Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Friday, September 17, 2010 ==
== Monday, September 27, 2010 ==


=== General Notes ===
=== General Notes ===
----
----
* Merge Monkey of the Day:Oz
* Merge Monkey of the Day: Merov




Line 16: Line 16:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-122 (Clean-up dead code from obsolete floaters)
* STORM-253 FrontWindow() deprecated
** Killed around 20 obsolete XUI files, buried about 175 dead files including all the translations.
* Took a quick peak at STORM-95
* STORM-134 (crash in LLViewerObjectList::removeFromLocalIDTable)


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* STORM-134 (crash in LLViewerObjectList::removeFromLocalIDTable)
* STORM-253 FrontWindow() deprecated
* STORM-95 Audio file upload  hangs the viewer


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None.
* None
 


====Tofu Linden====
====Tofu Linden====
----
----
<i>Not available for Daily Scrum today</i>
<b>PAST</b><br />
* lots of reviews and stealth merges. :)
* llTextbox()
 
<b>FUTURE</b><br />
* llTextbox()
 
<b>IMPEDIMENTS</b><br />
* o m g fatal deadline!




====Oz Linden====
====Oz Linden====
----
----
<b>PAST</b><br />
<i>OOO - Vacation</i>
* Merged and built STORM-175 (I think I'll need help testing this, as I have no projectile weapons)
* Assorted Jira and process issues


<b>FUTURE</b><br />
* Third party viewer developer meeting
* Find or create an issue for new water display problem on Mac
<b>IMPEDIMENTS</b><br />
* none


====Merov Linden====
====Merov Linden====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Merge Monkey duties
* STORM-161: integrated to viewer-development
* STORM-168 : Python cleanup : in merov_linden/viewer-development-importer
* STORM-173: created changeset for review
* STORM-161 : Hide highlight when editing : in merov_linden/viewer-development-features
* STORM-231: Map: took that from Eric, created a changeset and build. Assigned to Q as testing will involve server side monitoring hence sync up with whichever team outside Snowstorm.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* STORM-104 (VWR-22761) : LLKDU upgrade. More on perf tracking while waiting for license to clear and new version to come.
* STORM-137 : FMOD issue: finish
* STORM-162


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 63: Line 61:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-143 functionality finished but blocked by "broken glass"
* getting 2.2.1 beta out and doing my part of the work on that
* Some meetings on release process and other topics
* meeting with my management re planning futures
* Medical
* health issues


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Write new STORM issue to fix broken file glob function in LLDIR and write tests for it
* understanding test framework for STORM-143 and writing it up
* Work on getting a build into beta
* iterating on 2.2.x betas
* hr stuff
* planning


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Ugly source code for LLDIR
* health continues to limit my bandwith
* Oz out




Line 78: Line 79:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* OOO
* VWR triage
* Backlog grooming
* Sprint Prep


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* OOO Today (Maybe)
* Modify process for sending Viewer ideas/feature requests
* VWR triage
* VWR triage
* Backlog grooming & new feature request review
* Backlog grooming & new feature request review
* Write UI customization blog post.
* Prep for Sprint 5
* Write end of Sprint 3 wrap-up blog post
* Sprint Retrospective
 
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Shipping companies
* None




Line 100: Line 101:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Revived debugger
* Major bug STORM-160 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
* Major bug STORM-177 ([I18N] [DATETIME] Garbled letters for Date that used to be hard-coded (Japanese)).
** Closed as cannot reproduce.
* Showstopper bug STORM-180 (Viewer crashes on login in Japanese locale).
* Bug STORM-210 (People you called via Adhoc are not shown in Recent tab).
** Fixed both with one changeset and sent for integration.
** WIP. Estimate- 5 hours.
*Removed unused code and xml data from statusbar.
* Bug STORM-107 ([I18N] [CORRUPTED CHAR IN DATE] Polish character corruption in date)
** Fixed and sent for integration.
* Major bug STORM-153 ([HARDCODE] Conference and non-existent IM session name strings are hardcoded)
** Started changing according to yesterday's discussion with Vadim. Estimate- 2 hours.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Finish STORM-153 ([HARDCODE] Conference and non-existent IM session name strings are hardcoded).
* STORM-210 (People you called via Adhoc are not shown in Recent tab).
* Bug STORM-188 (Viewer crashes while intensive flying forward/backward).
* Bug STORM-187 (Opening the sidebar shrinks a wide chat text window, but closing doesn't restore it).


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 122: Line 116:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Bug STORM-183 (Wear button is disabled when outfit1 is subset of outfit2):

* Struggled with bug STORM-135 (Hi-Rez snapshot broken in Viewer 2.1.1).
** Fixed.
** Failed to fix, handed over
* Bug STORM-186 ("Take Off - Remove from current outfit" menu items from gear/context menu should behave in the same way):

 
** Fixed.
* Bug STORM-185 (Edit Outfit panel: do not scroll worn items' list to the bottom after add/replace):

** Fixed.
* Bug STORM-184 (Save is enabled for outfits consisting of original items):
** 
Could not reproduce.
* Grabbed a few bugs for PE to work on during sprint 4.
   
