Tuesday, January 25, 2011
General Notes
- MMOTD: Oz
- Q is on the way to SF so OOO all day.
- “Q flies through sheer force of will, the plane just follows” © Gez
Team Status
Merov Linden
PAST
- STORM-745 : Perf baseline : Completed for all platforms. Updated wiki. Moved to review.
- STORM-748 : Use KDU_X86_INTRINSICS : Results were actually worse with than without (i.e. KDU slower with that option). We won't be using it then. Updated wiki. Moved to review for closing.
- SH-761, etc : rapidly checked the merge done by Bao
FUTURE
- OH and SNOW triaging
- STORM-749 : Alpha in KDU
IMPEDIMENTS
- none
Oz Linden
PAST
- More updates to Third Party Viewer Directory
- Merge Monkey
- Patch triage from codereview
- Cataloging viewer dependencies
FUTURE
- Merge Monkey
- Review viewer autobuild usage & docs
IMPEDIMENTS
- none
Q Linden
- OOO - travel
Paul ProductEngine
PAST
- Finished with configuring SL in Ubuntu
- BUG STORM-351 (Scrolling flat list by mouse wheel changes zoom level in-world)
- WIP. For now it's hard to give any estimates, I'm investigating this issue. But don't think it'll take much time.
FUTURE
- BUG STORM-351 (Scrolling flat list by mouse wheel changes zoom level in-world)
- BUG STORM-513 ("Allow media to auto - play" check-box is enable after Media check-box was unchecked)
IMPEDIMENTS
- none
Seth Productengine
PAST
- Story (STORM-526) Log out failure during Login causes loss of pending offers, including inventory
- Investigating new logs provided in jira. Could not figure out the cause of the problem.
- BUG (STORM-843) Inventory incremental string search not working (search starts over)
- Fixed. Sent for review.
FUTURE
- BUG (STORM-397) Dropping wearables from a notecard to COF should be prohibited
- Estimated: 4 hours.
- BUG (STORM-379) Content permissions aren't refreshed in the "Buy copy of" floater
- Estimated: 6-8 hours.
IMPEDIMENTS
- BUG (STORM-316) Debug: Inventory.Folders by Name/Sort by Date/Sort by Name/System Folders to Top Do not apply and settings changes do not persist after relogging.
- Waiting for product owner answers.
Vadim Productengine
PAST
- Bug STORM-610 (Changes to Environment Editor: water color change is not saved):
- working on solution. It's a bit more than just fixing a bug: I'm effectively implementing persistent preset selection (STORM-326), but there seems to be no other way.
- Filed SVC-6706 (No way to determine whether a script in agent inventory is compiled to Mono).
FUTURE
- STORM-610 (ETA: 1-2d)
IMPEDIMENTS
- Need PO answer in STORM-2 (Customizable viewer layouts).
Andrey ProductEngine
PAST
- picked up 2.5.0 Beta2 219342 build
- smoke & integrity tests have been passed
- started Beta2 bug-fixes verification
FUTURE
- run regression suite against Beta2
IMPEDIMENTS
- clarify regression scope with Bambers
Jonathan Yap
PAST
- STORM-845 (Up arrow icon on nearby chat for "Shows/hides nearby chat log" always shows as an up arrow. Should change to down arrow to indicate close when log is open)
- Done.
FUTURE
IMPEDIMENTS
- None
Wolfpup Lowenhar
PAST
- Worked @ RL and in world.
- STORM-236 : now is fully working and had Oz do test builds on TC. also worked on debuging issue with loss of resizability when disabeling Voice(hiding Speak button)
FUTURE
- Work @ RL and in world.
- STORM-236 :Conttinue deguning loss of resize of nearby chat.
- VWR-24256 : continue to monitor.
IMPEDIMENTS
- Not enough time between working in-world and at real job to actually work on code.
Cummere Mayo
PAST
- followed up on some vwr issues
- tested the storm-2 test build and provided feedback on the jira.
- created VWR-24611 as a result of storm-2 testing
- tested firestorm test build for comparison to currant snowstorm builds. Noted some nice features I would like to see imported into snowstorm
- wrote two guest entries for JayR's blog about 1.5/1.6
FUTURE
- viewer testing for develper, developement, and firestorm
- more jira organization/cleanup
- more followups on jira
IMPEDIMENTS
- exhausted
- rl work
- other commitments