Wensday, November 3, 2010
General Notes
- Merge Monkey of the Day: Oz
- IMPORTANT: Please remember - when merging your fixes into Beta, you must also pull them into viewer-development immediately after.
- If you take a bug off any of the bug queues, please move it to the current sprint.
- When you pick up an issue in current sprint, please set a time estimate before you start working on it.
Team Status
Merov Linden
PAST
- Merge Monkeying and code reviews: cleared Sprint 6 "Approved" swim lane
- Sprint 7 meeting (long) then review tasks assigned to me (or likely to be)
- libcurl issue: logged an autobuild bug and proposed plausible solution
- Office Hour
- STORM-422: review Vadim's proposal
- STORM-150: received kdu bits, started to read Kakadu docs and potentially interesting improvements
FUTURE
- STORM-105 : Perf gathering: get and post data comparing llkdu (base), kdu statically linked and openjpeg
- STORM-104: kdu upgrade: commit the static linking changes to dev repo
- Merge Monkeying and code reviews
IMPEDIMENTS
- None!!
Oz Linden
PAST
- More testing of getNextFileInDir
- Documented bugs in VWR-23697
FUTURE
- Working on TPV Directory
IMPEDIMENTS
- none
Q Linden
PAST
- Crash rate
- Personnel work
- Beta 2
- Voice bug analysis work
- Sprint planning
- review several JIRAs with Grumpity
FUTURE
- Antialiasing
- Crash rate
- Beta 3 planning
- Meetings
IMPEDIMENTS
- none
Esbee Linden
PAST
- Triage
- Lots of meetings
- "Some" prefs work
- Sprint Planning
- OOO half day today - missed my OH :(
FUTURE
- Preferences design work
- Reviewing my assigned tickets
- VWR Triage
- Putting together a list of scrummaster responsibilities for grumpity
IMPEDIMENTS
- none
Paul ProductEngine
PAST
- BUG STORM-450 (Incorrect help contexts for Sidebar People tab)
- WIP. Still not sure about cause of the problem. Estimate ~5-6 hours.
FUTURE
- BUG STORM-450 (Incorrect help contexts for Sidebar People tab)
- BUG STORM-461 (SP icons are shown in the Mouselook mode)
IMPEDIMENTS
- none
Seth Productengine
PAST
- BUG (STORM-133) Scroller doesn't follow the cursor if cursor is being moved by keyboard arrow buttons
- Could not reproduce, instead found another issue:
- BUG (STORM-536) Unable to scroll to collapsed accordion tab with keyboard arrows in Places SP->My Landmarks.
- WIP. Fixed navigation with up arrow. Working on the issue with down arrow navigation to closed accordion tab.
FUTURE
- BUG (STORM-536) Unable to scroll to collapsed accordion tab with keyboard arrows in Places SP->My Landmarks.
- Estimated: 4-6 hours
- Pick some issues from sprint 7.
IMPEDIMENTS
- none
Andrew Productengine
PAST
- Critical bug STORM-472 (Crash decoding jpg image)
- Fixed the issue, but will test, write comments etc. so estimate is about 3-4 hours more.
FUTURE
- STORM-404.
- Other tickets by priority.
IMPEDIMENTS
- none
Vadim Productengine
PAST
- Major bug STORM-422 (disable crashlogger via client parameters):
- Fixed.
- Severe bug STORM-520 (crash at LLViewerObjectList::removeFromLocalIDTable):
- Investigating. Cannot reproduce so far.
- Sprint planning meeting.
FUTURE
- Continue with STORM-520.
IMPEDIMENTS
- no stories to take from Sprint 7
Andrey Productengine
PAST
- picked up Beta2 213435 build
- smoke and integrity tests have been done
- regression testing started
FUTURE
- complete regression testing of 213435 build
IMPEDIMENTS
- none