Snowstorm Daily Scrum Archive/12012010
Jump to navigation
Jump to search
Wednesday, December 1, 2010
General Notes
- Merge Monkey of the Day: Oz
- IMPORTANT: When reopening issues from prior sprints, please move into unscheduled (remove Sprint X) and comment that it was reopnened. Reopnened current sprint issues should stay in current sprint.
- if it’s intended for Beta, please make sure it’s in a beta branch and builds in TC _before_ you ask for a merge.
- 2 new fields in jira: Target viewer version - set to indicate which branch should go (beta or dev)
- PE - if there’s any chance it will go to beta (bug fixes), please branch from beta.
Team Status
Merov Linden
PAST
- STORM-151: kdu compression: A day of experiments: produced my first jp2 images, read more example code, understood some of the arcane stuff in jp2. I'm testing few different options and flags. All local test code though.
- Hold OH
FUTURE
- STORM-151: kdu compression: Move to implementing compression code into viewer code.
IMPEDIMENTS
- none
Oz Linden
PAST
- Realized that the codereview system doesn't have enough disk space, researched how to resize it
- Worked on clarifying rules for use of the Map API javascript code (WEB-1560)
- Prepped some documentation for codereview usage
- Commented on a bunch of Jonathan’s issues (need Esbee for most)
- Finally got access to S3 resources I needed...
FUTURE
- Resize codereview file system
- Post test review
- Announce/Open code review system
- Document code review system on wiki
- Merge Monkeying
IMPEDIMENTS
- none
Q Linden
PAST
- Office hour
- Beta announce
- Builds
- Meetings
FUTURE
- Beta 2.4
- meetings
- Merge meeting
IMPEDIMENTS
- none
Esbee Linden
- OOO
Paul ProductEngine
PAST
- STORM - 696 (Event Details floater doesn't follow opacity settings)
- Fixed & sent to bitbucket
- STORM - 697 (Nearby Chat window is semitransparent even if inactive opacity is 1)
- Fixed & sent to the bitbucket
- TASK STORM- 622 (Texture picker screws up when multiple textures are opened)
- WIP. Estimate ~ 12 hours
FUTURE
- TASK STORM- 622 (Texture picker screws up when multiple textures are opened)
IMPEDIMENTS
- none
Seth Productengine
PAST
- BUG (STORM-667) Nametag barely readable due to poor contrast
- Fixed.
- TASK (STORM-584) Fix color and opacity setting for Bubble Chat
- Implemented according to Esbee's latest comments. Not pushing until the fix for STORM-667 is merged to avoid conflicts.
FUTURE
- TASK (STORM-693) Preview thumbnails in the Edit Wearable and Edit Body Parts panels do not honor opacity settings
- BUG (STORM-378) Snapshot animation should be played when snapshot is actually taken, not sent
- BUG (STORM-550) LLDir::getNextFileInDir fails for some complex wildcard combinations
IMPEDIMENTS
- none
Andrew Productengine
PAST
- Critical bug STORM-527 (Jumping Halts Strafing Movement).
- Investigated further. Made sure it's server-side, left comment in
ticket about this and unassigned.
- Major bug STORM-673 (duplicated XUI ID: error basename="panel_preferences_privacy.xml" message="Duplicate node exists: id=cache_size_label_l").
- Fixed and put on review.
- Normal task STORM-34 (As a User, I want a list of my favorite locations available on the login screen so i can log in to SL right where I want to be).
- Investigated. Discussed with Vadim and Plan. Asked questions in ticket. Rough estimate- 3 days.
FUTURE
- Normal task STORM-34 (As a User, I want a list of my favorite
locations available on the login screen so i can log in to SL right where I want to be).
IMPEDIMENTS
- STORM-34 - question in jira
- STORM-527 needs a new home
Vadim Productengine
PAST
- Task STORM-686 (Transparency settings aren't applied to the map preview inside Map floater):
- Tried fixing but failed (due to lack of OpenGL knowledge) and unassigned.
- Re-fixed STORM-676 and STORM-677 (opacity of texture/color pickers) according to feedback from Q, but my fix seems to break STORM-697 (nearby chat opacity). Investigating.
FUTURE
- STORM-676 and STORM-677.
IMPEDIMENTS
- none
Andrey Productengine
PAST
- picked up Beta1 2.4.0 r215641 build
- re-run smoke & integrity tests against this build
- proceed with 2.4.0 bugfixes verification (+re-run previously deferred tickets)
FUTURE
- r215641 regression testing
- bugfixes verification
IMPEDIMENTS
- none
Jonathan Yap
PAST
- Email to Esbee - list of things I would like to take up in the next scrum. As these are changes
they need to be considered in advance.
- Send daily email to dev mailing list - soliciting comments.
FUTURE
- Daily email to dev mailing list.
- Looking into other issues & ideas.
- [long range]
- Update lsl wiki - remove Unsupported icon next to llTextBox. Timing of when to make this edit?
IMPEDIMENTS
- none