Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Tuesday, September 7, 2010 ==
== Wednesday, September 8, 2010 ==


=== General Notes ===
=== General Notes ===
Line 14: Line 14:


====Aimee====
====Aimee====
----
OOO
====Tofu====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Completed hairy merge of james/viewer-identity-evolution with dessie/viewer-public
* More integrations
* hg converted and merged display-names with viewer-development.
* VWR-20756 / llTextBox support
* Update licenses to LGPL in new files introduced for display-names.
* Requested code review of VWR-21253 (friend permission icons)
* Sorting out lots of legal paperwork :(


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Integrate VWR-21253 (friend permission icons).
* VWR-20756 / llTextBox support
* Remerge minimap avatar inspectors into display-names branch, conflicted with other work there and got stomped on in the merge.
* Investigate another potential problem with the hg convert process to avoid us getting bitten by it.
* Catch up on opensource-dev
* Will be OOO Weds and Thurs.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Awaiting code review for VWR-21253
* these progress reports I'm writing aren't making it out to the public summary for some reason. I'm busy, honest!
* Need design review of double-click teleport before integrating, where do we want to move the option to?
 
 
====Tofu====
----
<i>No status given</i>




Line 42: Line 34:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Sent out Snowglobe wind-down plan
* Updated Snowstorm dashboard in new Jira (broken - see Impediments)
* Many more wiki updates (getting there)
* Many more wiki updates (getting there)
* wrote a blog post on LGPL license usage


<b>FUTURE</b>
<b>FUTURE</b><br />
* Discuss upcoming common code split at open source meeting today
* more wiki updates
* Update Snowstorm dashboard in new Jira when it comes up
* Update submission workflow descriptions (see Impediments)
* Update submission workflow


<b>IMPEDIMENTS</b>
<b>IMPEDIMENTS</b><br />
* none not planned for
* Need clarification on how Snowstorm project is to be used




Line 58: Line 50:
<b>PAST</b><br />
<b>PAST</b><br />
* VWR-22761 : LLKDU upgrade: Perf tracking
* VWR-22761 : LLKDU upgrade: Perf tracking
** Move LLMetricPerformanceTester files from newview to llcommon
** Rearchitectured and simplified LLMetricPerformanceTester
** Cleanup LLMetricPerformanceTester and documented it
** More documentation done LLMetricPerformanceTester and documented it
** Implemented in llimagej2c to get decompression data
** Built but didn't commit yet
* Last Snowglobe OH and follow up


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* VWR-22761 : LLKDU upgrade: Complete the Perf tracking work and publish wiki about it, get baseline data for KDU and Openjpeg
* VWR-22761 : LLKDU upgrade: Finish the Perf tracking work and publish wiki about it, get baseline data for KDU and Openjpeg
* VWR-22759 : Chat Translator: Check with Esbee where we stand wrt design review
* VWR-22759 : Chat Translator: Check with Esbee where we stand wrt design review


Line 78: Line 71:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Looked at VWR-21253. Sent feedback.
* Responded to a good chunk of Resident feedback (still _LOTS_ to get through)
* Backlog updates
* Accessibility meeting with Orange Planer and LordGregGreg
* Finished intro blog post
* Worked on UI customization sketches and blog post
* Edited Q's Blog post
* Worked on blog post and sketches about UI customization
 
<b>FUTURE</b><br />
* Respond to Resident feedback
* Accessibility meeting with Orange Planer and Gentle Heron
* Finish UI customization blog post and share with Rhett
* Backlog grooming
* Backlog grooming
* Send feedback to PE on detachable sidebars
* Send feedback to PE on detachable sidebars
* Work on Jira VWR workflow proposal and send to Q for review
* Review double-click to TP  
* Review double-click to TP  
* Catch up with Merov on VWR-22759
* Catch up with Merov on VWR-22759
<b>FUTURE</b><br />
* Schedule meeting with Orange, Gentle, and LordGregGreg for next week.
* Share UI customization notes and sketches with Rhett from XD team
* Prepare draft of  Jira VWR workflow proposal and discuss w/Q
* Move Snowstorm Backlog to Jira


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* Not receiving Tofu's email to mailing list




Line 101: Line 92:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*HDD is dead. Spent all day setting up.
*VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
**In progress. ~ 2 hours
*Very unproductive day - spent most time building and setting up


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* TASK VWR-21585 (Make all tabs support horizontal resizing)
* VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*new setup should work
*none