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Bug STORM-191 ('(???)(???)' instead object's name is shown  in Block list if block just created object from Nearby chat).
* Will pick some quick-to-fix bugs.
** ETA: 3h.
* Bug STORM-192 (Ctrl-Shift-W hides all chat until a viewer restart).
** ETA: 1d.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
*none




Line 145: Line 129:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* BUG (STORM-154) Group Call button label is cut after resizing undocked Group Profile panel
* BUG (STORM-199) Dragging an object from Library into COF adds copy of item, does not wear
** Fixed.
** Fix updated according to code review feedback.
* BUG (STORM-156) "Add friend" button is cut in People Profile
* BUG (STORM-189) [TRUNCATION] many langs - select build tools dialog (Reopened)
** Fixed.
** Fixed.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* BUG (STORM-159) UI: Allow item drop onto profiles
* Pick some more issues from sprint 4 or from assigned to Snowstorm team.
Estimated: 8 hours


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*none
* need Eli Linden to look at https://jira.secondlife.com/browse/STORM-190.




Line 161: Line 144:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* smoke and integrity tests against r209678, see already shared spreadsheet
* completed regression testing of 210127, see http://spreadsheets.google.com/ccc?key=0AsjYANl9JgoKdFM3dEt4aGZDUTJycmJBdTl0cUM4UWc&hl=en&authkey=CLjUg88F.
* resolved tickets verification
** All is done except avaline p2p call test.
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* regression & functional testing of r209678 in scope changes since r209322
* grab latest viewer-development build and verify bunch of tickets integrated after Sept 21st
* complete verification of tickets integrated into r209678


<b>IMPEDIMENTS</b>
<b>IMPEDIMENTS</b><br />
* none
* none


Line 175: Line 157:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*jira wrangling some more
* some more jira wrangling.  added option to close from open state without transition thru workflow. other states that need fixes are still in progress.
** no way to win with "Approved by"
* QA synch-up and process
** issues with incorrect status - fixed
* tried to find a home for STORM-135 but both candidates for it are currently without cycles.  b
* request additional feature work for PE
* meetings
* reports


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* talk to Eli about STORM-190
* more jira wrangling
* crashhunters
* crashhunters
* More jira:
* talk to Richard about STORM-135 and hopefully hand off to him
** figure out how to indicate code review status in jira (esbee/oz/sue)
** Streamline Reject workflow: when you Reject a fix, the ticket doesn't get assigned back to the  fixer, nor are you allowed to select assignee. You have to reassign the  ticket manually afterwards.
** get permissions for changing incorrect status/resolution


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
*none
 





Revision as of 07:24, 27 September 2010


Monday, September 27, 2010

General Notes


  • Merge Monkey of the Day: Merov


Team Status


Aimee Linden


PAST

  • STORM-253 FrontWindow() deprecated

FUTURE

  • STORM-253 FrontWindow() deprecated
  • STORM-95 Audio file upload hangs the viewer

IMPEDIMENTS

  • None


Tofu Linden


PAST

  • lots of reviews and stealth merges. :)
  • llTextbox()

FUTURE

  • llTextbox()

IMPEDIMENTS

  • o m g fatal deadline!


Oz Linden


OOO - Vacation


Merov Linden


PAST

  • STORM-161: integrated to viewer-development
  • STORM-173: created changeset for review
  • STORM-231: Map: took that from Eric, created a changeset and build. Assigned to Q as testing will involve server side monitoring hence sync up with whichever team outside Snowstorm.

FUTURE

  • STORM-137 : FMOD issue: finish

IMPEDIMENTS

  • Kakadu license upgrade


Q Linden


PAST

  • getting 2.2.1 beta out and doing my part of the work on that
  • meeting with my management re planning futures
  • health issues

FUTURE

  • understanding test framework for STORM-143 and writing it up
  • iterating on 2.2.x betas
  • hr stuff
  • planning

IMPEDIMENTS

  • health continues to limit my bandwith
  • Oz out


Esbee Linden


PAST

  • VWR triage
  • Backlog grooming
  • Sprint Prep

FUTURE

  • VWR triage
  • Backlog grooming & new feature request review
  • Prep for Sprint 5
  • Sprint Retrospective

IMPEDIMENTS

  • None


Paul ProductEngine


OOO- vacation


Andrew ProductEngine


PAST

  • Major bug STORM-160 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
    • Closed as cannot reproduce.
  • Bug STORM-210 (People you called via Adhoc are not shown in Recent tab).
    • WIP. Estimate- 5 hours.

FUTURE

  • STORM-210 (People you called via Adhoc are not shown in Recent tab).

IMPEDIMENTS

  • none


Vadim ProductEngine


PAST

  • Struggled with bug STORM-135 (Hi-Rez snapshot broken in Viewer 2.1.1).
    • Failed to fix, handed over

FUTURE

  • Will pick some quick-to-fix bugs.

IMPEDIMENTS

  • none


Seth ProductEngine (Sergey)


PAST

  • BUG (STORM-199) Dragging an object from Library into COF adds copy of item, does not wear
    • Fix updated according to code review feedback.
  • BUG (STORM-189) [TRUNCATION] many langs - select build tools dialog (Reopened)
    • Fixed.

FUTURE

  • Pick some more issues from sprint 4 or from assigned to Snowstorm team.

IMPEDIMENTS


Andrey ProductEngine


PAST

FUTURE

  • grab latest viewer-development build and verify bunch of tickets integrated after Sept 21st

IMPEDIMENTS

  • none


Grumpity ProductEngine (Anya)


PAST

  • some more jira wrangling. added option to close from open state without transition thru workflow. other states that need fixes are still in progress.
  • QA synch-up and process
  • tried to find a home for STORM-135 but both candidates for it are currently without cycles. b

FUTURE

  • talk to Eli about STORM-190
  • more jira wrangling
  • crashhunters
  • talk to Richard about STORM-135 and hopefully hand off to him

IMPEDIMENTS

  • none


Past Updates

September
27 | 24 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 9 | 8 | 7 | 3 | 2 | 1

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16