Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Wednesday, February 2 ==
All Merge requests should contain links to jira closed in that merge. Otherwise QA cannot test.
 
== Thursday, February 3 ==


=== General Notes ===
=== General Notes ===
----
----
* Sprint 11 Theme - Customization
 
* Please do not pick up issues tagged with needs-design until the tag has been removed.
* Please do not pick up issues tagged with needs-design until the tag has been removed.
* MMOTD: Merov
* MMOTD: Merov
* Please remember to move issues to current Sprint when a) starting work on them or b) accepting issues from the community
* Please remember to move issues to current Sprint when a) starting work on them or b) accepting issues from the community
* Groundhog day!


===Team Status===
===Team Status===
Line 18: Line 19:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Meetings, meetings: sprint 11 planning, VWR triaging and OH all in one day...
* More SNOW triaging: only a dozen left to go...
* PO build: done
* Merge Monkeying: push fixes in both viewer-beta and viewer-development, PO build
* Merge Monkeying: cleaned up sprint 10 and previous
* STORM-864 : APR memory pool : finished code review, did a test build, plenty of issues. Rejected review. See JIRA for details.
* Triage SNOW JIRA
* Dig into Coverity findings


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* MM
* MM
* STORM-864 : APR memory pool : waiting on Aleric, suspecting some apr bundling issues on Linux and Windows
* STORM-955 : Massively duplicated objects : keep an eyes on this
* STORM-746 : KDU Improvements: Compress j2c with precincts
* STORM-746 : KDU Improvements: Compress j2c with precincts


Line 34: Line 35:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Meetings most of yesterday
* Created 'Open Development' jira project
* Other non-Snowstorm activities
* Non-Snowstorm activities
* Started discussions about open data APIs


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Try to fix using autobuild with VS Express
* Review autobuild changes from NickyP
* Document policies and test new jira project rules
* PO Review
* Internal Linden training session


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* snow, ice, snow, ice....
* none


==== Q Linden ====
==== Q Linden ====
Line 47: Line 52:
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-465
* STORM-465
* Coverity stuff
* Triage tooling attempt (which sadly failed, but i have ideas)
* triage
* OOO / Doctor
* lots of ad hoc meetings
* beta 3
* snow
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* more snow
* beta 3
* ooo doctor / pt
* internal training session
* triage bot
* OOO late today and all day tomorrow
* spend time with wolf but probably not 'til monday


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none, other than time


==== Grumpity ProductEngine ====
==== Grumpity ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Sprint planning
* prep for product tirage
* VWR triage
* a bit more jira cleanup
* Jira wrangling
* non-snowstorm stuff
** updated needs-design issues
** closed dupes of issues in current sprint
** moved issues accepted from community into current sprint


<b>FUTURE</b><br />
<b>FUTURE</b><br />
Line 75: Line 77:
** STORM-379, STORM-465
** STORM-379, STORM-465


<b>IMPEDIMENTS</b><br />  
<b>IMPEDIMENTS</b><br />
* moving
* we need more vwr triage - bug queue is getting empty
* sick


==== Paul ProductEngine====
==== Paul ProductEngine====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* BUG STORM-655 (mismatched filter extension in snapshot floater (jpeg vs jpg).)
** Fixed and sent for review.
* BUG STORM-680 (Avaline callers are added to the Recent list)
* BUG STORM-680 (Avaline callers are added to the Recent list)
** WIP. Estimate ~ 6-8 hours.
** WIP. 90%. Estimate 2 hours. Implementing the solution.  


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* BUG STORM-680 (Avaline callers are added to the Recent list)
* Finish with BUG STORM-680 (Avaline callers are added to the Recent list)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* Today's progress is not very good because of headache. Today will go home a little bit earlier, feel bad.


==== Seth Productengine ====
==== Seth Productengine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* BUG (STORM-379) Content permissions aren't refreshed in the "Buy copy of" floater.
* BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text
** Investigating possible fix with updating "Buy copy of" floater each time it is shown.
** Found that reshaping text editor with a friendship offer fixes its placement. Still looking for more precise reason of the problem


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text
* BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text
** Estimated: 8-10 hours.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 109: Line 109:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-2 (Customizable viewer layouts):
* Looked through high impact issues (in code familiar to me) from the recent Coverity report.
** Implementing saving sidetray state. ETA: 1d.
** Haven't found anything dangerous (and even if I had found something, I don't know the process to handle such issues).
* Sprint planning meeting.
* Story STORM-2 (Customizable viewer layouts):
** Working on saving sidebar state. Stuck with handling minimization.
** I remember Andrew mentioning a bug in LLFloaterReg which may cause it to misbehave. Will try consulting with him tomorrow.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Continue with STORM-2.
* Will work on STORM-2 at least till the end of week.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* STORM-465 (Missing Strings from strings.xml):
* none
**
Waiting for Q to provide code-related feedback.


