Thursday, February 3

General Notes


  • Please do not pick up issues tagged with needs-design until the tag has been removed.
  • MMOTD: Merov
  • Please remember to move issues to current Sprint when a) starting work on them or b) accepting issues from the community

Team Status


Merov Linden


PAST

  • More SNOW triaging: only a dozen left to go...
  • Merge Monkeying: push fixes in both viewer-beta and viewer-development, PO build
  • STORM-864 : APR memory pool : finished code review, did a test build, plenty of issues. Rejected review. See JIRA for details.

FUTURE

  • MM
  • STORM-864 : APR memory pool : waiting on Aleric, suspecting some apr bundling issues on Linux and Windows
  • STORM-955 : Massively duplicated objects : keep an eyes on this
  • STORM-746 : KDU Improvements: Compress j2c with precincts

IMPEDIMENTS

  • none

Oz Linden


PAST

  • Created 'Open Development' jira project
  • Non-Snowstorm activities
  • Started discussions about open data APIs

FUTURE

  • Review autobuild changes from NickyP
  • Document policies and test new jira project rules
  • PO Review
  • Internal Linden training session

IMPEDIMENTS

  • none

Q Linden


PAST

  • STORM-465
  • Triage tooling attempt (which sadly failed, but i have ideas)
  • OOO / Doctor
  • beta 3

FUTURE

  • beta 3
  • internal training session
  • OOO late today and all day tomorrow
  • spend time with wolf but probably not 'til monday

IMPEDIMENTS

  • none, other than time

Grumpity ProductEngine


PAST

  • prep for product tirage
  • a bit more jira cleanup
  • non-snowstorm stuff

FUTURE

  • PEQA deferred issues triage with Bambers
  • continue to prod others to resolve impediments
    • STORM-379, STORM-465

IMPEDIMENTS

  • we need more vwr triage - bug queue is getting empty

Paul ProductEngine


PAST

  • BUG STORM-680 (Avaline callers are added to the Recent list)
    • WIP. 90%. Estimate 2 hours. Implementing the solution.

FUTURE

  • Finish with BUG STORM-680 (Avaline callers are added to the Recent list)

IMPEDIMENTS

  • Today's progress is not very good because of headache. Today will go home a little bit earlier, feel bad.

Seth Productengine


PAST

  • BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text
    • Found that reshaping text editor with a friendship offer fixes its placement. Still looking for more precise reason of the problem

FUTURE

  • BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text
    • Estimated: 8-10 hours.

IMPEDIMENTS

  • BUG (STORM-379) Content permissions aren't refreshed in the "Buy copy of" floater.
    • Asked in JIRA whether the bug should be fixed in a way that may increase server load.

Vadim Productengine


PAST

  • Looked through high impact issues (in code familiar to me) from the recent Coverity report.
    • Haven't found anything dangerous (and even if I had found something, I don't know the process to handle such issues).
  • Story STORM-2 (Customizable viewer layouts):
    • Working on saving sidebar state. Stuck with handling minimization.
    • I remember Andrew mentioning a bug in LLFloaterReg which may cause it to misbehave. Will try consulting with him tomorrow.

FUTURE

  • Will work on STORM-2 at least till the end of week.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up Beta3 build#2 (r220251)
  • executed smoke and integrity tests on Windows, Linux and OSX. See IQA-80 for more details.
    • smoke on Linux has been failed but it looks like specific environment issue (?)
  • proceeded with v-d regression testing, see spreadsheet
  • reported 2 issues: VWR-24714 and VWR-24715

FUTURE

  • investigate VWR-24714
  • verify integrated STORM tickets against the latest v-d build FUTURE

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Worked @ RL .
  • STORM-236 : began debuging issue with button layout resized issues. Also discussed this with Oz in IRC.

FUTURE

  • Work @ RL
  • STORM-941 : email Oz and Leyla concering posible areas that could be causeing the problem.

IMPEDIMENTS

  • STORM-236 : waiting for new graphics and name to call the panel.
  • Not enough time to actually work on code.
  • Computer repair Client that dose not know what non repairable means and keeps trying to have me fix a unit that is beyond repair.

Jonathan Yap


PAST

  • VWR-24628 (Descriptive text missing next to first checkbox in About Land/Access)
    • This had to be fixed first in order to work on Storm - 953. 4 other people helped with this! This was my proudest moment as a developer. Great team effort. Easy fix but caused by low-level routine change.
  • STORM-953 (Clarify what happens when you uncheck Allow Public Access)

FUTURE

IMPEDIMENTS

  • VWR - 24628 needs to be pulled in to Storm-nnnn
  • Waiting for Oz to Storm-nnnn-ize my bug list.

Cummere Mayo


PAST

  • jira stuff
  • lots of office hours
  • getting in trouble ><
  • testing correct po build

FUTURE

  • new blog posts
  • not totally sure

IMPEDIMENTS

  • time