Snowstorm Daily Scrum Archive/05162011

From Second Life Wiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Sprint 15, ends 05.16.11

Monday, May 16

Team Status


Oz Linden


PAST

  • Merge Monkeying - assorted late arrivals
  • Open Dev User Group
  • GPU table testing (built test viewer)

FUTURE

  • Integrate mesh?
  • Integrate GPU table updates
  • Sprint Planning

IMPEDIMENTS

  • none

Wolf Linden


PAST

  • Organizational meetings: Rhett, Oz

FUTURE

  • Check in with Grumpity
  • WLRS status review

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • VWR triage
  • Sprint retrospective
  • jira workflow changes for VWR triage
  • sprint 15 cleanup

FUTURE

  • sprint planning
  • meet with wolf

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • TASK STORM-1202 (Time spin control)
    • Made some changes according to Vadim's comments in review
  • BUG STORM-951 (Accidental Self-Muting/Self-Blocking)
    • WIP. Investigating possibilities to refactor fix for ticket according to Vadim's comments in review

FUTURE

  • STORM-1205 (Add "Environment" tab to the "Region/Estate" floater)

IMPEDIMENTS

  • none

Seth ProductEngine


PAST

  • TASK (STORM-1244) Implement Environment Settings floater
    • WIP. Integrating with Vadim's new way of storing/applying environment settings. 90% complete.

FUTURE

  • TASK (STORM-1244) Implement Environment Settings floater
  • TASK (STORM-1256) Region environment settings editor

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Task STORM-1245 (Implement new way of storing/applying environment settings):
    • Completed by adding region settings support (read-only).
    • After Seth finishes with the new Environment Settings Floater (hopefully today) we'll be ready to demonstrate the new basic WLRS UI.
  • Created JIRA tasks for the remaining WLRS work.

FUTURE

  • Help Seth with an assertion problem he's experiencing.
  • Proceed with WLRS tasks (probably skies management).

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up the latest v-d build r229908
  • verified 8 integrated tickets
  • started regression pass:
    • Notifications & Alerts
    • Busy Mode
    • MiniMap
    • World Map
    • About Land
    • ToS

FUTURE

  • pick up next beta build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • STORM-859 : created local and online repositories and also created issue on RB.
  • STORM-1100 : DLed test viewer which crashes on start on linux laptop so posted crash report log to issue.
  • Attended Open Development User Group meeting.
  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
    • Desiding on what type of build to work on next.

FUTURE

  • Working inworld(this is part of testing localy built viewers).

IMPEDIMENTS

  • Getting Autobuild system and seceurity software to play nicely on my system.