Snowstorm Daily Scrum Archive

From Second Life Wiki
Jump to navigation Jump to search


Thursday, August 26, 2010

General Notes


  • No Daily Scrum tomorrow. Sprint Review Meeting Scheduled from 6-9am PT.


Team Status


Aimee


PAST

  • Reviewed and pulled Merov's llkdu fixes.
  • Attended Snowstorm OH.
  • Imported and merged double-click teleport patch from Snowglobe.

FUTURE

  • Finish off double-click teleport and get a build up for design review.
  • Team meeting.
  • Howard's software dev meeting.
  • Get back to importing Snowglobe build fixes
  • Check with CG about renaming TeamCity projects to Viewer-Release-Builds, and Viewer-Project-Builds so that they sort together in the project list. May also need Viewer-Aimee's-Builds as I seem to be accumulating enough for my own project :)

IMPEDIMENTS

  • None


Tofu


OOO


Oz


PAST

  • essentially no Snowstorm work yesterday

FUTURE

  • update patch from Thickbrick for texture alignment, get it reviewed.
  • get archive of my last Office Hour posted
  • todays Office Hour

IMPEDIMENTS

  • Non-Snowstorm tasks (no help for it)


Merov


PAST

  • LLKDU in viewer-development: review. Logged VWR-20946 to track this. Got -1 review by Mani: Linux doesn't load llkdu. Aimee to pull the change though so we get Windows at least to build correctly.
  • Add "Sit" to the "pie" menu: Got everything ready for review and pull. Created a merov-viewer-development-features repo and TeamCity tasks to share, review and test. Q is: how do we move swiftly with the rest of the process?
  • Unplanned: lots of discussions on llkdu with lab folks...

FUTURE

  • LLKDU in viewer-development: fix the Linux issue.
  • Add "Sit" to the "pie" menu: Design review (VWR-20711)
  • Add "Sit" to the "pie" menu: Test the ability to sit "anywhere" (VWR-20712)

IMPEDIMENTS


Q


OOO


Esbee


PAST

  • Hold first Product Backlog & Idea OH
  • Review texture alignment build for Oz
  • Discussion about UI Toolkit
  • Discussion about UI customization

FUTURE

  • Get Resident ideas and feedback into the idea tab of backlog
  • Document idea submission process
  • Review Tofu's list of changes from viewer-public
  • Team Meeting
  • Howard's 'Quick or Dead' Meeting

IMPEDIMENTS

  • None


Paul


PAST

  • BUG EXT- 8722 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
    • In progress 60%.

FUTURE

  • BUG EXT- 8722 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)

IMPEDIMENTS

  • none


Andrew


PAST

  • Task VWR-20702 (Snowstorm Sprint 2: As a User who's customized the bottom bar of the Viewer UI, I also want to be able to control the order of the buttons as they appear in the UI.)
    • WIP. Working on D&D similar to favorites, will finish tomorrow.

FUTURE

  • Task VWR-20702
    • analyze d&d in favorites, add similar to bottom tray
    • change order of buttons shrinking and disappearing depending on button locations
    • save order in settings and use it when creating bottom tray
    • investigate inconsistency in distance between buttons

IMPEDIMENTS

  • Order of buttons shrinking and disappearing


Vadim


PAST

  • Task VWR-20964 (Enable sidebar to track detaching/attaching tabs):
    • 70% complete.

FUTURE

  • create repo to work on detachable tabs, add my code for VWR-20964, integarte with Sergey's code.
  • figure out how else to help Sergey

IMPEDIMENTS

  • none


Sergey


PAST

  • Task (VWR-20696) Write code to allow for undocking of a sidebar tab
  • Task (VWR-20697) Write code to allow for redocking of a sidebar tab
    • Fixed undocked tab visibility changes when switching tabs in Side Tray.
    • Added undocking multiple tabs from Side Tray.
    • Fixed Side Tray expanding/collapsing on undocking/undocking tabs.

FUTURE

  • Task (VWR-20696) Write code to allow for undocking of a sidebar tab
  • Task (VWR-20697) Write code to allow for redocking of a sidebar tab
  • Integrate with Vadim's code to complete both tasks tomorrow no significant bugs are found

IMPEDIMENTS

  • need design soon


Anya


PAST

  • GH & new jira demo
  • Followup on future workflow and PE process
  • Played with new jira
  • Investigated platform testing status
  • maintenance/org

FUTURE

  • VWR-20702 design - button shrinking/disappearing - follow up with Ben
  • esablish procedure for taking EXTs from old PE backlog to particular sprint

IMPEDIMENTS

  • out thu-fri next week


Past Updates