Difference between revisions of "Snowstorm Daily Scrum Archive"
Jump to navigation
Jump to search
Esbee Linden (talk | contribs) (→Oz) |
Esbee Linden (talk | contribs) (→Merov) |
||
Line 54: | Line 54: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | * LLKDU in viewer-development: Analyzed the llkdu.dll crash on Windows on launch. Aimee was right : we will have to port all of SNOW-345 (see http://jira.secondlife.com/browse/SNOW-345) fixes to Snowstorm. The good news is I know what to do now. The bad news is that last time I did it consumed 3 days to get things right. I'm thinking of ways to just tease the lib without rebuilding it and point install.xml to it. | ||
* Got all my bitbucket and TeamCity ducks in a row: there's now a merov_linden/viewer-development-import repo (same model as Aimee's) | |||
* Snowglobe: completed cleanup of 1.x (SNOW-713 issues) | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * LLKDU in viewer-development: Try the fixed llkdu.dll from Snowglobe 1.4 bluntly as a test | ||
* LLKDU in viewer-development: Move the relevant SNOW-345 changes to Snowstorm | |||
* LLKDU in viewer-development: Modify build.sh to download the llkdu libs even when -DINSTALL_PROPRIETARY:BOOL=ON is not set | |||
* LLKDU in viewer-development: Create a separate private repo for building llkdu cleaning from code (need to double check that with brad) | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
* | * None | ||
==== Q ==== | ==== Q ==== |
Revision as of 06:22, 20 August 2010
Project Snowstorm Daily Scrum Archive
Friday, August 20, 2010
General Notes
- Q OOO until further notice
- Don't forget to update the time you spent on a task in the Sprint Backlog at the end of each day!
Team Status
Aimee
PAST
- Staged some more build fixes from Snowglobe into aimee_linden/viewer-development-import
- Merged into to viewer-development
- More Mercurial and bitbucket guidance to open source contributors
- Helped Oz get SSH to Bitbucket going
FUTURE
- Pull in some more Snowglobe fixes
- Merge from aimee_linden/viewer-development-import to viewer-development
- Find out what we're doing about stuff in viewer-public and viewer-release? Merge / convert / merge?
IMPEDIMENTS
- None.
Tofu
OOO
Oz
PAST
- Fixed ssh authentication problem (thanks Aimee)
- Process discussions
- Got deeper training on TeamCity
- Discussions with tools team on common code issues
- Set up new canonical build for viewer-development (changed 'oz' to 'snowstorm' in name).
- Set up experimental repository & build
- Code review of submission from WolfPup (building now)
FUTURE
- More wiki improvements
- Post archive of Wednesdays OH
- Add transcriber to this scrum meeting space
IMPEDIMENTS
- none
Merov
PAST
- LLKDU in viewer-development: Analyzed the llkdu.dll crash on Windows on launch. Aimee was right : we will have to port all of SNOW-345 (see http://jira.secondlife.com/browse/SNOW-345) fixes to Snowstorm. The good news is I know what to do now. The bad news is that last time I did it consumed 3 days to get things right. I'm thinking of ways to just tease the lib without rebuilding it and point install.xml to it.
- Got all my bitbucket and TeamCity ducks in a row: there's now a merov_linden/viewer-development-import repo (same model as Aimee's)
- Snowglobe: completed cleanup of 1.x (SNOW-713 issues)
FUTURE
- LLKDU in viewer-development: Try the fixed llkdu.dll from Snowglobe 1.4 bluntly as a test
- LLKDU in viewer-development: Move the relevant SNOW-345 changes to Snowstorm
- LLKDU in viewer-development: Modify build.sh to download the llkdu libs even when -DINSTALL_PROPRIETARY:BOOL=ON is not set
- LLKDU in viewer-development: Create a separate private repo for building llkdu cleaning from code (need to double check that with brad)
IMPEDIMENTS
- None
Q
OOO
Esbee
PAST
FUTURE
IMPEDIMENTS
- None
Paul
PAST
FUTURE
IMPEDIMENTS
Andrew
PAST
FUTURE
IMPEDIMENTS
Vadim
PAST
FUTURE
IMPEDIMENTS
Sergey
PAST
FUTURE
IMPEDIMENTS
Anya
PAST
FUTURE
IMPEDIMENTS
Past Updates
- Monday, August 16, 2010
- Tuesday, August 17, 2010 - No Daily Scrum today, Sprint 2 Planning took place
- Wednesday, August 18, 2010
- Thursday, August 19, 2010