Difference between revisions of "Snowstorm Daily Scrum Archive"
Jump to navigation
Jump to search
Esbee Linden (talk | contribs) |
Esbee Linden (talk | contribs) |
||
Line 3: | Line 3: | ||
<br clear="all"/> | <br clear="all"/> | ||
== | == Wednesday, September 8, 2010 == | ||
=== General Notes === | === General Notes === | ||
Line 14: | Line 14: | ||
====Aimee==== | ====Aimee==== | ||
---- | |||
OOO | |||
====Tofu==== | |||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | * More integrations | ||
* | * VWR-20756 / llTextBox support | ||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * VWR-20756 / llTextBox support | ||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
* | * these progress reports I'm writing aren't making it out to the public summary for some reason. I'm busy, honest! | ||
Line 42: | Line 34: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* Sent out Snowglobe wind-down plan | |||
* Updated Snowstorm dashboard in new Jira (broken - see Impediments) | |||
* Many more wiki updates (getting there) | * Many more wiki updates (getting there) | ||
<b>FUTURE</b> | <b>FUTURE</b><br /> | ||
* | * more wiki updates | ||
* Update submission workflow descriptions (see Impediments) | |||
* Update submission workflow | |||
<b>IMPEDIMENTS</b> | <b>IMPEDIMENTS</b><br /> | ||
* | * Need clarification on how Snowstorm project is to be used | ||
Line 58: | Line 50: | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* VWR-22761 : LLKDU upgrade: Perf tracking | * VWR-22761 : LLKDU upgrade: Perf tracking | ||
** | ** Rearchitectured and simplified LLMetricPerformanceTester | ||
** | ** More documentation done LLMetricPerformanceTester and documented it | ||
** | ** Built but didn't commit yet | ||
* Last Snowglobe OH and follow up | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* VWR-22761 : LLKDU upgrade: | * VWR-22761 : LLKDU upgrade: Finish the Perf tracking work and publish wiki about it, get baseline data for KDU and Openjpeg | ||
* VWR-22759 : Chat Translator: Check with Esbee where we stand wrt design review | * VWR-22759 : Chat Translator: Check with Esbee where we stand wrt design review | ||
Line 78: | Line 71: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | * Responded to a good chunk of Resident feedback (still _LOTS_ to get through) | ||
* Accessibility meeting with Orange Planer and LordGregGreg | |||
* Worked on UI customization sketches and blog post | |||
* Accessibility meeting with Orange Planer and | |||
* | |||
* Backlog grooming | * Backlog grooming | ||
* Send feedback to PE on detachable sidebars | * Send feedback to PE on detachable sidebars | ||
* Review double-click to TP | * Review double-click to TP | ||
* Catch up with Merov on VWR-22759 | * Catch up with Merov on VWR-22759 | ||
<b>FUTURE</b><br /> | |||
* Schedule meeting with Orange, Gentle, and LordGregGreg for next week. | |||
* Share UI customization notes and sketches with Rhett from XD team | |||
* Prepare draft of Jira VWR workflow proposal and discuss w/Q | |||
* Move Snowstorm Backlog to Jira | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
* | * Not receiving Tofu's email to mailing list | ||
Line 101: | Line 92: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | *VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu) | ||
**In progress. ~ 2 hours | |||
*Very unproductive day - spent most time building and setting up | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu) | ||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
* | *none | ||
Line 113: | Line 106: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | *went through all tickets assigned to me - found 3 that were reopened b/c fix didn't make it into development right away, but fixes are there now. | ||
* | **will close in new jira | ||
* Bug VWR-22008 (People you called via Adhoc are not shown in Recent tab). | |||
**fixed consistent with recent for p2p, but exchange in comments suggests a different way may be needed. Asked Andrey, will either commit fix or change it, in which case estimate 4-5h. | |||
*Major bug VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window). | |||
**Investigated. 3-4h. | |||
*played with new jira | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window). | ||
* VWR-22008 (People you called via Adhoc are not shown in Recent tab) | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
Line 126: | Line 125: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | *reviewed Aimee's fix | ||
* | *fixed Paul's build | ||
*played with new jira. Looks like VWR workflow is unchanged, and glitchy - impossible to close VWR-20699 as Misfiled for example. | |||
* | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | *fresh bugs and small tasks for detachable tabs | ||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
* | * where should viewer bugs go? VWR or STORM? (Answer: VWR - Esbee) | ||
* workflow in VWR is broken. Will investigate today. (Anything in particular that's broken? - Esbee) | |||
====Sergey==== | ====Sergey==== | ||
---- | ---- | ||
OOO- Vacation | |||
====Andrey==== | |||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | * smoke test against r209053, see shared spreadsheet | ||
** | * VWR-20694 test per request. Found 7 issues, but didn't report them yet: | ||
* | ** empty space appears in the top of Home panel on redocking | ||
* | ** hard to resize undocked panel by height/width, need to place mouse pointer very precisely on bottom/right side of undocked panel | ||
** there should be minimal width/height for undocked panels. for Appearance SP at least, some buttons overlap other controls when minimum width is set | |||
** verb buttons disappear for profile SPs on minimize/restore (Person, Group, Object) | |||
** unable to share an item when My Inventory SP is undocked, docked IM window hides | |||
** camera view angle resets when do Edit Outfit panel dock/undock | |||
** sometimes on restore undocked panel appears behind of stack of minimized panels | |||
* bunch of issues non-related to side panels docking/undocking | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * file issues to GH | ||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
* | * jira workflow | ||
Line 163: | Line 164: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | *played with new jira | ||
*added link to Smoke test results to wiki | |||
*server testing - permissions followup | |||
*workflow followup | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | *new jira | ||
* | *find workflow answers about filing bugs and managing VWR issues. (Sue/Bambers) | ||
*detachable sidebar & bottom bar review | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
* | *see Vadim's quesitons | ||
Revision as of 20:57, 8 September 2010
Wednesday, September 8, 2010
General Notes
- Don't forget to grab tasks from the Sprint Backlog and update your time remaining on that task each day!
