Snowstorm Daily Scrum Archive
Tuesday, September 14, 2010
General Notes
- First day of Sprint 4! Sprint Planning Meeting today from 7-9am PT
Team Status
Aimee Linden
PAST
- Clean up voice client shutdown, which turned out less of a problem than I suspected, that's ready for code review, requested on the lists
- Wrapping up some legal paperwork
FUTURE
- Kick off Sprint 4!
IMPEDIMENTS
- None.
Tofu Linden
Not available for Daily Scrum today
Oz Linden
PAST
- Work on getting a codereview system set up
- Office Hour
FUTURE
- Push codereview system more...
- Wiki updates for getting source
IMPEDIMENTS
- none
Merov Linden
PAST
- STORM-106, 115, 116, 117, 118: move those to "Integrated"
- STORM-130 (VWR-22769) : libPNG build: Tried a change that allows for Boroondas change for standalone builders to be taken without breaking TC builds and those of us using prebuilt binaries. Waiting for TC to cycle through it.
- Snowglobe backlog: moved a bunch of JIRAs and created a bunch more that have SG2.x fixes but are still unfixed in viewer 2.1. Emailed to Esbee.
- Emailed opensource-dev on perf tracking (while talking about jpeg2000 properties)
FUTURE
- STORM-104 (VWR-22761) : LLKDU upgrade. More on perf tracking while waiting for license to clear and new version to come.
- Snowstorm backlog: more on this
IMPEDIMENTS
- Kakadu license upgrade
Q Linden
PAST
- Talked to Wolfpup about taking over SNOW-102 and SNOW-103, no progress since yesterday
FUTURE
- Kick off Sprint 4!
IMPEDIMENTS
- None
Esbee Linden
PAST
- Met with Q about Jira triage, and related Snowstorm process
- Touched base with Orange, Gentle, and LordGregGreg about mtg next week after my move
- Clean up Jira proposal
- Lots of email
- Prep for Sprint 4
FUTURE
- Sprint 4 Planning
- Backlog grooming & new feature request review
- Send request to XD for friend permissions icons.
- Write UI customization blog post.
- Write end of Sprint 3 wrap-up blog post
- VWR triage
- Modify process for sending Viewer ideas/feature requests
IMPEDIMENTS
- None
Paul ProductEngine
OOO- vacation
Andrew ProductEngine
PAST
- Bug STORM-99 (Select button inside Resident Chooser is disabled if invoke sharing from undocked My Inventory panel)
- Fixed and sent for integration.
- Bug STORM-114 (IM chat history log in plain text mode looks ugly when displays avatar SLURLs)
- Sent for integration.
- Bug STORM-123 (Resizing ability of nearby chatbar in bottomtray appears only after click)
- Created, fixed and sent for integration.
- Bug STORM-124 (Replace "no matches found" with "loading" in the My Outfits tab)
- Closed as resolved.
- Bug STORM-125 (The change of "My title" is saved without pressing "Save" button in the Group Profile)
- Closed as resolved.
- Bug STORM-126 (Offline participants of Add hoc chat are shown in Recent Tab)
- Closed as resolved.
- Bug STORM-109 (Undocked Block List panel has no horizontal scrollbar + verbs have fixed size)
- Closed as cannot reproduce.
- Bug STORM-111 (Camera view angle resets during outfit editing when docking/undocking Edit Outfit panel)
- Closed as cannot reproduce.
- Bug STORM-112 (EOLs are displayed as "squares" in the pick descriptions after minimize/restore undocked profile panel)
- Started investigating. Estimate 12h.
FUTURE
- STORM-112.
IMPEDIMENTS
- none
Vadim ProductEngine
PAST
- Major bug STORM-101 (Sidebar settings should be account specific):
- Fixed.
- Bug STORM-110 (Add More sub-panel resets its size if minimize/restore undocked Edit Outfit panel):
- Nasty bug. In current implementation of floater minimization (floater contents doesn't hide when minimized, but shriks, which moves panels in layout stack, including Add More) it's difficult to fix. Redoing floater minimization will cause a ton of new bugs. I have a crooked hack/fix. If I can still live with it in the morning, will commit. Otherwise will close bug as Will not fix
FUTURE
- STORM-110.
IMPEDIMENTS
- none
Seth ProductEngine (Sergey)
PAST
- Getting familiar with new JIRA workflow.
- BUG (STORM-108) Undocked Item Profile panel has no scrollbars
- Fixed
FUTURE
- BUG (VWR-22166) 'Item Profile' panel isn't udated if change name of that item from 'Object contents' floater
- Estimated: 4 hours
- BUG (VWR-22157) My Landmarks: 'Cut' item should be greyed out in folder's context menu
- Estimated: 4 hours
IMPEDIMENTS
- These issues should be resolved as Fixed:
- (VWR-21132) [BSI] scroll bar resets to near the top of inventory search
- (VWR-21085) Scroller doesn't follow the cursor if cursor is being moved by keyboard arrow buttons
Andrey ProductEngine
PAST
- smoke test on Win7/OSX against r209332
- tested bottom bar buttons drug&drop
- re-tested fixes related to sidebar panels dock/undock
FUTURE
- regression testing in scope of changes since 209053
IMPEDIMENTS
- VWR-20702 subtasks are Awaiting Review, but QA Status == Ready to QA
- some VWR-20694 linked bugs are Awaiting Review as well, but fixes already included into r209332
Grumpity ProductEngine (Anya)
PAST
- sprint retrospective
- jira wranging with Sue
- created ProducEngine-specifc context to allow all admin tasks to happen in one place
- approved by didn't happen as we wanted it. will keep looking.
- reports, updates
FUTURE
- sprint planning
- try to get "Approved by" on main view in jira & as a dropdown user picker when doing the approving (like assignee field when creating new issue)
- make sure issues with incorrect status are transitioned through jira
- figure out how to indicate code review status in jira (esbee/oz/sue)
IMPEDIMENTS
- none
Past Updates
- Friday, September 17, 2010
- Thursday, September 16, 2010
- Wednesday, September 15, 2010
- [[Snowstorm_Daily_Scrum_Archive/09142010 | Tuesday, September 14, 2010
- Monday, September 13, 2010
- Friday, September 10, 2010 - No Daily Scrum, Sprint 3 Review Meeting took place
- Thursday, September 9, 2010
- Wednesday, September 8, 2010
- Tuesday, September 7, 2010
- Monday, September 6, 2010 - No Daily Scrum, Labor Day Holiday
- Friday, September 3, 2010
- Thursday, September 2, 2010
- Wednesday, September 1, 2010
- Tuesday, August 31, 2010 - No Daily Scrum, Sprint 2 Retrospective & Sprint 3 Planning Meetings took place
- Monday, August 30, 2010
- Friday, August 27, 2010 - No Daily Scrum, Sprint 2 Review took place
- Thursday, August 26, 2010
- Wednesday, August 25, 2010
- Tuesday, August 24, 2010
- Monday, August 23, 2010
- Friday, August 20, 2010
- Thursday, August 19, 2010
- Wednesday, August 18, 2010
- Tuesday, August 17, 2010 - No Daily Scrum, Sprint 2 Planning took place
- Monday, August 16, 2010