Snowstorm Daily Scrum Archive/05162011

From Second Life Wiki
Jump to navigation Jump to search


Sprint 15, ends 05.16.11

Monday, May 16

Team Status


Oz Linden


PAST

  • Merge Monkeying - assorted late arrivals
  • Open Dev User Group
  • GPU table testing (built test viewer)

FUTURE

  • Integrate mesh?
  • Integrate GPU table updates
  • Sprint Planning

IMPEDIMENTS

  • none

Wolf Linden


PAST

  • Organizational meetings: Rhett, Oz

FUTURE

  • Check in with Grumpity
  • WLRS status review

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • VWR triage
  • Sprint retrospective
  • jira workflow changes for VWR triage
  • sprint 15 cleanup

FUTURE

  • sprint planning
  • meet with wolf

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • TASK STORM-1202 (Time spin control)
    • Made some changes according to Vadim's comments in review
  • BUG STORM-951 (Accidental Self-Muting/Self-Blocking)
    • WIP. Investigating possibilities to refactor fix for ticket according to Vadim's comments in review

FUTURE

  • STORM-1205 (Add "Environment" tab to the "Region/Estate" floater)

IMPEDIMENTS

  • none

Seth ProductEngine


PAST

  • TASK (STORM-1244) Implement Environment Settings floater
    • WIP. Integrating with Vadim's new way of storing/applying environment settings. 90% complete.

FUTURE

  • TASK (STORM-1244) Implement Environment Settings floater
  • TASK (STORM-1256) Region environment settings editor

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Task STORM-1245 (Implement new way of storing/applying environment settings):
    • Completed by adding region settings support (read-only).
    • After Seth finishes with the new Environment Settings Floater (hopefully today) we'll be ready to demonstrate the new basic WLRS UI.
  • Created JIRA tasks for the remaining WLRS work.

FUTURE

  • Help Seth with an assertion problem he's experiencing.
  • Proceed with WLRS tasks (probably skies management).

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up the latest v-d build r229908
  • verified 8 integrated tickets
  • started regression pass:
    • Notifications & Alerts
    • Busy Mode
    • MiniMap
    • World Map
    • About Land
    • ToS

FUTURE

  • pick up next beta build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • STORM-859 : created local and online repositories and also created issue on RB.
  • STORM-1100 : DLed test viewer which crashes on start on linux laptop so posted crash report log to issue.
  • Attended Open Development User Group meeting.
  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
    • Desiding on what type of build to work on next.

FUTURE

  • Working inworld(this is part of testing localy built viewers).

IMPEDIMENTS

  • Getting Autobuild system and seceurity software to play nicely on my system.