Snowstorm Daily Scrum Archive/05132011
< Snowstorm Daily Scrum Archive
Jump to navigation
Jump to search
Revision as of 23:00, 16 May 2011 by Grumpity ProductEngine (talk | contribs)
Sprint 15, ends 05.16.11
Friday, May 13
Team Status
Oz Linden
PAST
- Merge Monkeying
- Viewer Evolution User Group
- GPU table testing
- windlight project review
FUTURE
- Check in GPU table & manual test script
IMPEDIMENTS
- none
Grumpity ProductEngine
PAST
- storm triage and sprint cleaning
- QA roundup
FUTURE
- VWR triage
- Sprint retrospective
- Discuss with Oz:
- add "verify" fix version?
- add "unactionable" transition to needs more info state.
- other jira transitions specified in VWR triage doc?
- find (push to create?) list of currently supported versions.
- is it possible to limit (or is it already limited?) who can "acknowledge" vwr issues?
- is it possible to automatically uncheck approvals when issue is reopened by QA?
IMPEDIMENTS
- none
Paul ProductEngine
PAST
- TASK STORM-1202 (Time spin control)
- Implemented. Sent for review.
- STORM-1205 (Add "Environment" tab to the "Region/Estate" floater)
- WIP. Investigating. Not providing the estimate until i've not investigated the task.
FUTURE
- STORM-1205 (Add "Environment" tab to the "Region/Estate" floater)
IMPEDIMENTS
- none
Seth ProductEngine
PAST
- TASK (STORM-1244) Implement Environment Settings floater
- XUI cleanup.
- Investigating sky and water preset managers.
FUTURE
- TASK (STORM-1244) Implement Environment Settings floater
- Estimated: 4 - 6 hours
IMPEDIMENTS
- none
Vadim ProductEngine
PAST
- Task STORM-1200 (Create fixed sun presets):
- Submitted.
- Task STORM-1245 (Implement new way of storing/applying environment settings):
- WIP. Finished with local presets. Adding region settings support (r/o).
FUTURE
- Complete STORM-1245, including integration with Seth's Environment Settings floater.
- Create JIRA tickets for remaining tasks.
IMPEDIMENTS
- none
Andrey ProductEngine
PAST
- picked up 2.6.6 release build r229662
- smoke test has been failed by EXP-749 (the issue with voice indicator)
- tested CHOP-663 according to the test plan on on wiki on all platforms
- continued with STORM-1027 testing
- testing on OSX and Windows - done
- on Linux - in progress
FUTURE
- pickup the latest v-d build and verify integrated issues
IMPEDIMENTS
- none
Wolfpup Lowenhar
PAST
- Replaced Video card in Windows system.
- Attended Viewer Evolution User Group meeting.
- Working inworld (this is part of testing localy built viewers).
- Checking on horses and bundles, plus work on note cards for them.
- Desiding on what type of build to work on next.
- STORM-941 : Acceptance Criteria added.
- STORM-859 : Tested Ardy's patch by manualy applying it to local repository.
FUTURE
- STORM-859 : Create local and online repositories and RB issue so this can go through the steps needed for intergration.
IMPEDIMENTS
- Getting Autobuild system and security software to play nicely on my system.