Difference between revisions of "Snowstorm Daily Scrum Archive"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
<br clear="all"/> | <br clear="all"/> | ||
== | == Wednesday, October 13, 2010 == | ||
=== General Notes === | === General Notes === | ||
---- | ---- | ||
* Merge Monkey of the Day: | * Merge Monkey of the Day: Oz | ||
===Team Status=== | ===Team Status=== | ||
Line 16: | Line 14: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* STORM- | * STORM-137: Ready for review. | ||
* STORM- | * STORM-104: kdu upgrade: Started to move things around quite a bit in preparation of that change... | ||
* | * External build: worked with team chopper to understand what was going wrong there. Got some insight in this. | ||
* OH | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* Beta monitoring and merge monkey-ing (merges, try to identify bugs I can contribute to) | * Beta monitoring and merge monkey-ing (merges, try to identify bugs I can contribute to) | ||
* | * STORM-104: kdu upgrade | ||
* STORM-105 : Perf decompression: put new data out, check the work done by opensource-dev community on similar tests. | * STORM-105 : Perf decompression: put new data out, check the work done by opensource-dev community on similar tests. | ||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
Line 33: | Line 30: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | * Updating develop.secondlife.com (changes not yet published) | ||
* | * Build fixes checked in to viewer-development | ||
* | ** STORM-222 | ||
** STORM-275 | |||
** STORM-368 | |||
** STORM-374 | |||
* Helped with merge problem in mesh development | |||
* Reviewed and checked in fixes for STORM-137 and STORM-367 | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * Figure out how to test updated libcurl VWR-22780 | ||
* | ** So that we can unblock VWR-20801 (socks 5 proxy) | ||
* Merge Monkey | |||
** Pull outstanding beta fixes | |||
** Drain Snowstorm integration queue | |||
* More changes to develop site | |||
* Office Hour | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
Line 46: | Line 53: | ||
==== Q Linden==== | ==== Q Linden==== | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | * Release | ||
* | * Office hours | ||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * Release | ||
* | * Now worried about STORM-381 | ||
* Testing | |||
* OOO tomorrow fri | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
* | * Release | ||
* Gotta slow down personally | |||
==== Esbee Linden==== | ==== Esbee Linden==== | ||
Line 62: | Line 71: | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* Viewer release process review | * Viewer release process review | ||
* Viewer 2.2 Beta & Release prep | |||
* VWR triage | * VWR triage | ||
* Systems requirements research | * Systems requirements research | ||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* Write Viewer 2.2 Release blog post | |||
* VWR triage | * VWR triage | ||
* Systems requirements analysis | * Systems requirements analysis | ||
* Viewer 2.2 Release | * Viewer 2.2 Release | ||
* Office Hours | |||
* Playing with the Mesh Project Viewer! | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
Line 79: | Line 90: | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* STORM-211 Fade timer is reset for all toasts displayed in the notifications channel | * STORM-211 Fade timer is reset for all toasts displayed in the notifications channel | ||
** Today while testing found one case in which behavior is wrong. | ** Today while testing found one case in which behavior is wrong. Will give VS this bug. | ||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * Other tickets by priority | ||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
Line 90: | Line 101: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* BUG (STORM-294) Selection goes out of Favorites overflow list if | * BUG (STORM-294) | ||
scroll it by keyboard | * Selection goes out of Favorites overflow list if scroll it by keyboard | ||
** | ** Fixed. Reassigned for reviewing. | ||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* BUG (STORM- | * BUG (STORM-303) Favorites folder content isn't refreshed while re-ordering landmaks | ||
** Estimated: 6-8 hours. | |||
** Estimated: | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
Line 105: | Line 115: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* | * STORM-362 ([HARD CODED] ALL LANGS: Unlocalized keyboard keys under Advanced menu > Shortcuts (French viewer)) | ||
** | ** Found Eli's recent changeset with fix and closed as cannot reproduce. | ||
* Bug | * Bug STORM-279 (Inability to uncheck avatar cloth in Ultra graphics settings, despite debug setting working) | ||
** Fixed and sent for review. | ** Fixed and sent for review. | ||
* Bug STORM-322 (Group Member Search: gives more entries then the search string suggests) | |||
** Investigated. Estimate- 8 hours. | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* STORM- | * Bug STORM-322 (Group Member Search: gives more entries then the search string suggests). | ||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
Line 119: | Line 131: | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
* Bug STORM- | * Bug STORM-358 (URL-name of object is shown as a hyperlink in the nearby chat toasts)
: | ||
** Fixed. | |||
* Bug STORM-359 (URL-name of object is shown as a hyperlink in the llGiveInventory dlg): | |||
** Fixed. | ** Fixed. | ||
* Bug STORM-360 (URL-name of object is shown as a hyperlink in Message Well window): | |||
** Fixed. | |||
* Bug STORM-290 (Home SP is white and does not contain any information after clearing Viewer settings on PC): | |||
** Investigated, resolved as not reproducible (intermittent server problem). | |||
* Filed bug STORM-376 (Toast close button sometimes doesn't disappear), investigated, found its reason. | |||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
* | * If no higher priority tasks arise, will | ||
** | ** fix bug STORM-376 | ||
** take something from the viewer-development backlog. | |||
** | |||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
Line 135: | Line 151: | ||
==== Andrey Productengine ==== | ==== Andrey Productengine ==== | ||
---- | ---- | ||
<b>PAST</b><br /> | |||
* smoke tests almost done (couple of tests left for OSX build) | |||
* planned regression subset completed on 43% | |||
<b>FUTURE</b><br /> | |||
* complete regression 211863@v-d regression testing | |||
<b>IMPEDIMENTS</b><br /> | |||
* none | |||
==== Grumpity ProductEngine ==== | ==== Grumpity ProductEngine ==== | ||
---- | ---- | ||
<b>PAST</b><br /> | <b>PAST</b><br /> | ||
<b>FUTURE</b><br /> | <b>FUTURE</b><br /> | ||
<b>IMPEDIMENTS</b><br /> | <b>IMPEDIMENTS</b><br /> | ||
== Past Updates == | == Past Updates == | ||
<b>October</b><br /> | <b>October</b><br /> | ||
[[Snowstorm_Daily_Scrum_Archive/10112010 | 11]] |[[Snowstorm_Daily_Scrum_Archive/10082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/10072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/10062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/10052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/10042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/10012010 | 01]] | [[Snowstorm_Daily_Scrum_Archive/10122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/10112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/10082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/10072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/10062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/10052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/10042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/10012010 | 01]] | ||
<b>September</b><br /> | <b>September</b><br /> |
Revision as of 11:07, 14 October 2010
Wednesday, October 13, 2010
General Notes
- Merge Monkey of the Day: Oz
Team Status
Merov Linden
PAST
- STORM-137: Ready for review.
