Snowstorm Daily Scrum Archive/05132011

From Second Life Wiki
Jump to navigation Jump to search


Sprint 15, ends 05.16.11

Friday, May 13

Team Status


Oz Linden


PAST

  • Merge Monkeying
  • Viewer Evolution User Group
  • GPU table testing
  • windlight project review

FUTURE

  • Check in GPU table & manual test script

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • storm triage and sprint cleaning
  • QA roundup

FUTURE

  • VWR triage
  • Sprint retrospective
  • Discuss with Oz:
    • add "verify" fix version?
    • add "unactionable" transition to needs more info state.
    • other jira transitions specified in VWR triage doc?
    • find (push to create?) list of currently supported versions.
    • is it possible to limit (or is it already limited?) who can "acknowledge" vwr issues?
    • is it possible to automatically uncheck approvals when issue is reopened by QA?

IMPEDIMENTS

  • none


Paul ProductEngine


PAST

  • TASK STORM-1202 (Time spin control)
    • Implemented. Sent for review.
  • STORM-1205 (Add "Environment" tab to the "Region/Estate" floater)
    • WIP. Investigating. Not providing the estimate until i've not investigated the task.

FUTURE

  • STORM-1205 (Add "Environment" tab to the "Region/Estate" floater)

IMPEDIMENTS

  • none

Seth ProductEngine


PAST

  • TASK (STORM-1244) Implement Environment Settings floater
    • XUI cleanup.
    • Investigating sky and water preset managers.

FUTURE

  • TASK (STORM-1244) Implement Environment Settings floater
    • Estimated: 4 - 6 hours

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Task STORM-1200 (Create fixed sun presets):
    • Submitted.
  • Task STORM-1245 (Implement new way of storing/applying environment settings):
    • WIP. Finished with local presets. Adding region settings support (r/o).

FUTURE

  • Complete STORM-1245, including integration with Seth's Environment Settings floater.
  • Create JIRA tickets for remaining tasks.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.6 release build r229662
  • smoke test has been failed by EXP-749 (the issue with voice indicator)
  • tested CHOP-663 according to the test plan on on wiki on all platforms
  • continued with STORM-1027 testing
    • testing on OSX and Windows - done
    • on Linux - in progress

FUTURE

  • pickup the latest v-d build and verify integrated issues

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Replaced Video card in Windows system.
  • Attended Viewer Evolution User Group meeting.
  • Working inworld (this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
    • Desiding on what type of build to work on next.
  • STORM-941 : Acceptance Criteria added.
  • STORM-859 : Tested Ardy's patch by manualy applying it to local repository.

FUTURE

  • STORM-859 : Create local and online repositories and RB issue so this can go through the steps needed for intergration.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.