Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 195: Line 195:


== Past Updates ==
== Past Updates ==
* [[Snowstorm_Daily_Scrum_Archive/08252010 | Wednesday, August 25, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08242010 | Tuesday, August 24, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08242010 | Tuesday, August 24, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08232010 | Monday, August 23, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08232010 | Monday, August 23, 2010]]

Revision as of 13:13, 26 August 2010


Wednesday, August 25, 2010

General Notes



Team Status


Aimee


PAST

  • Repo and build shuffling, created a Project-Viewer-Builds project on TeamCity to separate them out from the Release-Viewer-Builds project.
  • Updated BuildParams to use CG's new build_debug_release_separately flag..
  • Pulled EXT-8300 / EXT-8398 (Avatar icons displaced from SLURL profile links) fix into viewer-development.
  • Rebased EXT-1579 and EXT-8248 work into a new viewer-development-tweaks repo for my experimental stuff.
  • Double-checked with Tofu for any new files to be added to the map for converting viewer-public.

FUTURE

  • Double-click teleport.
  • Get back to importing Snowglobe build fixes
  • Check with CG about renaming TeamCity projects to Viewer-Release-Builds, and Viewer-Project-Builds so that they sort together in the project list. May also need Viewer-Aimee's-Builds as I seem to be accumulating enough for my own project :)

IMPEDIMENTS

  • None


Tofu


PAST

  • Converted viewer-public to new repo format
    • Ready to merge to viewer-development if there are no objections (this

is stuff that was aimed at Viewer 2.2, it was already mostly in Snowglobe 2.1)

  • Other tree juggling

FUTURE

  • Really do the merge of viewer-public to viewer-development
  • Find things to review (is there a neat process for actually finding

things to review?)

  • Catch-up on opensource-dev

IMPEDIMENTS

  • none (just sickness!)


Oz


PAST

  • essentially no Snowstorm work yesterday

FUTURE

  • update patch from Thickbrick for texture alignment, get it reviewed.
  • get archive of my last Office Hour posted
  • todays Office Hour

IMPEDIMENTS

  • Non-Snowstorm tasks (no help for it)


Merov


PAST

  • LLKDU in viewer-development: Modified llkdu.cmake and install.xml to use the prebuilt binaries for each platform. Suppress the dependency on exisiting llkdu subfolder in the build environment. Modified viewer_manifest.py and newview/CMakeListst.txt to support this idea. Local builds: success. TeamCity builds: success! W00t!!!
  • Add "Sit" to the "pie" menu: Pick up the SG 2.1 patch (VWR-20709) : done
  • Add "Sit" to the "pie" menu: Merge and test patch (VWR-20710): done

FUTURE

  • LLKDU in viewer-development: review, test so it gets pulled to viewer-development
  • Add "Sit" to the "pie" menu: Design review (VWR-20711)
  • Add "Sit" to the "pie" menu: Test the ability to sit "anywhere" (VWR-20712)

IMPEDIMENTS

  • None


Q


OOO


Esbee


PAST

  • Discuss sidebar undocking and more UI ideas with Rhett
  • Set up weekly office hours to discuss product backlog and ideas
  • Continued gathering Resident feedback from blog and email

FUTURE

  • Hold first Product Backlog & Idea OH
  • Finally get Resident ideas and feedback into the backlog
  • Document idea submission process
  • Review texture alignment build for Oz
  • Review Tofu's list of changes from Snowglobe

IMPEDIMENTS

  • None


Paul


PAST

  • BUG EXT-8362 ([TRUNCATION] IT login screen - truncation in location box)
    • Pushed
  • BUG EXT-8672 ([HARD CODED] ALL LANGS The word "Saved" is hard coded, in the long timestamp displayed in IM when user is offline)
    • Pushed
  • BUG EXT-7878 (Corrupted vertical scroll bar appears on 'Edit Outfit' panel if height of 'Add More' panel was changed)
    • Pushed
  • BUG EXT-7951 (Mini-Location panel appearance design issues)
    • Restored in viewer-development repository.
  • BUG EXT-8558 (Add More category picker defaults whenever a clothing item is removed)
    • Fixed and sent for a review

FUTURE

  • EXT-8722 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)

IMPEDIMENTS

  • none


Andrew


PAST

  • Task VWR-20702 (Snowstorm Sprint 2: As a User who's customized the bottom bar of the Viewer UI, I also want to be able to control the order of the buttons as they appear in the UI.)
    • WIP. Estimate ~3 days.

FUTURE

  • Task VWR-20702
    • analyze d&d in favorites, add similar to bottom tray
    • change order of buttons shrinking and disappearing depending on button locations
    • save order in settings and use it when creating bottom tray
    • investigate inconsistency in distance between buttons

IMPEDIMENTS

  • Order of buttons shrinking and disappearing


Vadim


PAST

  • Critical bug EXT-8727 (Crash in LLAppearanceMgr::updateClothingOrderingInfo):
    • Posted a defensive fix for review (could not repro though).
  • Task VWR-20694 (Enable sidebar to track detaching/attaching tabs):
    • Filed, working on it
  • Code review, merge.

FUTURE

  • Commit EXT-8727 if it gets approved.
  • Work on VWR-20694.

IMPEDIMENTS

  • none


Sergey


PAST

  • Task (VWR-20694) As a User, I want to undock tabs from the Viewer sidebar so that I can control what tabs are displayed and organize them on my screen in any way I want like I could do in 1.23.
    • WIP.
    • Fixed some crashes caused by docking/re-docking tabs.
    • Investigating undocked tab visibility changes when switching tabs in Side Tray.

FUTURE

  • Task (VWR-20694) As a User, I want to undock tabs from the Viewer sidebar ...
    • Estimated: 3 days for sub-tasks 4 and 5.

IMPEDIMENTS

  • need design soon


Anya


PAST

  • sidebar docking/undocking design issues (VWR-20694)
  • bottom bar button reordering design issues (VWR-20702)
  • jira VWR workflow wrangling
  • tracking missing fixes
  • progress tracking

FUTURE

  • GH & new jira demo
  • VWR-20702 design - button shrinking/disappearing - follow up with Ben
  • completed/in progress tasks need estimates / burndown data
  • esablish procedure for taking EXTs from old PE backlog to particular sprint
  • follow up future commit process

IMPEDIMENTS

  • out thu-fri next week