Line 113: Line 106:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*Implemented sub-task VWR-22690 (Saving/restoring button order),
*went through all tickets assigned to me - found 3 that were reopened b/c fix didn't make it into development right away, but fixes are there now.
*All subtask reviews passed, completed test plans, created account on bitbucket, added changes with my comments: Subtask VWR-20702 (bottom bar button ordering) is done! yay!
**will close in new jira
* Bug VWR-22008 (People you called via Adhoc are not shown in Recent tab).
**fixed consistent with recent for p2p, but exchange in comments suggests a different way may be needed.  Asked Andrey, will either commit fix or change it, in which case estimate 4-5h.
*Major bug VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
**Investigated.  3-4h.
*played with new jira


<b>FUTURE</b><br />
<b>FUTURE</b><br />
*bugs. finally.
* VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
* VWR-22008 (People you called via Adhoc are not shown in Recent tab)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 126: Line 125:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*Task VWR-20694 (Detachable SB tabs):
*reviewed Aimee's fix
**Submitted new images for dock/undock buttons.
*fixed Paul's build
**Marked all subtasks as ready to integrate (and Tofu immediately integrated them all).
*played with new jiraLooks like VWR workflow is unchanged, and glitchy - impossible to close VWR-20699 as Misfiled for example.  
*found bug with disappearing buttons in flat list view and investigated.   
**found cause - Richard did some optimization that went awry.
**once new Jira is ready, will file a ticket and assign to him.  
*We've finished all leftover tasks from Sprint 2 (detachable SB tabs, reordering bottom tray buttons)


<b>FUTURE</b><br />
<b>FUTURE</b><br />
*Review Aimee's fix (review request on snowstorm list)
*fresh bugs and small tasks for detachable tabs
*File bug for disappearing buttons and assign to Richard
 
*Take tickets assigned to Sergey (vacation)
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*none
* where should viewer bugs go? VWR or STORM? (Answer: VWR - Esbee)
* workflow in VWR is broken. Will investigate today. (Anything in particular that's broken? - Esbee)




====Sergey====
====Sergey====
----
----
OOO- Vacation
====Andrey====
<b>PAST</b><br />
<b>PAST</b><br />
* Task (VWR-21060) Fix broken ability to open a side tray tab via shortcut, menu item or button outside of the Side Tray.
* smoke test against r209053, see shared spreadsheet
** Completed. But later found more bugs, fixing them now.
* VWR-20694 test per request. Found 7 issues, but didn't report them yet:
* Task (VWR-20696) Write code to allow for undocking/redocking of a sidebar tab: Done.
** empty space appears in the top of Home panel on redocking
* Task (VWR-20970) Implement undocking tabs by dragging: Done.
** hard to resize undocked panel by height/width, need to place mouse pointer very precisely on bottom/right side of undocked  panel
** there should be minimal width/height for  undocked panels. for Appearance SP at least, some buttons overlap other  controls when minimum width is set
** verb buttons disappear for profile SPs on minimize/restore (Person, Group, Object)
** unable to share an item when My Inventory SP is undocked, docked IM window hides
** camera view angle resets when do Edit Outfit panel dock/undock
** sometimes on restore undocked panel appears behind of stack of minimized panels
* bunch of issues non-related to side panels docking/undocking


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Task (VWR-21060) Fix broken ability to open a side tray tab via shortcut, menu item or button outside of the Side Tray.
* file issues to GH
** Fix recently discovered bugs.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*Do we need a new art for "Undock" button in Side Tray. For now I used the existing floater "Tear Off" button.
* jira workflow
* Task (VWR-20697) Write code to allow for redocking of a sidebar tab




Line 163: Line 164:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* OOO
*played with new jira
*added link to Smoke test results to wiki
*server testing - permissions followup
*workflow followup


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* catchup
*new jira
* new jira
*find workflow answers about filing bugs and managing VWR issues. (Sue/Bambers)
*detachable sidebar & bottom bar review


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
*see Vadim's quesitons





Revision as of 20:57, 8 September 2010


Wednesday, September 8, 2010

General Notes


  • Don't forget to grab tasks from the Sprint Backlog and update your time remaining on that task each day!
  • Merge Monkey of the Day: Merov

Team Status


Aimee


OOO


Tofu


PAST

  • More integrations
  • VWR-20756 / llTextBox support

FUTURE

  • VWR-20756 / llTextBox support

IMPEDIMENTS

  • these progress reports I'm writing aren't making it out to the public summary for some reason. I'm busy, honest!


