Monday, November 22, 2010
General Notes
- Merge Monkey of the Day: Oz -> Merov
- IMPORTANT: When reopening issues from prior sprints, please move into unscheduled (remove Sprint X) and comment that it was reopnened. Reopnened current sprint issues should stay in current sprint.
- if it’s intended for Beta, please make sure it’s in a beta branch and builds in TC _before_ you ask for a merge.
Team Status
Merov Linden
PAST
- STORM-146: kdu-autobuild: Fixed the Mac static lib build to support i386, fixed Linux packaging, fixed Windows packaging too. Pfeww...
- STORM-151: kdu static link: Fixed the make on all platforms to indeed link statically with the lib, passed build everywhere after a couple of iterations. Yeah!
FUTURE
- STORM-146: kdu-autobuild: Test on all platforms and final clean-up.
- STORM-151: kdu static link: Get perf data on all platforms and work on compression.
IMPEDIMENTS
- None
Oz Linden
PAST
- Merge Monkeying (STORM-627)
- Consulted with Wolfpup on problem with Ad-hoc conference log names (STORM-102)
- Pester people about autobuild reviews
- Working on some metrics for open contributions
FUTURE
- Continue with setting up Code Review system
IMPEDIMENTS
- Would like to hand off Merge Monkey job for a few days
Q Linden
PAST
- 2.4 beta mark
- 2.4 email to engineering
- Administrative stuff
- OOO for my lecture
FUTURE
- Beta 2.4
- OOO
IMPEDIMENTS
- none
Esbee Linden
PAST
- Worked on internal reporting docs
- Tested project viewers and provided product/design input
- Provided feedback on STORM-40
- Meetings
- VWR Triage
- Ticket prioritization
- Injured my hand/wrist over the weekend
FUTURE
- Work on internal reporting documents
- [STORM-537] Update and publish (publicly) the keyboard shortcut doc
- [STORM-539] Finish draft of prim alignment tool design
- [STORM-34] Create quick design doc for favs on login screen
- VWR Triage
- Ticket prioritization
- Backlog cleanup
IMPEDIMENTS
- Working with one hand is slowing me down tremendously
Paul ProductEngine
PAST
- TASK STORM-593 (Make transparent texteditor and lineeditor)
- WIP. Today implemented beta version of fix and tested it. All seems work fine. On Monday will start implementing final version. Estimate ~ 10 - 12 hours.
FUTURE
- TASK STORM-593 (Make transparent texteditor and lineeditor)
IMPEDIMENTS
- none
Seth Productengine
PAST
- TASK (STORM-584) Fix color and opacity setting for Bubble Chat
- Patch sent for integration.
- BUG (STORM-550) LLDir::getNextFileInDir fails for some complex wildcard combinations
- WIP. Looked through test cases, found one that fails on Linux, some other need testing on other platforms. Investigating boost::filesystem library for portable implementation of
LLDir::getNextFileInDir.
FUTURE
- BUG (STORM-550) LLDir::getNextFileInDir fails for some complex wildcard combinations
- Estimated: 8-10 hours.
IMPEDIMENTS
- none
Andrew Productengine
PAST
- Reopened major task STORM-572 (Layout cleanup in the Sound & Media tab of Preferences)
- Fixed and put on review.
- Critical bug STORM-594 ([crashhunters] crash in LLView::handleVisibilityChange(int) [second life unknown])
- Couldn't reproduce. Investigated. Discussed with Vadim. Assigned back to unassigned.
- Critical bug STORM-521 ([crashhunters] crash at [0] LLAudioSource::hasPendingPreloads() [secondlife-bin llaudioengine.cpp])
- Investigating. Trying to figure out steps to reproduce. Can't give even nearly correct estimate yet- code is completely unfamiliar, but rough one is 8 hours.
FUTURE
- Critical bug STORM-521 ([crashhunters] crash at [0] LLAudioSource::hasPendingPreloads() [secondlife-bin llaudioengine.cpp]).
IMPEDIMENTS
- none
Vadim Productengine
PAST
- Bug STORM-622 (Texture picker screws up when multiple textures are opened):
- Gave up, handed over to Paul, who is more experienced with this kind of stuff.
- Bug STORM-334 (-set CacheLocation command does not work?):
- Investigated, resolved as expected behavior.
- Bug STORM-432 (Trash button in People > My Friends tab can be moved):
- Fixed.
- Bug STORM-456 (Two space chars in 'conference-title-incoming' text for Polish language):
- Fixed.
FUTURE
- Will pick something from the v-d bug queue.
IMPEDIMENTS
- Need an answer in STORM-40.
- Unclear what new stories we can take from sprint 8 (that don't require design work first).
Andrey Productengine
PAST
- regression testing of v-d build r215105
- reported STORM-658, 659
- designed Viewer Chat Logging test plan (STORM-102)
FUTURE
- verify STORM-102 with descendants
- 2.4.0 Beta1 (?)
IMPEDIMENTS
- none
Jonathan Yap
PAST
- STORM-596 (Move Help/Enable Hints) - finished, needs to be taken into viewer-development
FUTURE
- STORM-615 (Move Delete to bottom of object menu) or maybe something more comprehensive (in-work, TBD).
- Consult with Esbee/Oz/Andrew/Nyx on other jiras that are not in Storm yet.
- [long range] Add seperate jira issues for each issue in Storm-138 per Oz's request.
Update lsl wiki - remove Unsupported icon next to llTextBox. Timing of when to make this edit?
IMPEDIMENTS
- none