Snowstorm Daily Scrum Archive/11112010
< Snowstorm Daily Scrum Archive
Jump to navigation
Jump to search
Revision as of 12:16, 12 November 2010 by Grumpity ProductEngine (talk | contribs) (Created page with '{{Project Snowstorm Nav}} __TOC__ <br clear="all"/> == Thursday, November 11, 2010 == === General Notes === ---- * Merge Monkey of the Day: Oz * Beta 3 is out! * If an issue ...')
Thursday, November 11, 2010
General Notes
- Merge Monkey of the Day: Oz
- Beta 3 is out!
- If an issue is “In Progress” it should have a time estimate!
- Please remember - when merging your fixes into Beta, you must also pull them into viewer-development immediately after
- If you take a bug off any of the bug queues, please move it to the current sprint.
Team Status
Merov Linden
PAST
- STORM-105: Perf gathering: got internal feedback, did a last v-d merge and got it prepared for integration
- STORM-146: kdu-autobuild: created the repo , went through the whole autobuild config process, built the coresys lib, pushed 1st draft on remote hg
- STORM-151: kdu static link: created public dev repo and pushed current rearchitecture to dev repo
FUTURE
- STORM-146: kdu-autobuild: finish coresys building and packaging
- STORM-151: kdu static link: move things around so that it can build without dropping anything to source tree
IMPEDIMENTS
- None
Oz Linden
PAST
- Assorted wiki updates
- Merge Monkeying
FUTURE
- Continue merge monkey (9 issues currently queued)
- Continue working on library upgrade issues and documentation
- Start on setting up a reviewboard instance (thank you Q)
IMPEDIMENTS
- none
Q Linden
PAST
- Beta 3 release
- Planning / budgets
FUTURE
- Triage
- Meetings
IMPEDIMENTS
- none
Esbee Linden
- OOO
Paul ProductEngine
PAST
- BUG STORM-573 Move "Bubble Chat" preference from Advanced to Chat
- Fixed and sent to bitbucket
- BUG STORM-570 Layout cleanup in the General tab of Preferences
- Fixed and sent to bitbucket
- BUG STORM-575 Layout cleanup in the Chat tab of Preferences
- Fixed and sent to bitbucket
- BUG STORM-593 Make transparent texteditor and lineeditor
- Created bug
FUTURE
- STORM-587 Layout cleanup in the Advanced tab of Preferences
IMPEDIMENTS
- none
Seth Productengine
PAST
- BUG (STORM-581) IM toasts don't respect font color preferences for Chat
- Investigated. Asked for clarifications about unused color settings.
- BUG (STORM-578) SLURL font color in the nearby chat toast doesn't respect Chat preferences
- Fixed. Sent for review.
- BUG (STORM-579) Resident SLURL font color doesn't match Chat preferences for plain text Nearby Chat log
- Investigating.
FUTURE
- BUG (STORM-579) Resident SLURL font color doesn't match Chat preferences for plain text Nearby Chat log
- Estimated: 6 hours.
- BUG (STORM-581) IM toasts don't respect font color preferences for Chat
- Estimated: 2 hours if clarified in jira.
IMPEDIMENTS
- STORM-581
Andrew Productengine
PAST
- Major task STORM-566 (Add new tabs to Preferences)
- Implemented and pushed into STORM-31 repo.
- Normal task STORM-583 (Move colors-related preferences to the new Colors tab).
- Fixed and pushed into STORM-31 repo.
- Normal bug STORM-592 (Color swatches have a lot of unused and
uncustomizable space beneath them. Make it customizable).
- Encountered this problem while working on STORM-583. Created ticket, fixed and pushed into STORM-31 repo.
- Normal task STORM-582 (Take movement and camera control preferences from Advanced and move them to the new Move & View tab)
- WIP. Estimate- 3 hours.
FUTURE
- Major task STORM-576 (Add a Preference to allow users to enable
double-click to teleport or use auto-pilot)
- Normal task STORM-582 (Take movement and camera control preferences
from Advanced and move them to the new Move & View tab)
- Some other issues from STORM-31.
IMPEDIMENTS
- STORM-571, STORM-572
Vadim Productengine
PAST
- STORM-52 (Hook up external script editor):
- In progress, 70% complete.
FUTURE
- Complete STORM-52 implementation.
IMPEDIMENTS
- none
Andrey Productengine
PAST
- re-ran smoke and integrity tests against 2.3.0 Beta3 r214440
- completed regression testing of Beta3
FUTURE
- switch to the latest v-d build and verify integrated tickets
- start regression testing of v-d build
IMPEDIMENTS
- none
Wolfpup Lowenhar
PAST
- STORM-102 : received email from Leyla and did some digging in the code then emailed Leyla again. Also tried one possible way to make conversion but that failed to build
- attended Esbee's OH
- worked @ main job
FUTURE
- STORM-102 : Waiting on reply back from Leyla. More digging in the code.
IMPEDIMENTS
- Not enough time between working in world and a real job to actually work on code.
- Having to wait on emails.(but I know people @ LL are busy.)