Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Friday, January 7, 2011  ==
== Monday, January 10, 2011  ==


=== General Notes ===
=== General Notes ===
----
----
* Reminder to devs. If a ticket doesn't pass Review and is rejected, it will move back to the To Do column in GH, if you do more work or clarify questions, it should be moved back through In Progress and then to In Review.
* Reminder to devs. If a ticket doesn't pass Review and is rejected, it will move back to the To Do column in GH, if you do more work or clarify questions, it should be moved back through In Progress and then to In Review.
* MMOTD: Oz
* MMOTD: Merov
* PE is on holiday today - Orthodox Christmas
* PE was on holiday Friday.


===Team Status===
===Team Status===
Line 16: Line 16:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-828 : Texture Saving Does Not Work : investigated more with Bao. Issue moved to Bao's backlog.
* STORM-526 : Log out failure during Login causes loss of pending offers, including inventory : Look at that code, can't repro but pointed at potential issues, commented in JIRA
* STORM-150 : Evaluate kakadu new capabilities : Wrote doc, moved to review state, reviewed
* Cleaned-up sprint 9 stuff
* STORM-104 : Update KDU to more recent version (v6.4) so we take advantage of decompression perf gain : All sub-tasks done so moved to review state.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Clean-up all dangling sprint 9 issues assigned to me
* sprint planning
* STORM-745 : Produce comprehensive perf baseline: Complete that work.
* STORM-745 : Produce comprehensive perf baseline: Complete that work.


Line 30: Line 29:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Merge Monkey (tagged 2.5.0-start)
* Merge Monkey (up to 2.5.0-start tag), handed off to Merov
* Set up some third party lib bitbucket repos
* More looking at old VWR patches
* Code reviews
* Tracking down viewer dependencies
* Looking at old VWR patches
* OH
* Help triage a TPV issue with SLURLs


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Merge Monkey (handoff to Merov at EOD)
* Sprint planning
* More looking at old VWR patches
* More VWR mining
* Tracking down viewer dependencies, start updating wiki


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 46: Line 43:
==== Q Linden====
==== Q Linden====
----
----
* OOO
<b>PAST</b><br />
* LL Planning meeting
* STORM-34
* STORM-777
* SOCIAL-437 / VWR-24440
* STORM-830
* Blog post
 
<b>FUTURE</b><br />
* STORM-830
* Sprint planning
* Triage
 
<b>IMPEDIMENTS</b><br />
* none


==== Esbee Linden====
==== Esbee Linden====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* HR stuff
* Meetings, Email
* Meetings, Email
* PO reviews
* Wrote Viewer 2.5 Beta 1 blog post
* Discussed STORM-34, STORM-2, & STORM-753 w/Q
* Played with Beta
* Reviewed STORM-34,STORM-2, and STORM-753
* Contacted Rhett about STORM-34
* Looped Q into the discussion about Viewer icons and the naming of Developer Viewers
* Discussions about Viewer 2.5 beta 1


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Meetings
* Meetings
* Write draft for Viewer 2.5 blog post
* Sprint Planning
* Rev Viewer 2.5 Beta 1 Blog post
* Review Snowstorm Team product backlog and bug log
* Review Snowstorm Team product backlog and bug log
* Work with Rhett on next steps for Viewer icons
* PO reviews for open tickets
* PO reviews for open tickets
* Finish going through the list of VWRs assigned to PE (finally)
* Finish going through the list of VWRs assigned to PE (finally)
Line 69: Line 77:
* Look at VWR-18435 and VWR-24357 for Jonathan  
* Look at VWR-18435 and VWR-24357 for Jonathan  
* Add instructions for STORM-236 for Wolfpup
* Add instructions for STORM-236 for Wolfpup
 
* Look at STORM-383, -797, -28, -447


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* STORM-702 needs to be moved back through to the Review process so we can do PO and code reviews.
* none


