Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


==  Wensday, November 3, 2010  ==
==  Friday, November 5, 2010  ==


=== General Notes ===
=== General Notes ===
----
----
* Merge Monkey of the Day: Oz
* Merge Monkey of the Day: Oz
* IMPORTANT: Please remember - when merging your fixes into Beta, you must also pull them into viewer-development immediately after.  
* IMPORTANT: Please remember - when merging your fixes into Beta, you must also pull them into viewer-development immediately after.
* If you take a bug off any of the bug queues, please move it to the current sprint.
* If you take a bug off any of the bug queues, please move it to the current sprint.
* When you pick up an issue in current sprint, please set a time estimate before you start working on it.
* When you pick up an issue in current sprint, please set a time estimate before you start working on it.
Line 17: Line 17:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Merge Monkeying and code reviews: cleared Sprint 6 "Approved" swim lane
* STORM-105 : Finished perf gathering:  
* Sprint 7 meeting (long) then review tasks assigned to me (or likely to be)
** Pushed last set of changes, updated wiki, wrote test plan, submitted the whole thing to Vadim for review.
* libcurl issue: logged an autobuild bug and proposed plausible solution
** Exchanged email with a community member about the use of this system for his own test
* Office Hour
** Tests: kdu dynamic, openjpeg, kdu static. Can't upload them to wiki though... grrr...
* STORM-422: review Vadim's proposal
* STORM-150 : Read most Kakadu docs, listed potentially interesting improvements to study, email Oz on some licensing issues
* STORM-150: received kdu bits, started to read Kakadu docs and potentially interesting improvements


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* STORM-105 : Perf gathering: get and post data comparing llkdu (base), kdu statically linked and openjpeg
* STORM-150: Finish that
* STORM-104: kdu upgrade: commit the static linking changes to dev repo
* STORM-104 : kdu upgrade: commit the static linking changes to dev repo
* Merge Monkeying and code reviews


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 35: Line 33:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* More testing of getNextFileInDir
* Rebuilt Beta repo (twice)
** Documented bugs in VWR-23697
* Pulled 5 issues from integration queue


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Working on TPV Directory
* Continue merge monkey (nothing currently queued)
* Finish setting up new TPV Directory


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 47: Line 46:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Crash rate
* Beta 3 checkin issues
* Personnel work
* STORM-143 advice
* Beta 2
* Testing for ER-146
* Voice bug analysis work
* Sprint planning
* review several JIRAs with Grumpity


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Antialiasing
* Beta 3 merges if they need help
* Crash rate
* STORM-223
* Beta 3 planning
* Look at prefs code
* Meetings
* Triage


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 67: Line 63:
<b>PAST</b><br />
<b>PAST</b><br />
* Triage
* Triage
* Lots of meetings
* Prefs work prepped and sent out for review
* "Some" prefs work
* Started prim alignment design doc
* Sprint Planning
* Test ER-146
* OOO half day today - missed my OH :(


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Preferences design work
* Update prefs design
* Reviewing my assigned tickets
* Finish design doc for prim alignment
* VWR Triage
* VWR Triage* Prioritizing tickets for team and queuing up more work
* Putting together a list of scrummaster responsibilities for grumpity


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 85: Line 79:
<b>PAST</b><br />
<b>PAST</b><br />
* BUG STORM-450 (Incorrect help contexts for Sidebar People tab)
* BUG STORM-450 (Incorrect help contexts for Sidebar People tab)
** WIP. Still not sure about cause of the problem. Estimate ~5-6 hours.
** Fixed and sent for review
 
* BUG STORM-535 PLEASE allow adjustable transparency of "Nearby Chat" window, Chat History and Chat "Toasts" in Viewer 2.0!
** Investigating. Discussed with Vadim design issues. Estimate: approximately 8h.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* BUG STORM-450 (Incorrect help contexts for Sidebar People tab)
* BUG STORM-535 PLEASE allow adjustable transparency of "Nearby Chat" window, Chat History and Chat "Toasts" in Viewer 2.0!
* BUG STORM-461 (SP icons are shown in the Mouselook mode)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 96: Line 92:
==== Seth Productengine ====
==== Seth Productengine ====
----
----
<b>PAST</b><br />  
<b>PAST</b><br />
* BUG (STORM-133) Scroller doesn't follow the cursor if cursor is being moved by keyboard arrow buttons
* BUG (STORM-441) "Events Details" floater does not contain information about event
** Could not reproduce, instead found another issue:
** Closed as "Cannot Reproduce"
* BUG (STORM-536) Unable to scroll to collapsed accordion tab with keyboard arrows in Places SP->My Landmarks.
* BUG (STORM-189) [TRUNCATION] many langs - select build tools dialog
** WIP. Fixed navigation with up arrow. Working on the issue with down arrow navigation to closed accordion tab.
** Fixed.
* BUG (STORM-284) The "+" sign appears when user tries to drop a landmark to Favorites bar from in-world object contents
** Fixed.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* BUG (STORM-536) Unable to scroll to collapsed accordion tab with keyboard arrows in Places SP->My Landmarks.
* BUG (STORM-308) IM chiclet's speaking indicator isn't active while self-talking
** Estimated: 4-6 hours
** Estimated: 8 hours.
* Pick some issues from sprint 7.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 113: Line 110:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Critical bug STORM-472 (Crash decoding jpg image)
* Major bug STORM-261 (In V2.2.0 Script Editor, cannot see any line
** Fixed the issue, but will test, write comments etc. so estimate is about 3-4 hours more.
numbers other than the current one)
** Fixed and sent for review.
* Normal bug STORM-320 (Script Editor in Viewer 2.0+ "tabs" incorrectly)
** Investigating. Still not sure where the problem is. Estimate- 16 hours.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* STORM-404.
* STORM-320
* Other tickets by priority.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 126: Line 125:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Major bug STORM-422 (disable crashlogger via client parameters):

