SL Volunteer Island/Freebie Store Committee/Meeting Summeries

From Second Life Wiki
< SL Volunteer Island‎ | Freebie Store Committee
Revision as of 21:11, 9 July 2008 by Zai Lynch (talk | contribs) (summary of todays meeting added)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This page lists the summeries of the Freebie Store Committee meetings. The complete transcripts including lists of attendees are linked to the committee page.

July 9th 2008

Summary

A short summary about the decisions and topics of this meeting:

  1. Freebie donators will place their freebie in the showcase and in the regular category, so the showcase can be cleared without the need to worry about moveing the contribution.[1]
  2. The freebie store (fleebie market) should be set up asap as a work in progress.[2]
  3. The showcase will be in the center of the market, beeing surrounded by the different categories.[3]
  4. The market area should be completly reazzable with a draw distance of 96 meter.[4]
  5. To reduce overlap between possible contributions and SLVEC items, the SLVEC large shops will be removed and more personal kiosks will be added instead.[5]
  6. An additional category with household items for the freebie store.[6]
  7. The center showcase area should be communitylike (campfire / fountain / ...).[7]
  8. There is no deadline for building but the sooner the better.[8]


June 19th 2008

Summary

A short summary about the decisions and topics of this meeting:

  1. The freebie store should have a display area (on an extra parcel) where new freebies can be displayed. This area becomes cleaned once a month and freebies from there are supposed to be placed in the main freebie store. The display area is supposed to be advertised monthly via the VTeam Blog.
  2. Freebies at the store should be categorized.
    A list of these categories will be discussed at this Wiki page.
  3. The freebie store building (Fleebie Store quote from Lexie) should be open and without a roof.
    Building work might be done by Jezzie.
  4. Suggestions on maintenance and possibe guidelines were made (see transcript [13:38] and following comments) and will be discussed at a VTeam meeting.