Snowstorm Daily Scrum Archive/09032010

From Second Life Wiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Friday, September 3, 2010

General Notes


  • Don't forget to grab tasks from the Sprint Backlog and update your time remaining on that task each day!
  • Merge Monkey of the Day: Merov

Team Status


Aimee


PAST

  • "As a developer, I would like to clean up the way the voice code shuts down, so that it doesn't leak memory and satifies my OCD".
  • Work out what's gone wrong with the hg convert process on james/viewer-identity-evolution
  • Hairy merge of james/viewer-identity-evolution with dessie/viewer-public to fix it.

FUTURE

  • Continue hairy merge of james/viewer-identity-evolution with dessie/viewer-public and hg convert.

IMPEDIMENTS

  • Will need a yes/no to integrate from design review of VWR-21253 before I can move onto that task, other stuff I can do for now though.


Tofu


OOO

Oz


PAST

  • Sent code review system request to systems team
  • Prepped discussion of upcoming common code split

FUTURE

  • Post first Development build on secondlife.com ?

IMPEDIMENTS

  • none not planned for

Merov


PAST

  • VWR-22761 : LLKDU upgrade:
    • Perf data instrumentation: created baseline using LLFastTimer but not enough info in there. Need to improve that system or go for a quick and dirty hack...
    • Created forked repos for indra-private and discussed with Alain. Newest Alain's code though doesn't build :(
    • Created forked merov_linden/viewer-development-vwr-22761 for this feature ('cause I'm gonna touch lots of things...)
  • Merge monkey: nothing to do 'cause Tofu stole all my toys...
  • Snowglobe OH

FUTURE

  • VWR-22761 : LLKDU upgrade: Modify LLFastTimer to allow "datasize" in and out tracking

IMPEDIMENTS

  • Kakadu license upgrade

Q


OOO

Esbee


PAST

  • Out half day yesterday
  • Great interview with Dusan Writer
  • Met about Jira triage
  • Started documenting how Jira VWR triage will work

FUTURE

  • Follow up on VWR-21253
  • Respond to Resident Viewer ideas
  • Groom backlog
  • Finish blog post about Product and Snowstorm
  • Edit Q's blog post

IMPEDIMENTS

  • None

Paul


PAST

  • TASK VWR-21585 (Make all tabs support horizontal resizing)
    • In progress. Estimate ~ 20 hours.

FUTURE

  • TASK VWR-21585 (Make all tabs support horizontal resizing)

IMPEDIMENTS

  • none

Andrew


PAST

  • Task VWR-20702 (Bottom bar button reordering):
    • Sub-task VWR-20705 (Drag&Drop implementation): Done, will commit shortly.
    • Sub-task VWR-20706 (Make sure auto-hiding and shrinking buttons still work): Done, will commit shortly.
    • Sub-task VWR-22690(Saving/restoring button order). Investigated. Estimate: 5 hours.

FUTURE

  • Finish and send for review VWR-20705 (Drag & Drop implementation) and VWR-20706 (Make sure auto-hiding and shrinking buttons still work).
  • VWR-22690 (Saving/restoring button order).

IMPEDIMENTS

  • none

Vadim


PAST

  • Task VWR-21127 (Implement saving size and position of detached tabs): Done.

FUTURE

  • Help Paul with VWR-21585, approve integrating the whole feature (although most was done today by Tofu)

IMPEDIMENTS

  • none

Sergey


PAST

  • Task (VWR-21060) Fix broken ability to open a side tray tab via shortcut, menu item or button outside of the Side Tray.
    • Completed. But later found more bugs, fixing them now.
  • Task (VWR-20696) Write code to allow for undocking/redocking of a sidebar tab: Done.
  • Task (VWR-20970) Implement undocking tabs by dragging: Done.

FUTURE

  • Task (VWR-21060) Fix broken ability to open a side tray tab via shortcut, menu item or button outside of the Side Tray.
    • Fix recently discovered bugs.

IMPEDIMENTS

  • Do we need a new art for "Undock" button in Side Tray. For now I used the existing floater "Tear Off" button.
  • Task (VWR-20697) Write code to allow for redocking of a sidebar tab

Anya


OOO