* Bug STORM-546 (Remove lots of dead renderForSelect() code from the rendering pipeline...):
** Fixed.
** Applied and tested a 3rd-party fix.
* Severe bug STORM-520 (crash at LLViewerObjectList::removeFromLocalIDTable):
* Bug STORM-225 (Massive lag spike when opening Land Related windows):
** Investigating. Cannot reproduce so far.
**
Resolved as not reproducible.
* Sprint planning meeting.
* Bug STORM-257 (Camera view changes before avatar starts to turn):
** Resolved as not reproducible.
* Investigated LL unit testing framework.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Continue with STORM-520.
* Story STORM-52 (Hook up external script editor).
No ETA yet.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* no stories to take from Sprint 7
* PE devs need more tickets to work on.


==== Andrey Productengine ====
==== Andrey Productengine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* picked up Beta2 213435 build
* verified v-d integrated tickets
** smoke and integrity tests have been done
* processed cannot reproduce, expected behavior STORM tickets
** regression testing started
* started regression testing of v-d r213735 build


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* complete regression testing of 213435 build
* proceed with regression testing of v-d


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />

Revision as of 10:55, 5 November 2010


Friday, November 5, 2010

General Notes


  • Merge Monkey of the Day: Oz
  • IMPORTANT: Please remember - when merging your fixes into Beta, you must also pull them into viewer-development immediately after.
  • If you take a bug off any of the bug queues, please move it to the current sprint.
  • When you pick up an issue in current sprint, please set a time estimate before you start working on it.

Team Status


Merov Linden


PAST

  • STORM-105 : Finished perf gathering:
    • Pushed last set of changes, updated wiki, wrote test plan, submitted the whole thing to Vadim for review.
    • Exchanged email with a community member about the use of this system for his own test
    • Tests: kdu dynamic, openjpeg, kdu static. Can't upload them to wiki though... grrr...
  • STORM-150 : Read most Kakadu docs, listed potentially interesting improvements to study, email Oz on some licensing issues

FUTURE

  • STORM-150: Finish that
  • STORM-104 : kdu upgrade: commit the static linking changes to dev repo

IMPEDIMENTS

  • None!!

Oz Linden


PAST

  • Rebuilt Beta repo (twice)
  • Pulled 5 issues from integration queue

FUTURE

  • Continue merge monkey (nothing currently queued)
  • Finish setting up new TPV Directory

IMPEDIMENTS

  • none

Q Linden


PAST

  • Beta 3 checkin issues
  • STORM-143 advice
  • Testing for ER-146

FUTURE

  • Beta 3 merges if they need help
  • STORM-223
  • Look at prefs code
  • Triage

IMPEDIMENTS

  • none

Esbee Linden


PAST

  • Triage
  • Prefs work prepped and sent out for review
  • Started prim alignment design doc
  • Test ER-146

FUTURE

  • Update prefs design
  • Finish design doc for prim alignment
  • VWR Triage* Prioritizing tickets for team and queuing up more work

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • BUG STORM-450 (Incorrect help contexts for Sidebar People tab)
    • Fixed and sent for review
  • BUG STORM-535 PLEASE allow adjustable transparency of "Nearby Chat" window, Chat History and Chat "Toasts" in Viewer 2.0!
    • Investigating. Discussed with Vadim design issues. Estimate: approximately 8h.

FUTURE

  • BUG STORM-535 PLEASE allow adjustable transparency of "Nearby Chat" window, Chat History and Chat "Toasts" in Viewer 2.0!

IMPEDIMENTS

  • none

Seth Productengine


PAST

  • BUG (STORM-441) "Events Details" floater does not contain information about event
    • Closed as "Cannot Reproduce"
  • BUG (STORM-189) [TRUNCATION] many langs - select build tools dialog
    • Fixed.
  • BUG (STORM-284) The "+" sign appears when user tries to drop a landmark to Favorites bar from in-world object contents
    • Fixed.

FUTURE

  • BUG (STORM-308) IM chiclet's speaking indicator isn't active while self-talking
    • Estimated: 8 hours.

IMPEDIMENTS

  • none

Andrew Productengine


PAST

  • Major bug STORM-261 (In V2.2.0 Script Editor, cannot see any line

numbers other than the current one)

    • Fixed and sent for review.
  • Normal bug STORM-320 (Script Editor in Viewer 2.0+ "tabs" incorrectly)
    • Investigating. Still not sure where the problem is. Estimate- 16 hours.

FUTURE

  • STORM-320

IMPEDIMENTS

  • none

Vadim Productengine


PAST

  • Bug STORM-546 (Remove lots of dead renderForSelect() code from the rendering pipeline...):


** Applied and tested a 3rd-party fix.

  • Bug STORM-225 (Massive lag spike when opening Land Related windows):
    • 
Resolved as not reproducible.
  • Bug STORM-257 (Camera view changes before avatar starts to turn):

    • Resolved as not reproducible.
  • Investigated LL unit testing framework.

FUTURE

  • Story STORM-52 (Hook up external script editor).

No ETA yet.

IMPEDIMENTS

  • PE devs need more tickets to work on.

Andrey Productengine


PAST

  • verified v-d integrated tickets
  • processed cannot reproduce, expected behavior STORM tickets
  • started regression testing of v-d r213735 build

FUTURE

  • proceed with regression testing of v-d

IMPEDIMENTS

  • none

Past Updates

November
02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 9 | 8 | 7 | 3 | 2 | 1

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16