Snowstorm Daily Scrum Archive/01242011

From Second Life Wiki
< Snowstorm Daily Scrum Archive
Revision as of 12:44, 25 January 2011 by Grumpity ProductEngine (talk | contribs) (Created page with "{{Project Snowstorm Nav}} __TOC__ <br clear="all"/> == Monday, January 24, 2011 == === General Notes === ---- * MMOTD: Oz * Please remember to put descriptions next to the jir…")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


Monday, January 24, 2011

General Notes


  • MMOTD: Oz
  • Please remember to put descriptions next to the jira number in your report when possible.

Team Status


Merov Linden


PAST

  • STORM-748 : Fixed TC builds, added KDU_X86_INTRINSICS to Mac and Windows builds. Linux already built with that by default. On Mac, no perf difference though. Need to measure on Windows.
  • Code reviews: more of this, only 2 (long ones) left to review...

FUTURE

  • SH-761, etc : get a clear merge list from shining
  • STORM-745 : Perf baseline : complete the plan as I wrote it
  • STORM-748 : Build with KDU_X86_INTRINSICS: build on Windows, measure perf

IMPEDIMENTS

  • none

Oz Linden


PAST

  • Merge Monkey
  • Patch triage from codereview
  • Updates to Third Party Viewer Directory
  • STORM-312

FUTURE

  • Merge Monkey
  • More code reviews
  • STORM-312

IMPEDIMENTS

  • none

Q Linden


PAST

  • Planning trip to SF
  • Planning meetings and presentations in SF

FUTURE

  • Between travel and OOO time, will not be available tomorrow at all.
  • Will not attend tomorrow's scrum or other meetings.

IMPEDIMENTS

  • none; see you Wed.

Paul ProductEngine


PAST

  • BUG STORM-513 ("Allow media to auto - play" check-box is enable after Media check-box was unchecked)
    • Fixed. Will correct some issue according to Vadim's commentaries and send for review. Estimate ~ 10 minutes.
  • Installed Windows 7 on my machine. Finished installing and configuring all needed software for SL in VS 2005. Built and ran it. Unfortunately it took more time than i expected.
  • Almost finished with configuring in Ubuntu. Estimate ~ 1 hour.

FUTURE

  • Finish configuring SL in Ubuntu
  • BUG STORM-513 ("Allow media to auto - play" check-box is enable after Media check-box was unchecked)
  • Other tickets by priority

IMPEDIMENTS

  • none

Seth Productengine


PAST

  • Story (STORM-526) Log out failure during Login causes loss of pending offers, including inventory
    • Found possible reason for inventory loss, described it in jira. Deferring work on this issue until I have some ideas on how to confirm my assumptions and ways to fix the issue.

FUTURE

  • BUG (STORM-843) Inventory incremental string search not working (search starts over)

IMPEDIMENTS

  • BUG (STORM-316) Debug: Inventory.Folders by Name/Sort by Date/Sort by Name/System Folders to Top Do not apply and settings changes do not persist after relogging.
    • Waiting for product owner answers.

Vadim Productengine


PAST

  • Assisted Paul with setting up Windows dev environment.
  • Bug STORM-610 (Changes to Environment Editor: water color change is not saved): WIP.

FUTURE

  • Fix STORM-610.
  • Other bugs.

IMPEDIMENTS

  • Need PO answer in STORM-2 (Customizable viewer layouts).

Andrey ProductEngine


PAST

  • corrected Inspectors, My Inventory, and Object Profile test plans. See "TPEQA Test Plans" shared folder
  • integrated tickets verification
  • proceeded with regression testing of v-d r219350 build

FUTURE

  • pickup 2.5.0 Beta2 build?
  • continue reviewing of SideBar test plans, we have no a good one for My Landmarks and Create/View/Edit Landmarks

IMPEDIMENTS

  • none

Jonathan Yap


PAST

  • STORM-845 (Up arrow icon on nearby chat for "Shows/hides nearby chat log" always shows as an up arrow. Should change to down arrow to indicate close when log is open

FUTURE

  • STORM - 845

IMPEDIMENTS

  • None

Cummere Mayo


PAST

  • pretriage vwr patches
  • rechecked a couple of snow issues
  • design sketches
  • tested the storm-236 test build.

FUTURE

  • viewer testing for develper, developement, and firestorm
  • more jira organization/cleanup
  • some feature requests i want to do
  • some feature requests i want to update

IMPEDIMENTS

  • exahausted
  • rl work
  • other commitments