GWA Project/Meeting Summaries/Archive 01
Jump to navigation
Jump to search
Summary of the Meeting of June 8th 2008
Sims:
- Suggestions for names of the planned sims should be posted at this thread. In case Jean Linden confirmes that the Names of the Sims can be changed, there will be a vote at the next meeting.
- Additional help groups and communities might be contacted in order to help the German Mentors with certain (previously planned) projects.
- The topic Giefing problems, especially with a proposed sandbox coming (from Keumjoo Ahn) was postponed.
- As decided on an earlier meeting already, one of the four islands will become a stand alone, linear OI.
- There should be suggestions made for Sim 1 to 4 within the next week.
Sonstiges:
- The EM should be abolished.
- Discussions will be held in German, summaries will be posted in German and translated to English.
- Summeries of meetings will be posted at the wiki in English and German by Zai Lynch, in case every agenda item got a formulated and accepted conclusion, which is expressed during the meeting.
- The German Mentors apply for a parcel at SL5B. This will be coordinated by Gunter Gustav, TalinaQ Yao, Peter Houston and sexina Babii. This should take place in cooperation with the German speaking Linguists, if possible
- Agenda items from Danziel Lane will be discussed at the connected forum posting.
- From now on, there will be two meetings per week. Dates swill be suggested and discussed in the forum.