no more comments

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • I10n new issues - prioritize, future process
  • WLRS
  • VWR triage

FUTURE

  • STORM-280 (uninstalling) - sort all related issues, close dupes, coordinate with chopper
  • storm triage
  • QA roundup

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • BUG STORM-1227 ([crashhunters] crash at LLDir_Win32::getNextFileInDir(std::basic_string,std::allocator > const &,std::basic_string,std::allocator > const &,std::basic_string,std::allocator > &) [secondlife-bin lldir_win32.cpp])
    • Tried to reproduce but had no luck.
  • TASK STORM-1202 ( TASK STORM-1202 (Time spin control))
    • WIP. Estimate ~10 hours.

FUTURE

  • TASK STORM-1202 ( TASK STORM-1202 (Time spin control))

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.6 beta build#2 r288224
    • smoke & integrity tests have been failed by two major tickets: VWR-25687, and EXP-749
    • also EXP-755 is reproducible, and VWR-25688 has been reported
  • verified EXP-752
  • continued with regression pass using 2.6.6 beta build
  • tested STORM-1093 changes on the PO build mentioned in the ticket

FUTURE

  • continue v-d testing

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Installed new Power Supply in Windows system and tested.
  • STORM-1100 : Per Oz's instruction in IRC added comment with specification of video card on my Linux laptop.
  • Set up development environment on Lunix notebook computer for basic work.
    • have one issue that is just a warning due to different compiler version between me and LL.

FUTURE

  • STORM-1215: will generate build logs for Oz when windows system is back up and running.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.
  • Weather, as it is storming here and causing power to intermittently go out and do not want to risk damaging new P/S.

Other notes


  • Cron Stardust has been (slowly) working on a change that reverses the gridlines UI, but it's only 50% done in about 2 months... Too many other interruptions in RL life.. :P (And no, I've not created a JIRA for the suggestion...)
  • Jonathan -> Wolf. Q: Storm-1068 decision. A: maps not yet a priority due to basic mode developments
  • audio problem fixed