- STORM-104: kdu upgrade: Started to move things around quite a bit in preparation of that change...
- External build: worked with team chopper to understand what was going wrong there. Got some insight in this.
- OH
FUTURE
- Beta monitoring and merge monkey-ing (merges, try to identify bugs I can contribute to)
- STORM-104: kdu upgrade
- STORM-105 : Perf decompression: put new data out, check the work done by opensource-dev community on similar tests.
IMPEDIMENTS
- none
Oz Linden
PAST
- Updating develop.secondlife.com (changes not yet published)
- Build fixes checked in to viewer-development
- STORM-222
- STORM-275
- STORM-368
- STORM-374
- Helped with merge problem in mesh development
- Reviewed and checked in fixes for STORM-137 and STORM-367
FUTURE
- Figure out how to test updated libcurl VWR-22780
- So that we can unblock VWR-20801 (socks 5 proxy)
- Merge Monkey
- Pull outstanding beta fixes
- Drain Snowstorm integration queue
- More changes to develop site
- Office Hour
IMPEDIMENTS
- none
Q Linden
PAST
- Release
- Office hours
FUTURE
- Release
- Now worried about STORM-381
- Testing
- OOO tomorrow fri
IMPEDIMENTS
- Release
- Gotta slow down personally
Esbee Linden
PAST
- Viewer release process review
- Viewer 2.2 Beta & Release prep
- VWR triage
- Systems requirements research
FUTURE
- Write Viewer 2.2 Release blog post
- VWR triage
- Systems requirements analysis
- Viewer 2.2 Release
- Office Hours
- Playing with the Mesh Project Viewer!
IMPEDIMENTS
- none
Paul ProductEngine
PAST
- STORM-211 Fade timer is reset for all toasts displayed in the notifications channel
- Today while testing found one case in which behavior is wrong. Will give VS this bug.
FUTURE
- Other tickets by priority
IMPEDIMENTS
- none
Seth Productengine
PAST
- BUG (STORM-294)
- Selection goes out of Favorites overflow list if scroll it by keyboard
- Fixed. Reassigned for reviewing.
FUTURE
- BUG (STORM-303) Favorites folder content isn't refreshed while re-ordering landmaks
- Estimated: 6-8 hours.
IMPEDIMENTS
- none
Andrew Productengine
PAST
- STORM-362 ([HARD CODED] ALL LANGS: Unlocalized keyboard keys under Advanced menu > Shortcuts (French viewer))
- Found Eli's recent changeset with fix and closed as cannot reproduce.
- Bug STORM-279 (Inability to uncheck avatar cloth in Ultra graphics settings, despite debug setting working)
- Fixed and sent for review.
- Bug STORM-322 (Group Member Search: gives more entries then the search string suggests)
- Investigated. Estimate- 8 hours.
FUTURE
- Bug STORM-322 (Group Member Search: gives more entries then the search string suggests).
IMPEDIMENTS
- none
Vadim Productengine
PAST
- Bug STORM-358 (URL-name of object is shown as a hyperlink in the nearby chat toasts)
:
- Fixed.
- Bug STORM-359 (URL-name of object is shown as a hyperlink in the llGiveInventory dlg):
- Fixed.
- Bug STORM-360 (URL-name of object is shown as a hyperlink in Message Well window):
- Fixed.
- Bug STORM-290 (Home SP is white and does not contain any information after clearing Viewer settings on PC):
- Investigated, resolved as not reproducible (intermittent server problem).
- Filed bug STORM-376 (Toast close button sometimes doesn't disappear), investigated, found its reason.
FUTURE
- If no higher priority tasks arise, will
- fix bug STORM-376
- take something from the viewer-development backlog.
IMPEDIMENTS
- none
Andrey Productengine
PAST
- smoke tests almost done (couple of tests left for OSX build)
- planned regression subset completed on 43%
FUTURE
- complete regression 211863@v-d regression testing
IMPEDIMENTS
- none
Grumpity ProductEngine
PAST
FUTURE
IMPEDIMENTS
Past Updates
October
12 | 11 | 08 | 07 | 06 | 05 | 04 | 01
September
27 | 24 | 23 | 22 |
21 | 20 | 17 | 16 | 15 | 14 | 13 | 9 | 8 | 7 | 3 | 2 | 1