General Notes


  • Merge Monkey of the Day: Merov ... again
  • Beta fixes should be done on a beta branch
  • With rare exceptions when we need to stabilize and release a beta, beta fixes should merged into Beta asap.

Team Status


Merov Linden


PAST

  • STORM-137: Fixed a last Windows viewer packaging issue. Emailed chopper on what I did. Asked community members to help me test the standalone build case. Ready for review.
  • SH-277 (Attachments are visible in mouselook mode): Found a 1 liner fix in the nick on time on Friday evening! Emailed opensource-dev to get folks to test if that really fixed the issue but didn't get anything useful. How to
  • Finished HR paperwork


FUTURE

  • Beta monitoring and merge monkey-ing (merges, try to identify bugs I can contribute to)
  • SH-277 : Finish so we can push a fix on beta.
  • STORM-105 : Perf decompression: put new data out, check the work done by opensource-dev community on similar tests.

IMPEDIMENTS

  • none

Oz Linden


PAST

  • Pester Team Chopper about opening up autobuild
    • Plan is to publish at the end of their current sprint (1.5 weeks)
  • Pulled build changes to a viewer-development tree and built
    • Testing - looks ready to integrate
  • Got access and development briefing for web site changes
    • (develop.secondlife.com, viewerdirectory.secondlife.com)

FUTURE

  • Prep a budget proposal for open build service & code review system
  • Start updating develop.secondlife.com

IMPEDIMENTS

  • none

Q Linden


PAST

  • HR (annual reviews) - mostly done (one left)
  • Q4 / 2011 planning - not quite done (sigh)
  • Process work (finishing today, I hope)

FUTURE

  • Process work
  • Unit test workingIMPEDIMENTS

IMPEDIMENTS

  • none

Esbee Linden


PAST

  • VWR triage
  • Q4+ planning
  • Systems requirements research
  • Reviewed versions, "viewer-development bug queue and viewer 2.2.0 Beta" and prioritized all bugs
  • Finished end of year review paperwork

FUTURE

  • VWR triage
  • Viewer release process review
  • Review Snowstorm Jira tickets
  • Viewer roadmap/Q4 planning planning
  • Systems requirements analysis

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • STORM-211 Fade timer is reset for all toasts displayed in the notifications channel
    • Fixed

FUTURE

  • STORM-211 Fade timer is reset for all toasts displayed in the notifications channel
    • Carefully test fix

IMPEDIMENTS

  • none

Seth Productengine


PAST

  • BUG (STORM-289) Internal browser navigation bar disappears after minimize/restore
    • Fixed.

FUTURE

  • BUG (STORM-294) Selection goes out of Favorites overflow list if scroll it by keyboard
    • Estimated: 4-6 hours.

IMPEDIMENTS

  • STORM-316

Andrew Productengine


PAST

  • Major bug STORM-313 (Build parcel property is displayed incorrectly)
    • Came across comment in code which led me to EXT-4610 ([BSI] parcel settings icons do not match parcel settings) where decision to make the icon the way it is now was made. So this bug seems to be expected behaviour, but because it wasn't closed as such by Esbee and was reported by Oz, asked Esbee a question in ticket and will either make changes or close floater depending on answer.
  • Bug STORM-301 (Camera view remains on Edit Appearance mode after undocked 'My Appearance' tab was minimized while being in 'Edit Outfit' mode)
    • WIP, will finish on Monday. Estimate- 3 hours.
  • The 2h+ downtime of grid made the work a bit slower.

FUTURE

  • STORM-313 (Build parcel property is displayed incorrectly).

IMPEDIMENTS

  • Looked through STORM-182 (Uninstalling a beta client can result in all chatlogs being deleted as well if logging is left to default location)- it doesn't seem to be viewer issue- perhaps it should be on some team that is working on installer, or if just behaviour (not code) should be investigated and discussed, perhaps this issue is not for devs.
  • STORM-313

Vadim Productengine


  • OOO - Vacation. Will be back to office on Oct, 11th.

Andrey Productengine


Grumpity ProductEngine


PAST

  • crashhunters, another monday
  • getting access for QA

FUTURE

  • QA synch notes & followup
  • take STORM-315 from Esbee and split it.
  • crashhunters
  • STORM - 313
  • STORM- 182
  • etherpad for updates?

IMPEDIMENTS

  • none