Snowstorm Daily Scrum Archive/10212010

From Second Life Wiki
< Snowstorm Daily Scrum Archive
Revision as of 16:26, 24 October 2010 by Grumpity ProductEngine (talk | contribs) (Created page with '{{Project Snowstorm Nav}} __TOC__ <br clear="all"/> == Thursday, October 21, 2010 == === General Notes === ---- * Merge Monkey of the Day: Oz ===Team Status=== ---- ==== Mer...')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


Thursday, October 21, 2010

General Notes


  • Merge Monkey of the Day: Oz

Team Status


Merov Linden


PAST

  • STORM-423: Created a changeset, ready for review
  • STORM-406: Discussed with lkalif. Updated build wiki. Ready for review.
  • STORM-173: Found a repro case at last.
  • Merge Monkey-ing

FUTURE

  • STORM-173: Study and fix or leave it that way.
  • STORM-104: kdu upgrade
  • STORM-105 : Perf decompression: put new data out, check the work done by opensource-dev community on similar tests.

IMPEDIMENTS

  • Latest KDU bits: still waiting...

Oz Linden


PAST

  • Lots of internal discussion re: develop site
  • Discuss opening map javascript
  • Office Hour

... not very productive day, somehow...

FUTURE

  • Meetings regarding new TPV directory site
  • Review backlog for osdev candidate issues w/ Esbee
  • Learn how to do library change tests in TeamCity

IMPEDIMENTS

  • none

Q Linden


PAST

* Move my desk
* Work on an internal tool
* Process documentation
* Meetings

FUTURE

* Process negotiation
* Meetings
* Code tomorrow?

IMPEDIMENTS

  • Too much time spent educating others on process

Esbee Linden


PAST

  • Draft of Viewer 2.3 Beta 1 Announcement Blog Post
  • Coordinating Viewer 2.3 Beta 1 release
  • Viewer Beta and Release Process work
  • VWR Triage
  • Started Prefs requirements work
  • Beat Q, Gez, and Nyx at Dominion

FUTURE

  • Continue work on Viewer 2.3 Beta 1 blog post
  • Systems requirements analysis
  • Preferences review
  • VWR Triage
  • Viewer 2.3 Beta 1 Release Coordination
  • Mockup wiki page for Viewer downloads
  • Review STORM-255
  • Finish chart reporting review on Jira

IMPEDIMENTS

  • None (just time)

Paul ProductEngine


PAST

  • STORM-39 As a User, I want to control how long a chat toast appears before it fades. Please add fade time back to Chat preferences.
    • Completed first part of the task. Tomorrow will continue the rest of the task.

FUTURE

  • STORM-39 As a User, I want to control how long a chat toast appears before it fades. Please add fade time back to Chat preferences.

IMPEDIMENTS

  • none

Seth Productengine


PAST

  • BUG (STORM-426) Menu button looks as being pressed while its menu is displayed by another control
    • WIP.
    • Added visibility change signal to LLMenuGL. Faced the problem with hideMenus() changing menu visibility prior to menu button's mouse down handler.

FUTURE

  • BUG (STORM-426) Menu button looks as being pressed while its menu is displayed by another control
    • Estimated: 4 hours.
  • BUG (STORM-296) Cursor doesn't change when trying to drag and drop non-landmark items into Favorites folder

IMPEDIMENTS

  • none

Andrew Productengine


PAST

  • Bug STORM-322 (Group Mem
  • Bug STORM-322 (Group Member Search: gives more entries then the search string suggests)
    • Fixed the bug. Will add saving of member list order in setting, test and put on review. Estimate - 2 hours.

FUTURE

  • Finish STORM-322.
  • Critical bug STORM-95 (Upload hangs client).

IMPEDIMENTS

  • none

Vadim Productengine


PAST

  • Bug STORM-311 ("Share" button is enabled if select non worn wearable and wear it):

    • Fixed.
  • Bug STORM-419 (Port of SNOW-422 to SG 2.0: <anonymous>' is used uninitialized in this function inlldarray.h):


** Submitted a 3rd party patch.

  • Bug STORM-417 (Port of SNOW-140 to SG 2.0 : Forced updates not working on Mac):


** Submitted a 3rd party patch.

  • Found a workaround for the build problem described in STORM-406.
  • Consulted Seth about STORM-426.

FUTURE

  • will pick something from sprint 6

IMPEDIMENTS

  • Need Q to answer in STORM-297.
  • Need more tickets targeted for sprint 6.
  • There is a showstopper bug STORM-182 which is still targeted to 2.2.0 beta. It seems to be wrong.

Andrey Productengine


PAST

  • Viewer 2.3.0 Beta1 integrity tests are passed on Win;
  • Viewer 2.3.0 Beta1 smoke tests are passed on OSX and almost done on Windows and Linux
  • started regression testing of Viewer 2.3.0 Beta1

FUTURE

  • finish smoke tests on Windows and Linux
  • proceed with regression tests

IMPEDIMENTS

  • none