Snowstorm Daily Scrum Archive/02082011

From Second Life Wiki
< Snowstorm Daily Scrum Archive
Revision as of 12:22, 9 February 2011 by Grumpity ProductEngine (talk | contribs) (Created page with "{{Project Snowstorm Nav}} __TOC__ <br clear="all"/> == Tuesday, February 8 == === General Notes === ---- * MMOTD: Merov ===Team Status=== ---- ==== Merov Linden==== ---- <b>P…")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search



Tuesday, February 8

General Notes


  • MMOTD: Merov

Team Status


Merov Linden


PAST

  • STORM-955 : Massively duplicated objects : Tested that it merges fine and builds on all platforms. Moved to review.
  • STORM-864 : APR memory pool : Proposed a new simpler fix for the Windows build issue. No more issue with Linux and does not require rebuilding apr_suite.
  • STORM-746 : KDU Improvements: Compress j2c with precincts: Thinking that we need an independent test app so to get really reproducible data here. Discussed with QA folks about creating an llimage_libtest under indra/integration_tests. Putting together a short spec for this.

FUTURE

  • MM
  • STORM-746 : KDU Improvements: Compress j2c with precincts: Try to write a first version of llimage_libtest.

IMPEDIMENTS

  • Lots of JIRA in review lane missing PO acceptance. Need test build?

Oz Linden


PAST

  • More work on open-1
  • Lots of work User Groups

FUTURE

  • Continue testing new jira project rules
  • Work on open-4: FMOD packaging for viewer-autobuild

IMPEDIMENTS

  • none

Q Linden


PAST

  • beta -> release
  • internal meetings
  • user group stuff
  • STORM-969 / ER-493 -- changes for land owner categories

FUTURE

  • release
  • writing some documents
  • triage
  • internal meetings

IMPEDIMENTS

  • none

Wolf Linden


PAST

  • Reviewed process with Anya

FUTURE

  • Working on Storm-236 (speak button, handle issue)
  • Reviewing "needs design" tasks with Rhett

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunters
  • imported issues for Jonathan, except the needs-design one
  • release readiness discussions
  • talked to Search team

FUTURE

  • jira cleanup
  • calendar updates
  • product triage
  • consider STORM triage in addition to VWR

IMPEDIMENTS

  • none

Paul Productengine


PAST

  • BUG STORM-680 (Avaline callers are added to the Recent list)
    • Fixed. Tomorrow will test and send for review.

FUTURE

  • BUG STORM-357 (Gestures button is in the pressed state after drag-n-drop but gestures list isn't visible)

IMPEDIMENTS

  • For STORM-888 (As a resident I want to access all the display name prefs in the same place so that I'm not hunting for the different options) there should be a design. It's not clear for now how exacly this should be done.
    • A: please wait for Wolf to complete design.

Seth Productengine


PAST

  • BUG (STORM-833) "i" button is overlaid with Group Members name
    • Investigated, found the cause of the problem. Working on fix.

FUTURE

  • BUG (STORM-833) "i" button is overlaid with Group Members name
    • Estimated: 2-3 hours.
  • BUG (STORM-939) Opening multiple inventory floaters causes viewer to lag or even crash
    • Estimated: 10-12 hours.

IMPEDIMENTS

  • Bug STORM-526 (Log out failure during Login causes loss of pending offers, including inventory):
    • Cannot reproduce, seems to be account specific. Need help to find the repro steps.
  • Story STORM-873 (Keyboard shortcut or text interface command to Accept Friends request): Asked for more details and clarifications.
    • A: please wait for Wolf to complete design

Vadim Productengine


  • OOO - vacation

Andrey ProductEngine


PAST

  • continued v-d regression testing. See spreadsheet.
  • reported 1 issue: VWR-24747
  • verified: none
  • revised Chat and Nearby Panel test plans

FUTURE

  • pickup next Beta build?
  • revise Build tools test plan

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • STORM-236 : Waiting for email form Richard.
  • OPEN-9 : Tested Nicky's sugestion and did not get the same output still getting same information.

FUTURE

  • Be At Hospital roommate having surgery.
  • STORM-941 : email Oz and Leyla concerning possible areas that could be causing the problem.(still need to do this)

IMPEDIMENTS

  • STORM-236 : waiting for new graphics and email from Richard.
  • Not enough time to actually work on code.
  • Roommate in hospital.

Jonathan Yap


PAST

  • STORM-977 (llmediaplugintest shows up even though -DLL_TESTS:BOOL=OFF has been used)

Finished. Put on Review Board.

FUTURE

  • STORM-976 (Object muted by name still displays notification message when clicked)

IMPEDIMENTS

  • none

Cummere Mayo


PAST

FUTURE

  • office hours
  • jira stuff
  • more research on privacy especially related to parcel_media_comand_agent
  • SL rollar derby practice!

IMPEDIMENTS

  • none