Oz


PAST

  • Sent out Snowglobe wind-down plan
  • Updated Snowstorm dashboard in new Jira (broken - see Impediments)
  • Many more wiki updates (getting there)

FUTURE

  • more wiki updates
  • Update submission workflow descriptions (see Impediments)

IMPEDIMENTS

  • Need clarification on how Snowstorm project is to be used


Merov


PAST

  • VWR-22761 : LLKDU upgrade: Perf tracking
    • Rearchitectured and simplified LLMetricPerformanceTester
    • More documentation done LLMetricPerformanceTester and documented it
    • Built but didn't commit yet
  • Last Snowglobe OH and follow up

FUTURE

  • VWR-22761 : LLKDU upgrade: Finish the Perf tracking work and publish wiki about it, get baseline data for KDU and Openjpeg
  • VWR-22759 : Chat Translator: Check with Esbee where we stand wrt design review

IMPEDIMENTS

  • Kakadu license upgrade


Q


OOO


Esbee


PAST

  • Responded to a good chunk of Resident feedback (still _LOTS_ to get through)
  • Accessibility meeting with Orange Planer and LordGregGreg
  • Worked on UI customization sketches and blog post
  • Backlog grooming
  • Send feedback to PE on detachable sidebars
  • Review double-click to TP
  • Catch up with Merov on VWR-22759

FUTURE

  • Schedule meeting with Orange, Gentle, and LordGregGreg for next week.
  • Share UI customization notes and sketches with Rhett from XD team
  • Prepare draft of Jira VWR workflow proposal and discuss w/Q
  • Move Snowstorm Backlog to Jira

IMPEDIMENTS

  • Not receiving Tofu's email to mailing list


Paul


PAST

  • VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
    • In progress. ~ 2 hours
  • Very unproductive day - spent most time building and setting up

FUTURE

  • VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)

IMPEDIMENTS

  • none


Andrew


PAST

  • went through all tickets assigned to me - found 3 that were reopened b/c fix didn't make it into development right away, but fixes are there now.
    • will close in new jira
  • Bug VWR-22008 (People you called via Adhoc are not shown in Recent tab).
    • fixed consistent with recent for p2p, but exchange in comments suggests a different way may be needed. Asked Andrey, will either commit fix or change it, in which case estimate 4-5h.
  • Major bug VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
    • Investigated. 3-4h.
  • played with new jira

FUTURE

  • VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
  • VWR-22008 (People you called via Adhoc are not shown in Recent tab)

IMPEDIMENTS

  • none


Vadim


PAST

  • reviewed Aimee's fix
  • fixed Paul's build
  • played with new jira. Looks like VWR workflow is unchanged, and glitchy - impossible to close VWR-20699 as Misfiled for example.

FUTURE

  • fresh bugs and small tasks for detachable tabs

IMPEDIMENTS

  • where should viewer bugs go? VWR or STORM? (Answer: VWR - Esbee)
  • workflow in VWR is broken. Will investigate today. (Anything in particular that's broken? - Esbee)


Sergey


OOO- Vacation

Andrey

PAST

  • smoke test against r209053, see shared spreadsheet
  • VWR-20694 test per request. Found 7 issues, but didn't report them yet:
    • empty space appears in the top of Home panel on redocking
    • hard to resize undocked panel by height/width, need to place mouse pointer very precisely on bottom/right side of undocked panel
    • there should be minimal width/height for undocked panels. for Appearance SP at least, some buttons overlap other controls when minimum width is set
    • verb buttons disappear for profile SPs on minimize/restore (Person, Group, Object)
    • unable to share an item when My Inventory SP is undocked, docked IM window hides
    • camera view angle resets when do Edit Outfit panel dock/undock
    • sometimes on restore undocked panel appears behind of stack of minimized panels
  • bunch of issues non-related to side panels docking/undocking

FUTURE

  • file issues to GH

IMPEDIMENTS

  • jira workflow


Anya


PAST

  • played with new jira
  • added link to Smoke test results to wiki
  • server testing - permissions followup
  • workflow followup

FUTURE

  • new jira
  • find workflow answers about filing bugs and managing VWR issues. (Sue/Bambers)
  • detachable sidebar & bottom bar review

IMPEDIMENTS

  • see Vadim's quesitons


Past Updates