==== Paul ProductEngine====
==== Paul ProductEngine====
----
* OOO - holiday
==== Seth Productengine ====
----
<b>PAST</b><br />
* BUG (STORM-396) Mouse cursor changes to "+" if try to drop a landmark from object inventory or notecard onto Favorites Bar
** Could not reproduce.
* BUG (STORM-385) Pressing ENTER key in the Favorites overflow list scrolls list
** Fixed.
<b>FUTURE</b><br />
* BUG (STORM-383) Context menu cannot be open for Landmark that are located  in the My inventory->Trash folder
<b>IMPEDIMENTS</b><br />
Waiting for Esbee's reply on the following issues:
* TASK (STORM-797) Parcel SLURL rendering
* TASK (STORM-28) As a User, I want the ability to send my calling card to others
* BUG (STORM-447) User is not able to share multi selected objects using drag&drop
==== Andrew Productengine ====
----
* OOO - holiday
==== Vadim Productengine ====
----
* OOO - holiday
==== Andrey Productengine ====
----
* OOO - holiday
==== Jonathan Yap ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-830 (Volume slider isn't properly remembered if set to zero)
* STORM-370 (Human-readable name of region disappears from Location Bar after pressing ESC)
** Fixed, but looking for comments on Review Board.
** Fixed and sent for review
** Long IRC discussion with Aleric this morning on this one.
* Wrote VWR-24416 (Allow user to supply/define her own objects in the build floater)
* STORM-435 (There is no space between name of object and value of object in Chat step while creating new gesture)
** Fixed.
* Commented on Review Board entry for STORM-829 (Viewer 2 does not parse /me in object Instant Messages)


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* I have other commitments for the next two weeks and will not be around as much.
* STORM-387 (Part of the table is hidden after increasing firsts column width in the floater and then dock it to the SP)
 
* STORM-554 (NL - text overlapping in Build tools)
<b>IMPEDIMENTS</b><br />
* none
 




Line 129: Line 96:


<b>January</b><br />
<b>January</b><br />
[[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]  
[[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]  


<b>2010</b><br />
<b>2010</b><br />

Revision as of 12:55, 10 January 2011


Monday, January 10, 2011

General Notes


  • Reminder to devs. If a ticket doesn't pass Review and is rejected, it will move back to the To Do column in GH, if you do more work or clarify questions, it should be moved back through In Progress and then to In Review.
  • MMOTD: Merov
  • PE was on holiday Friday.

Team Status


Merov Linden


PAST

  • STORM-526 : Log out failure during Login causes loss of pending offers, including inventory : Look at that code, can't repro but pointed at potential issues, commented in JIRA
  • Cleaned-up sprint 9 stuff

FUTURE

  • sprint planning
  • STORM-745 : Produce comprehensive perf baseline: Complete that work.

IMPEDIMENTS

  • None

Oz Linden


PAST

  • Merge Monkey (up to 2.5.0-start tag), handed off to Merov
  • More looking at old VWR patches
  • Tracking down viewer dependencies
  • OH

FUTURE

  • Sprint planning
  • More VWR mining

IMPEDIMENTS

  • none

Q Linden


PAST

  • LL Planning meeting
  • STORM-34
  • STORM-777
  • SOCIAL-437 / VWR-24440
  • STORM-830
  • Blog post

FUTURE

  • STORM-830
  • Sprint planning
  • Triage

IMPEDIMENTS

  • none

Esbee Linden


PAST

  • HR stuff
  • Meetings, Email
  • Wrote Viewer 2.5 Beta 1 blog post
  • Played with Beta

FUTURE

  • Meetings
  • Sprint Planning
  • Rev Viewer 2.5 Beta 1 Blog post
  • Review Snowstorm Team product backlog and bug log
  • PO reviews for open tickets
  • Finish going through the list of VWRs assigned to PE (finally)
  • Plan update for system requirements
  • Look at VWR-18435 and VWR-24357 for Jonathan
  • Add instructions for STORM-236 for Wolfpup
  • Look at STORM-383, -797, -28, -447

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • STORM-370 (Human-readable name of region disappears from Location Bar after pressing ESC)
    • Fixed and sent for review

FUTURE

  • STORM-387 (Part of the table is hidden after increasing firsts column width in the floater and then dock it to the SP)
  • STORM-554 (NL - text overlapping in Build tools)


Past Updates

January
06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16