Snowstorm Daily Scrum Archive/02012011

From Second Life Wiki
Jump to navigation Jump to search


Tuesday, February 1

General Notes


  • Sprint planning today - no standup
  • MMOTD: Oz

Team Status


Merov Linden


PAST

  • Triage JIRA for sprint planning meeting
  • Code reviews

FUTURE

  • Sprint planning
  • STORM-746 : KDU Improvements: Compress j2c with precincts

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • Sprint 11 Theme - Customization
  • Sprint review
  • jira wrangling to prep for sprint planning
  • find victim for inventory issues (STORM-526)
  • Maestro commented on STORM-379 (Buy copy of floater)

FUTURE

  • Sprint planning
  • continue to prod others to resolve impediments
  • Product triage

IMPEDIMENTS

  • moving

Paul ProductEngine


PAST

  • BUG STORM-655 (mismatched filter extension in snapshot floater (jpeg vs jpg).)
    • Fixed and sent for review.
  • BUG STORM-680 (Avaline callers are added to the Recent list)
    • WIP. Estimate ~ 6-8 hours.

FUTURE

  • BUG STORM-680 (Avaline callers are added to the Recent list)

IMPEDIMENTS

  • none

Seth Productengine


PAST

  • BUG (STORM-219) "Folders Always By Name" and "System Folders To Top" options are missing from the Inventory menu. Can't sort folders!
    • Fixed with patch for STORM-316.
  • BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text
    • Investigating how friendship offers notifications are placed inside IM chat history.

FUTURE

  • BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text

IMPEDIMENTS

  • STORM-316

Vadim Productengine


PAST

  • STORM-2 (Customizable viewer layouts):
    • Implementing saving sidetray state. ETA: 2d.

FUTURE

  • Continue with STORM-2.

IMPEDIMENTS

  • Bug STORM-465 (Missing Strings from strings.xml):
    • 
Waiting for Q to provide code-related feedback.

Andrey ProductEngine


PAST

  • picked up 2.5.0 Beta3 r220094 build
  • smoke tests have been passed on Linux, OSX, and Windows, refer to the spreadsheet
  • integrity test has been failed by VWR-24681, but I think this is some kind of a server-side issue
  • 2.5.0 bug-fixes verification almost has been completed, refer to spreadsheet
    • 87 tickets marked as "Deferred" because TPE has no clue how to verify those
  • reported 4 tickets
  • picked up v-d 220024 build
    • verified 3 issues
    • proceeded with regression testing of v-d branch

FUTURE

  • proceed with regression testing of v-d build

IMPEDIMENTS

  • none


Wolfpup Lowenhar


PAST

  • Worked @ RL .
  • STORM-236 : waiting for Oz's suggestions.
  • Attended Sprint Planning Metting.
  • Attended Merov’s OH.

FUTURE

  • Work @ RL
  • STORM-941 : Dig into code and then email Oz and Leyla concerning possible fix as this is related to the DN code and there is some place that was missed in llimview that the logs still gets generated using legacy as a fallback instead of converting legacy to user name.

IMPEDIMENTS

  • STORM-236 : waiting for Oz's suggestions.
  • Not enough time to actually work on code.

Cummere Mayo


PAST

  • jira work
  • another blog post

FUTURE

  • more jira work
  • more blogs

IMPEDIMENTS

  • many