Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 4: Line 4:


== Sprint 15, ends 05.16.11 ==
== Sprint 15, ends 05.16.11 ==
== Tuesday, April 26 ==
== Wednesday, April 27 ==


=== General Notes ===
=== General Notes ===
Line 14: Line 14:
===Team Status===
===Team Status===
----
----
==== Oz Linden ====
----
<b>PAST</b><br />
* Sprint Planning
* Contributor build farm work
* Assorted internal reviews
<b>FUTURE</b><br />
* More GPU table updates (STORM-1100)
<b>IMPEDIMENTS</b><br />
* 4 days in Las Vegas
==== Wolf Linden ====
==== Wolf Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Storm-2
* WLRS: revised specs
** sketched out workflow
** preliminary wireframes
** compiled list of all windows and associated functionality


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Wireframes
* will publish revision to stakeholders
* more work on windows
** will include an answer to Vadim's question
* will publish specs to OS devs next week


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 45: Line 30:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* sprint planning
* WLRS discussions
* triage
* jira cleanup
<b>FUTURE</b><br />
* triage
* crashhunters
* crashhunters
* meetings
* meetings
   
   
<b>FUTURE</b><br />
* VWR triage
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* reopened issues keep value for approvals.
* none


==== Paul ProductEngine ====
==== Paul ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* BUG STORM-951 (Accidental Self-Muting/Self-Blocking)
* Work on Windlight Region Settings.
** Fixed. After meeting will send for review.
** Working on UI (XML) part of the task according to the spec.
** While I was working on STORM-951 I was faced with problem which I wanted to solve within STORM-951. But it seems that it's not very trivial. It's not directly related to the STORM-951 so I will create JIRA issue for it after meeting.
** Creating floaters, menus, notification boxes, etc.
** Not committing until Jira tickets are created.
** Estimate: should finish this week.
   
   
<b>FUTURE</b><br />
<b>FUTURE</b><br />
Line 69: Line 54:
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Vadim ProductEngine ====
==== Vadim ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Investigated new WLRS spec and provided my feedback.
* Windlight Region Settings design meeting.
* Working on defining WLRS implementation tasks.
* Designing new WLRS implementation, defining technical subtasks by the way.
   
   
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Finish defining WLRS tasks.
* WLRS: Continue with defining technical subtasks and implementation design.
* Start implementing them.
* WLRS: Create JIRA tickets for XUI-related subtasks so that Paul can submit his work.
* Code review.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 86: Line 73:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* passed smoke & integrity tests for 2.6.3 RC r227447, see IQA-152 for more details
* picked up 2.6.6 Beta build for testing
* passed testing in scope of STORM-1028 on oz_viewer-poreview build
* smoke & integrity tests have been passed, although an intermittent crash on Linux has been found (VWR-25624). See IQA-147 for more details
* tested v-d integrated issues on the latest v-d build
* IQA-148 testing is in progress, there is a bunch of issues marked as Def because TPE cannot verify them
** 7 passed QA and 2 reopened
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* pickup 2.6.6 beta build
* pickup 2.6.6 RC for testing or latest v-d build for regression testing


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 100: Line 86:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Working inworld (this is part of testing localy built viewers).
* Working inworld(this is part of testing localy built viewers).
** Checking on horses and bundles, plus work on note cards for them.
** Checking on horses and bundles, plus work on note cards for them.
** Desiding on what type of build to work on next.
** Desiding on what type of build to work on next.
* OPEN-9 : still TBD.
* OPEN-9 : still TBD.
** This is marked ready for review.
* STORM-1182 : tested in my local dev environment and found this had been fixed for Windows 2 months ago so Vadim and Broondas's work is simply porting it to Mac and Linux


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Working inworld(this is part of testing localy built viewers).
* Working inworld(this is part of testing localy built viewers).
* STORM-1182 : create local repository for investigation for Windows since Linux and Mac have already been done.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Getting Autobuild system and seceurity software to play nicely on my system.
* Getting Autobuild system and seceurity software to play nicely on my system.
* Intermittent power issues with system (looks like will be having to replace the power supply).
 
 


= Past Updates =
= Past Updates =
<b>Aprli</b><br />
<b>Aprli</b><br />
[[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]  
[[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]  


<b>March</b><br />
<b>March</b><br />

Revision as of 00:23, 28 April 2011


Sprint 15, ends 05.16.11

Wednesday, April 27

General Notes


  • Sprint 15 will be 3 weeks to partially compensate for holidays and vacations
  • Seth vacation this week
  • Oz vacation Wed-Fri.

Team Status


Wolf Linden


PAST

  • WLRS: revised specs

FUTURE

  • will publish revision to stakeholders
    • will include an answer to Vadim's question
  • will publish specs to OS devs next week

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • WLRS discussions
  • crashhunters
  • meetings

FUTURE

  • VWR triage

IMPEDIMENTS

  • none

Paul ProductEngine


PAST

  • Work on Windlight Region Settings.
    • Working on UI (XML) part of the task according to the spec.
    • Creating floaters, menus, notification boxes, etc.
    • Not committing until Jira tickets are created.
    • Estimate: should finish this week.

FUTURE

  • Work on Windlight Region Settings.

IMPEDIMENTS

  • none


Vadim ProductEngine


PAST

  • Windlight Region Settings design meeting.
  • Designing new WLRS implementation, defining technical subtasks by the way.

FUTURE

  • WLRS: Continue with defining technical subtasks and implementation design.
  • WLRS: Create JIRA tickets for XUI-related subtasks so that Paul can submit his work.
  • Code review.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.6 Beta build for testing
  • smoke & integrity tests have been passed, although an intermittent crash on Linux has been found (VWR-25624). See IQA-147 for more details
  • IQA-148 testing is in progress, there is a bunch of issues marked as Def because TPE cannot verify them

FUTURE

  • pickup 2.6.6 RC for testing or latest v-d build for regression testing

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
    • Desiding on what type of build to work on next.
  • OPEN-9 : still TBD.
  • STORM-1182 : tested in my local dev environment and found this had been fixed for Windows 2 months ago so Vadim and Broondas's work is simply porting it to Mac and Linux

FUTURE

  • Working inworld(this is part of testing localy built viewers).

IMPEDIMENTS

  • Getting Autobuild system and seceurity software to play nicely on my system.


Past Updates

Aprli
26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16