Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 188: Line 188:


== Past Updates ==
== Past Updates ==
* [[Snowstorm_Daily_Scrum_Archive/08242010 | Tuesday, August 24, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08232010 | Monday, August 23, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08232010 | Monday, August 23, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08202010 | Friday, August 20, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08202010 | Friday, August 20, 2010]]

Revision as of 19:21, 25 August 2010


Tuesday, August 24, 2010

General Notes



Team Status


Aimee


PAST

  • Set myself up another BitBucket repo for general bug fixes.
  • Checked the list of missing files named in the HG convert export map Nat found to be missing from the repo, and why.
  • (5 are new files in viewer-public, 1 renamed with both names in the map, 2 relating to the old art/libs bundles no longer required, and the NL XUI translation filenames got mangled somehow).
  • Pulled the two fixes from my bug-fix branch into viewer-development
  • Fixed EXT-8300 / EXT-8398 (Avatar icons displaced from SLURL profile links), just awaiting review before committing.

FUTURE

  • Continue with Snowglobe fixes
  • When exactly are we declaring final cut-off on viewer-public and viewer-release today? Who is doing final convert and merge?
  • Chase up review of EXT-8300 / EXT-8398 from Richard (or find someone else to do it!)
  • These two EXTs if they get added to the sprint? (Have fixes ready).
    • EXT-8248 (Can't teleport multiple friends)
    • EXT-1579 (No (easy) way to see who has permission to 'See my online status', 'See me on the map', or 'Edit, delete or take my objects')
  • Remember to collect my mother from the hospital before someone else claims her.

IMPEDIMENTS

  • None

Tofu


PAST

  • OOO. Some catch-up, some tree juggling.
  • Mined viewer-public for stuff that's there which isn't in snowstorm - there's quite a lot. Preparing to convert that legacy repo and relocate its changes.

FUTURE

  • Deal with viewer-public's changes.
  • Look for things needing code reviews.

IMPEDIMENTS

  • None.


Oz


PAST

  • LL repo conversion handholding

FUTURE

  • ?

IMPEDIMENTS

  • Non-Snowstorm tasks (no help for it)
  • Lost track of the issue for aligning textures?


Merov


PAST

  • LLKDU in viewer-development: Create new kdu-binaries for Windows: done or, rather, synced with alain who was working on it independently. Checked that it works on local build.
  • LLKDU in viewer-development: Read install.py in details to understand why those are not installed as requested...: The problem comes from kdu-binaries not being asked by anyone... It's unclear though if we can really continue to provide that lib to download willy nilly. Need a license check here.
  • LLKDU in viewer-development: Create a separate private repo for building llkdu cleaning from code (need to double check that with brad): Done by alain so not an issue anymore though now we have to integrate that *fast*.

FUTURE

  • LLKDU in viewer-development: Modify build.sh so that downloading just llkdu.dll and nothing else works in TeamCity (build fails right now)

IMPEDIMENTS

  • None


Q


OOO


Esbee


PAST

  • Finished sketch undockable/dockable sidebar design
  • Continue Jira triage
  • Lots of meetings

FUTURE

  • Discuss sidebar undocking with Rhett
  • Set up weekly office hours to discuss product backlog and ideas!
  • Start adding Resident feedback/ideas/user stories to the Snowstorm Backlog on a new tab
  • Continue to follow up on SLCC and Snowstorm blog feedback
  • Document idea submission process

IMPEDIMENTS

  • None


Paul


PAST

  • BUG EXT-8362 ([TRUNCATION] IT login screen - truncation in location box)
    • Pushed
  • BUG EXT-8672 ([HARD CODED] ALL LANGS The word "Saved" is hard coded, in the long timestamp displayed in IM when user is offline)
    • Pushed
  • BUG EXT-7878 (Corrupted vertical scroll bar appears on 'Edit Outfit' panel if height of 'Add More' panel was changed)
    • Pushed
  • BUG EXT-7951 (Mini-Location panel appearance design issues)
    • Restored in viewer-development repository.
  • BUG EXT-8558 (Add More category picker defaults whenever a clothing item is removed)
    • Fixed and sent for a review

FUTURE

  • EXT-8722 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)

IMPEDIMENTS

  • none


Andrew


PAST

  • Task VWR-20702 (Snowstorm Sprint 2: As a User who's customized the bottom bar of the Viewer UI, I also want to be able to control the order of the buttons as they appear in the UI.)
    • WIP. Estimate ~3 days.

FUTURE

  • Task VWR-20702
    • analyze d&d in favorites, add similar to bottom tray
    • change order of buttons shrinking and disappearing depending on button locations
    • save order in settings and use it when creating bottom tray
    • investigate inconsistency in distance between buttons

IMPEDIMENTS

  • Order of buttons shrinking and disappearing


Vadim


PAST

  • Critical bug EXT-8727 (Crash in LLAppearanceMgr::updateClothingOrderingInfo):
    • Posted a defensive fix for review (could not repro though).
  • Task VWR-20694 (Enable sidebar to track detaching/attaching tabs):
    • Filed, working on it
  • Code review, merge.

FUTURE:

  • Commit EXT-8727 if it gets approved.
  • Work on VWR-20694.

IMPEDIMENTS

  • none


Sergey


PAST

  • Task (VWR-20694) As a User, I want to undock tabs from the Viewer sidebar so that I can control what tabs are displayed and organize them on my screen in any way I want like I could do in 1.23.
    • WIP.
  • Fixed some crashes caused by docking/re-docking tabs.
  • Investigating undocked tab visibility changes when switching tabs in Side Tray.

FUTURE
Task (VWR-20694) As a User, I want to undock tabs from the Viewer sidebar ... Estimated: 3 days for sub-tasks 4 and 5.

IMPEDIMENTS

  • need design soon


Anya


PAST

  • sidebar docking/undocking design issues (VWR-20694)
  • bottom bar button reordering design issues (VWR-20702)
  • jira VWR workflow wrangling
  • tracking missing fixes
  • progress tracking

FUTURE

  • completed/in progress tasks need estimates / burndown data
  • establish procedure for taking EXTs from old PE backlog to particular sprint
  • follow up future commit process

IMPEDIMENTS

  • out thu-fri next week


Past Updates