- Merge Monkey of the Day: Merov
Team Status
Aimee
OOO
Tofu
PAST
- More integrations
- VWR-20756 / llTextBox support
FUTURE
- VWR-20756 / llTextBox support
IMPEDIMENTS
- these progress reports I'm writing aren't making it out to the public summary for some reason. I'm busy, honest!
Oz
PAST
- Sent out Snowglobe wind-down plan
- Updated Snowstorm dashboard in new Jira (broken - see Impediments)
- Many more wiki updates (getting there)
FUTURE
- more wiki updates
- Update submission workflow descriptions (see Impediments)
IMPEDIMENTS
- Need clarification on how Snowstorm project is to be used
Merov
PAST
- VWR-22761 : LLKDU upgrade: Perf tracking
- Rearchitectured and simplified LLMetricPerformanceTester
- More documentation done LLMetricPerformanceTester and documented it
- Built but didn't commit yet
- Last Snowglobe OH and follow up
FUTURE
- VWR-22761 : LLKDU upgrade: Finish the Perf tracking work and publish wiki about it, get baseline data for KDU and Openjpeg
- VWR-22759 : Chat Translator: Check with Esbee where we stand wrt design review
IMPEDIMENTS
- Kakadu license upgrade
Q
OOO
Esbee
PAST
- Responded to a good chunk of Resident feedback (still _LOTS_ to get through)
- Accessibility meeting with Orange Planer and LordGregGreg
- Worked on UI customization sketches and blog post
- Backlog grooming
- Send feedback to PE on detachable sidebars
- Review double-click to TP
- Catch up with Merov on VWR-22759
FUTURE
- Schedule meeting with Orange, Gentle, and LordGregGreg for next week.
- Share UI customization notes and sketches with Rhett from XD team
- Prepare draft of Jira VWR workflow proposal and discuss w/Q
- Move Snowstorm Backlog to Jira
IMPEDIMENTS
- Not receiving Tofu's email to mailing list
Paul
PAST
- VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
- In progress. ~ 2 hours
- Very unproductive day - spent most time building and setting up
FUTURE
- VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
IMPEDIMENTS
- none
Andrew
PAST
- went through all tickets assigned to me - found 3 that were reopened b/c fix didn't make it into development right away, but fixes are there now.
- will close in new jira
- Bug VWR-22008 (People you called via Adhoc are not shown in Recent tab).
- fixed consistent with recent for p2p, but exchange in comments suggests a different way may be needed. Asked Andrey, will either commit fix or change it, in which case estimate 4-5h.
- Major bug VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
- Investigated. 3-4h.
- played with new jira
FUTURE
- VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
- VWR-22008 (People you called via Adhoc are not shown in Recent tab)
IMPEDIMENTS
- none
Vadim
PAST
- reviewed Aimee's fix
- fixed Paul's build
- played with new jira. Looks like VWR workflow is unchanged, and glitchy - impossible to close VWR-20699 as Misfiled for example.
FUTURE
- fresh bugs and small tasks for detachable tabs
IMPEDIMENTS
- where should viewer bugs go? VWR or STORM? (Answer: VWR - Esbee)
- workflow in VWR is broken. Will investigate today. (Anything in particular that's broken? - Esbee)
Sergey
OOO- Vacation
Andrey
PAST
- smoke test against r209053, see shared spreadsheet
- VWR-20694 test per request. Found 7 issues, but didn't report them yet:
- empty space appears in the top of Home panel on redocking
- hard to resize undocked panel by height/width, need to place mouse pointer very precisely on bottom/right side of undocked panel
- there should be minimal width/height for undocked panels. for Appearance SP at least, some buttons overlap other controls when minimum width is set
- verb buttons disappear for profile SPs on minimize/restore (Person, Group, Object)
- unable to share an item when My Inventory SP is undocked, docked IM window hides
- camera view angle resets when do Edit Outfit panel dock/undock
- sometimes on restore undocked panel appears behind of stack of minimized panels
- bunch of issues non-related to side panels docking/undocking
FUTURE
- file issues to GH
IMPEDIMENTS
- jira workflow
Anya
PAST
- played with new jira
- added link to Smoke test results to wiki
- server testing - permissions followup
- workflow followup
FUTURE
- new jira
- find workflow answers about filing bugs and managing VWR issues. (Sue/Bambers)
- detachable sidebar & bottom bar review
IMPEDIMENTS
- see Vadim's quesitons
Past Updates
- Tuesday, September 7, 2010
- Monday, September 6, 2010 - No Daily Scrum, Labor Day Holiday
- Friday, September 3, 2010
- Thursday, September 2, 2010
- Wednesday, September 1, 2010
- Tuesday, August 31, 2010 - No Daily Scrum, Sprint 2 Retrospective & Sprint 3 Planning Meetings took place
- Monday, August 30, 2010
- Friday, August 27, 2010 - No Daily Scrum, Sprint 2 Review took place
- Thursday, August 26, 2010
- Wednesday, August 25, 2010
- Tuesday, August 24, 2010
- Monday, August 23, 2010
- Friday, August 20, 2010
- Thursday, August 19, 2010
- Wednesday, August 18, 2010
- Tuesday, August 17, 2010 - No Daily Scrum, Sprint 2 Planning took place
- Monday, August 16, 2010