Snowstorm Daily Scrum Archive/12172010
Jump to navigation
Jump to search
Friday, December 17, 2010
General Notes
- Merge Monkey of the Day: Oz
- Merov needs review in STORM-151!
Team Status
Merov Linden
PAST
- STORM-745 : Produce comprehensive perf baseline: Created a set of images to compress and a huge baseline for Mac.
- STORM-744 : Add unit tests to llkdu: Reactivated the broken llimage/tests/llimageworker_test.cpp unit tests and fixed it.
FUTURE
- STORM-745 : Produce comprehensive perf baseline: Complete that work for Mac.
- STORM-744 : Add unit tests to llkdu: Finish fixing the llimage test and add new ones to llkdu.
IMPEDIMENTS
- none
Oz Linden
PAST
- Merge Monkey
- merged some fixes, created a couple of MM tools
- Learning corner cases in codereview
- Lindens vs Residents snowball fight
- Fixing more internal documentation
FUTURE
- libcurl test
- Merge Monkey
- Autobbuild audits so we can publish it as open source
IMPEDIMENTS
- none
Q Linden
PAST
- Reviewed several items in CR tool and other JIRAs and commented on one, but merov beat me to most of them
- Reviewed wiki for Merov
- Several meetings
- Ship 2.4
- A lot of OOO medical; sorry.
FUTURE
- OOO and some triage, maybe
- Meetings
- OOO next Mon for PGI hackathon
IMPEDIMENTS
- holiday and medical OOO will limit my productivity through New Year
Esbee Linden
PAST
- Lots of meetings
- Snowstorm team meeting
- Review integration queue
- Viewer 2.4 release stuff
- Finalize Viewer 2.4 blog post and publish
FUTURE
- Lots of meetings
- Review integration queue
- Upload sketches of saved layouts
- VWRs to check on
- VWR-21493
- STORM-525
- STORM-529. It was re-resolved as no repro.
- STORM-702. Caused issues based on fix. Let's chat more with PE about this. (Nyx is going to take a look at this)
- Review VWR-16569 - Will review. Jonathan wants this one.
- Review Jonathan's work list
- Touch base w/Taka on STORM-398
- See comments on STORM-713
- Think about what to do with VWR tickets assigned to ProductEngine (I'm thinking we just un-assign these - need to review the tickets first though)
IMPEDIMENTS
- Time
Paul ProductEngine
- OOO - sick
Seth Productengine
PAST
- BUG (STORM-550) LLDir::getNextFileInDir fails for some complex wildcard combinations
- WIP. Got unit tests working with new directory iterator. The iterator doesn't handle changes in directory contents for now.
FUTURE
- BUG (STORM-550) LLDir::getNextFileInDir fails for some complex wildcard combinations
IMPEDIMENTS
- Story (STORM-28) As a User, I want the ability to send my calling card to others.
- Waiting for more details.
Andrew Productengine
PAST
- Normal task STORM-2 (As a User, I want to set my own default views with specific UI layout so I can tailor my Viewer experience to the activities I'm most interested in).
- Completed first raw implementation of save and load. Will prettify it a little tomorrow, test and make some temporary simple UI for it.
FUTURE
- STORM-2. Finish first raw version of the fix. Estimate - 1 day. So
it would be good to have design of UI and answer from Q about files (STORM-777) as soon as possible to implement the final version next week.
- Estimate - 1 day.
IMPEDIMENTS
- STORM-2 - No design for UI ( STORM-753 (Design the UI for viewer saved layouts))
- No reply from Q to letter regarding STORM-777 (Design the file format
for layout information and discuss it).
Vadim Productengine
PAST
- Bug STORM-529 (Undo feature missing from BUILD menu):
- Fixed.
- Bug STORM-776 (unable to change permissions to "no trans" on item in avatar inventory):
- Reviewed and tested Wolfpup's patch.
- Bug STORM-410 (Region and parcel SLApps are displayed in non-human readable format):
- Created two subtasks. Implemented the first one and assigned the second one to Esbee.
FUTURE
- Bug STORM-446 (CLicking on the secondlife:///app/classified/{UUID}/about SLapp does not display the details for the specified classified in the People side tray).
- Bug STORM-511 (User is not able to view full name of group in title of group notification).
IMPEDIMENTS
- Need feedback from Esbee in:
- STORM-702 (Make it possible to wear partial outfits).
- STORM-797 (Parcel SLURL rendering).
- What to do with VWR tickets assigned to ProductEngine Team?
https://jira.secondlife.com/secure/IssueNavigator.jspa?mode=hide&requestId=13071
Andrey Productengine
PAST
- picked up v-d build r217184
- verified 16 integrated tickets
- verified six cannot repro & expected behavior tickets
- completed design & review of test plans: Object Permissions, Snapshots, World Map, World MiniMap
FUTURE
- pick up next v-d build
- run regression suite in scope of recent changes
IMPEDIMENTS
- None
Wolfpup Lowenhar
PAST
- Worked in world
- replied to Oz's email.
- looked @ Bug Queue : viewer-development to see if could find some thing else to work on.
FUTURE
- Work @ RL and in world.
- Check Bug Queue : viewer-development some more.
IMPEDIMENTS
- Not enough time between working in-world and at real job to actually work on code.
- Right Hand(it is slowly healing but will take time since it is the tip of middle finger.)
- Trying to Figure out what to work on and still waiting on answer for STORM-236.