Snowstorm Daily Scrum Archive/10132010

From Second Life Wiki
Jump to navigation Jump to search


Wednesday, October 13, 2010

General Notes


  • Merge Monkey of the Day: Oz

Team Status


Merov Linden


PAST

  • STORM-137: Ready for review.
  • STORM-104: kdu upgrade: Started to move things around quite a bit in preparation of that change...
  • External build: worked with team chopper to understand what was going wrong there. Got some insight in this.
  • OH

FUTURE

  • Beta monitoring and merge monkey-ing (merges, try to identify bugs I can contribute to)
  • STORM-104: kdu upgrade
  • STORM-105 : Perf decompression: put new data out, check the work done by opensource-dev community on similar tests.

IMPEDIMENTS

  • none

Oz Linden


PAST

  • Updating develop.secondlife.com (changes not yet published)
  • Build fixes checked in to viewer-development
    • STORM-222
    • STORM-275
    • STORM-368
    • STORM-374
  • Helped with merge problem in mesh development
  • Reviewed and checked in fixes for STORM-137 and STORM-367

FUTURE

  • Figure out how to test updated libcurl VWR-22780
    • So that we can unblock VWR-20801 (socks 5 proxy)
  • Merge Monkey
    • Pull outstanding beta fixes
    • Drain Snowstorm integration queue
  • More changes to develop site
  • Office Hour

IMPEDIMENTS

  • none

Q Linden


PAST

  • Release
  • Office hours

FUTURE

  • Release
  • Now worried about STORM-381
  • Testing
  • OOO tomorrow fri

IMPEDIMENTS

  • Release
  • Gotta slow down personally

Esbee Linden


PAST

  • Viewer release process review
  • Viewer 2.2 Beta & Release prep
  • VWR triage
  • Systems requirements research

FUTURE

  • Write Viewer 2.2 Release blog post
  • VWR triage
  • Systems requirements analysis
  • Viewer 2.2 Release
  • Office Hours
  • Playing with the Mesh Project Viewer!

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • STORM-211 Fade timer is reset for all toasts displayed in the notifications channel
    • Today while testing found one case in which behavior is wrong. Will give VS this bug.

FUTURE

  • Other tickets by priority

IMPEDIMENTS

  • none

Seth Productengine


PAST

  • BUG (STORM-294)
  • Selection goes out of Favorites overflow list if scroll it by keyboard
    • Fixed. Reassigned for reviewing.

FUTURE

  • BUG (STORM-303) Favorites folder content isn't refreshed while re-ordering landmaks
    • Estimated: 6-8 hours.

IMPEDIMENTS

  • none

Andrew Productengine


PAST

  • STORM-362 ([HARD CODED] ALL LANGS: Unlocalized keyboard keys under Advanced menu > Shortcuts (French viewer))
    • Found Eli's recent changeset with fix and closed as cannot reproduce.
  • Bug STORM-279 (Inability to uncheck avatar cloth in Ultra graphics settings, despite debug setting working)
    • Fixed and sent for review.
  • Bug STORM-322 (Group Member Search: gives more entries then the search string suggests)
    • Investigated. Estimate- 8 hours.

FUTURE

  • Bug STORM-322 (Group Member Search: gives more entries then the search string suggests).

IMPEDIMENTS

  • none

Vadim Productengine


PAST

  • Bug STORM-358 (URL-name of object is shown as a hyperlink in the nearby chat toasts)
:
    • Fixed.
  • Bug STORM-359 (URL-name of object is shown as a hyperlink in the llGiveInventory dlg):
    • Fixed.
  • Bug STORM-360 (URL-name of object is shown as a hyperlink in Message Well window):
    • Fixed.
  • Bug STORM-290 (Home SP is white and does not contain any information after clearing Viewer settings on PC):
    • Investigated, resolved as not reproducible (intermittent server problem).
  • Filed bug STORM-376 (Toast close button sometimes doesn't disappear), investigated, found its reason.

FUTURE

  • If no higher priority tasks arise, will
    • fix bug STORM-376
    • take something from the viewer-development backlog.

IMPEDIMENTS

  • none

Andrey Productengine


PAST

  • smoke tests almost done (couple of tests left for OSX build)
  • planned regression subset completed on 43%

FUTURE

  • complete regression 211863@v-d regression testing

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

FUTURE

IMPEDIMENTS