Difference between revisions of "Snowstorm Daily Scrum Archive/09132010"

From Second Life Wiki
Jump to navigation Jump to search
(Created page with '== Thursday, September 9, 2010 == === General Notes === ---- * Don't forget to grab tasks from the Sprint Backlog and update your time remaining on that task each day! * Merge ...')
 
(Blanked the page)
Line 1: Line 1:
== Thursday, September 9, 2010 ==


=== General Notes ===
----
* Don't forget to grab tasks from the Sprint Backlog and update your time remaining on that task each day!
* Merge Monkey of the Day: Merov
===Team Status===
----
====Aimee Linden====
----
OOO
====Tofu Linden====
----
<b>PAST</b><br />
* DEV-30773 llTextBox()
* Some Coverity bug fixes
* SNOW-606 juggling (and ultimate backout)
* Some OOO
<b>FUTURE</b><br />
* DEV-30773 llTextBox()
* Make myself a teamcity task for staging
* Some OOO
<b>IMPEDIMENTS</b><br />
* Linux build machine needs a bit of system-image love - little fuzzy on who owns that, pinged CG and Sabin.
====Oz Linden====
----
OOO
====Merov Linden====
----
<b>PAST</b><br />
* VWR-22761 : LLKDU upgrade: Perf tracking
** Got a KDU baseline and compared with OpenJpeg. First data show that OpenJpeg 4 times slower in decompression than KDU.
** Posted a doc: https://wiki.secondlife.com/wiki/Performance_Testers
** First commit to dev repo : https://bitbucket.org/merov_linden/viewer-development-vwr-22761/changeset/71b1676532b3
* VWR-22759 : Chat Translator: Got green from Esbee and Q on Design Review
<b>FUTURE</b><br />
* VWR-22761 : LLKDU upgrade: Polish doc, get more baseline data
* VWR-22759 : Chat Translator: Move to next stage
<b>IMPEDIMENTS</b><br />
* Kakadu license upgrade
====Q Linden====
----
OOO
====Esbee Linden====
----
<b>PAST</b><br />
* Worked on draft of  Jira VWR workflow proposal and discuss w/Q
* Moved Snowstorm Team Backlog to GH
* Trying out new Jira VWR workflows
<b>FUTURE</b><br />
* Schedule meeting with Orange, Gentle, and LordGregGreg for next week.
* Share UI customization notes and sketches with Rhett from XD team
* Finish draft of  Jira VWR workflow proposal
* Set up sprints in GH
<b>IMPEDIMENTS</b><br />
* Not receiving Tofu's email to mailing list (still not sure why)
====Paul ProductEngine ====
----
<b>PAST</b><br />
* VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
**Corrected according to Vadim's commentaries
<b>FUTURE</b><br />
* VWR-22169 (Delete outfit confirmation message doesn'r appear if use context or gear menu on 'My Outfits' tab) estimate ~ 8 hours
<b>IMPEDIMENTS</b><br />
*none
====Andrew ProductEngine====
----
<b>PAST</b><br />
*Bug VWR-22008 (People you called via Adhoc are not shown in Recent tab).
**Discussed with Andrey, didn't find solution.  Will ask in jira when able to add watchers
* Major bug VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
**Found problem.  Took more time due to additional bug (VWR-22898 - Some buttons disappear when clicked)
**Fixed, will apply fix when Richard fixes  VWR-22898 (Vadim linked them)
* Bug VWR-22888 (Empty space appears in the top of Home side panel after redocking)
**WIP. Estimate - 6h
<b>FUTURE</b><br />
*VWR-22888 (Empty space appears in the top of Home side panel after redocking)
<b>IMPEDIMENTS</b><br />
* none
====Vadim ProductEngine====
----
<b>PAST</b><br />
* sent email to viewer-tech about problems building on Ubuntu 10.04, Tofu immediately merged the fix.
** later it turned out fix broke the build on LL servers, fix has been rolled back, discussion continues (?)
* Filed a ticket (VWR-22898) regarding disappearing buttons problem.
*Bug VWR-22891 (Docked IM window hides when try to share an        item while My Inventory SP is undocked):

**Fixed
* Bug VWR-22896 (Panel state resets on dock/undock):
**Fixed but want to test some more to prevent accidental regressions
<b>FUTURE</b><br />
*Paul's review request
*Finish VWR-22896
*Other bugs
<b>IMPEDIMENTS</b><br />
* None
====Seth ProductEngine (Sergey)====
----
OOO- Vacation
====Andrey ProductEngine====
<b>PAST</b><br />
* filed issues discovered yesterday during smoke test and VWR-20694 testing
* started revision of existing TPE "regression" suite for viewer
<b>FUTURE</b><br />
* complete revision and identify gaps (Home, Picks/Classifieds, My Profile have no "formal" regression cases at least)
* add sidetray panel docking/undocking test cases
<b>IMPEDIMENTS</b><br />
* none
====Grumpity ProductEngine (Anya)====
----
<b>PAST</b><br />
*played with new jira
*workflow followup
*server testing followup
<b>FUTURE</b><br />
*detachable sidebar & bottom bar review
*transition issues from VWR to STORM?
*update sprint backlog
<b>IMPEDIMENTS</b><br />
*cannot transition issues from VWR to STORM

Revision as of 11:17, 14 September 2010