Snowstorm Daily Scrum Archive/11052010
< Snowstorm Daily Scrum Archive
Jump to navigation
Jump to search
Revision as of 11:50, 8 November 2010 by Grumpity ProductEngine (talk | contribs) (Created page with '{{Project Snowstorm Nav}} __TOC__ <br clear="all"/> == Friday, November 5, 2010 == === General Notes === ---- * Merge Monkey of the Day: Oz * IMPORTANT: Please remember - whe...')
Friday, November 5, 2010
General Notes
- Merge Monkey of the Day: Oz
- IMPORTANT: Please remember - when merging your fixes into Beta, you must also pull them into viewer-development immediately after.
- If you take a bug off any of the bug queues, please move it to the current sprint.
- When you pick up an issue in current sprint, please set a time estimate before you start working on it.
Team Status
Merov Linden
PAST
- STORM-105 : Finished perf gathering:
- Pushed last set of changes, updated wiki, wrote test plan, submitted the whole thing to Vadim for review.
- Exchanged email with a community member about the use of this system for his own test
- Tests: kdu dynamic, openjpeg, kdu static. Can't upload them to wiki though... grrr...
- STORM-150 : Read most Kakadu docs, listed potentially interesting improvements to study, email Oz on some licensing issues
FUTURE
- STORM-150: Finish that
- STORM-104 : kdu upgrade: commit the static linking changes to dev repo
IMPEDIMENTS
- None!!
Oz Linden
PAST
- Rebuilt Beta repo (twice)
- Pulled 5 issues from integration queue
FUTURE
- Continue merge monkey (nothing currently queued)
- Finish setting up new TPV Directory
IMPEDIMENTS
- none
Q Linden
PAST
- Beta 3 checkin issues
- STORM-143 advice
- Testing for ER-146
FUTURE
- Beta 3 merges if they need help
- STORM-223
- Look at prefs code
- Triage
IMPEDIMENTS
- none
Esbee Linden
PAST
- Triage
- Prefs work prepped and sent out for review
- Started prim alignment design doc
- Test ER-146
FUTURE
- Update prefs design
- Finish design doc for prim alignment
- VWR Triage* Prioritizing tickets for team and queuing up more work
IMPEDIMENTS
- none
Paul ProductEngine
PAST
- BUG STORM-450 (Incorrect help contexts for Sidebar People tab)
- Fixed and sent for review
- BUG STORM-535 PLEASE allow adjustable transparency of "Nearby Chat" window, Chat History and Chat "Toasts" in Viewer 2.0!
- Investigating. Discussed with Vadim design issues. Estimate: approximately 8h.
FUTURE
- BUG STORM-535 PLEASE allow adjustable transparency of "Nearby Chat" window, Chat History and Chat "Toasts" in Viewer 2.0!
IMPEDIMENTS
- none
Seth Productengine
PAST
- BUG (STORM-441) "Events Details" floater does not contain information about event
- Closed as "Cannot Reproduce"
- BUG (STORM-189) [TRUNCATION] many langs - select build tools dialog
- Fixed.
- BUG (STORM-284) The "+" sign appears when user tries to drop a landmark to Favorites bar from in-world object contents
- Fixed.
FUTURE
- BUG (STORM-308) IM chiclet's speaking indicator isn't active while self-talking
- Estimated: 8 hours.
IMPEDIMENTS
- none
Andrew Productengine
PAST
- Major bug STORM-261 (In V2.2.0 Script Editor, cannot see any line
numbers other than the current one)
- Fixed and sent for review.
- Normal bug STORM-320 (Script Editor in Viewer 2.0+ "tabs" incorrectly)
- Investigating. Still not sure where the problem is. Estimate- 16 hours.
FUTURE
- STORM-320
IMPEDIMENTS
- none
Vadim Productengine
PAST
- Bug STORM-546 (Remove lots of dead renderForSelect() code from the rendering pipeline...):
** Applied and tested a 3rd-party fix.
- Bug STORM-225 (Massive lag spike when opening Land Related windows):
- Resolved as not reproducible.
- Bug STORM-257 (Camera view changes before avatar starts to turn):
- Resolved as not reproducible.
- Investigated LL unit testing framework.
FUTURE
- Story STORM-52 (Hook up external script editor).
No ETA yet.
IMPEDIMENTS
- PE devs need more tickets to work on.
Andrey Productengine
PAST
- verified v-d integrated tickets
- processed cannot reproduce, expected behavior STORM tickets
- started regression testing of v-d r213735 build
FUTURE
- proceed with regression testing of v-d
IMPEDIMENTS
- none