==== Andrey ProductEngine ====
==== Andrey ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* picked up 2.5.0 Beta3 r220094 build
* picked up Beta3 build#2 (r220251)
* smoke tests have been passed on Linux, OSX, and Windows, refer to the spreadsheet
* executed smoke and integrity tests on Windows, Linux and OSX. See IQA-80 for more details.
* integrity test has been failed by VWR-24681, but I think this is some kind of a server-side issue
** smoke on Linux has been failed but it looks like specific environment issue (?)
* 2.5.0 bug-fixes verification almost has been completed, refer to spreadsheet
* proceeded with v-d regression testing, see spreadsheet  
** 87 tickets marked as "Deferred" because TPE has no clue how to verify those
* reported 2 issues: VWR-24714 and VWR-24715
* reported 4 tickets
 
* picked up v-d 220024 build
** verified 3 issues
** proceeded with regression testing of v-d branch
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* proceed with regression testing of v-d build
* investigate VWR-24714
* verify integrated STORM tickets against the latest v-d build <b>FUTURE</b><br />


<b>IMPEDIMENTS</b><br />  
<b>IMPEDIMENTS</b><br />  
* none
* none


==== Wolfpup Lowenhar ====
==== Wolfpup Lowenhar ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Worked @ RL .
* Worked @ RL .
* STORM-236 : read Oz's comments on JIRA
* STORM-236 : began debuging issue with button layout resized issues.
** emailed Oz with comments concerning suggestions and what it could entail to get suggested capability in the context menu for the bottom tray and the other issues in the rest of the comment.
  Also discussed this with Oz in IRC.  
* STORM-941 : Began looking in code for possible places where the issue could be happening.
<b>FUTURE</b><br />
* Attended SnowStorm OH which ended up being canceled due to weather in Boston
 
<b>FUTURE</b><br />
* Work @ RL
* Work @ RL
* STORM-941 : email Oz and Leyla concerning possible areas that could be causing the problem.
* STORM-941 : email Oz and Leyla concering posible areas that could be causeing the problem.


<b>IMPEDIMENTS</b><br />  
<b>IMPEDIMENTS</b><br />  
* STORM-236 : waiting for new graphics and name to call the panel.
* STORM-236 : waiting for new graphics and name to call the panel.
* Not enough time to actually work on code.
* Not enough time to actually work on code.
* Computer repair Client that dose not know what non repairable means and keeps trying to have me fix a unit that is beyond repair.


====Jonathan Yap====
====Jonathan Yap====
Line 174: Line 169:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* jira work
*jira stuff
* blog post to lindenwatch
*lots of office hours
*getting in trouble ><
*testing correct po build


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* office hours
*new blog posts
* jira work
*not totally sure
* working on sl store


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* time
* time


== Past Updates ==
== Past Updates ==
<b>February</b><br />
<b>February</b><br />
[[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |
[[Snowstorm_Daily_Scrum_Archive/02022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |


<b>January</b><br />
<b>January</b><br />

Revision as of 02:18, 4 February 2011


All Merge requests should contain links to jira closed in that merge. Otherwise QA cannot test.

Thursday, February 3

General Notes


  • Please do not pick up issues tagged with needs-design until the tag has been removed.
  • MMOTD: Merov
  • Please remember to move issues to current Sprint when a) starting work on them or b) accepting issues from the community

Team Status


Merov Linden


PAST

  • More SNOW triaging: only a dozen left to go...
  • Merge Monkeying: push fixes in both viewer-beta and viewer-development, PO build
  • STORM-864 : APR memory pool : finished code review, did a test build, plenty of issues. Rejected review. See JIRA for details.

FUTURE

  • MM
  • STORM-864 : APR memory pool : waiting on Aleric, suspecting some apr bundling issues on Linux and Windows
  • STORM-955 : Massively duplicated objects : keep an eyes on this
  • STORM-746 : KDU Improvements: Compress j2c with precincts

IMPEDIMENTS

  • none

Oz Linden


PAST

  • Created 'Open Development' jira project
  • Non-Snowstorm activities
  • Started discussions about open data APIs

FUTURE

  • Review autobuild changes from NickyP
  • Document policies and test new jira project rules
  • PO Review
  • Internal Linden training session

IMPEDIMENTS

  • none

Q Linden


PAST

  • STORM-465
  • Triage tooling attempt (which sadly failed, but i have ideas)
  • OOO / Doctor
  • beta 3

FUTURE

  • beta 3
  • internal training session
  • OOO late today and all day tomorrow
  • spend time with wolf but probably not 'til monday

IMPEDIMENTS

  • none, other than time

Grumpity ProductEngine


PAST

  • prep for product tirage
  • a bit more jira cleanup
  • non-snowstorm stuff

FUTURE

  • PEQA deferred issues triage with Bambers
  • continue to prod others to resolve impediments
    • STORM-379, STORM-465

IMPEDIMENTS

  • we need more vwr triage - bug queue is getting empty

Paul ProductEngine


PAST

  • BUG STORM-680 (Avaline callers are added to the Recent list)
    • WIP. 90%. Estimate 2 hours. Implementing the solution.

FUTURE

  • Finish with BUG STORM-680 (Avaline callers are added to the Recent list)

IMPEDIMENTS

  • Today's progress is not very good because of headache. Today will go home a little bit earlier, feel bad.

Seth Productengine


PAST

  • BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text
    • Found that reshaping text editor with a friendship offer fixes its placement. Still looking for more precise reason of the problem

FUTURE

  • BUG (STORM-433) Friendship offer shifted up and placed over "Second Life" text
    • Estimated: 8-10 hours.

IMPEDIMENTS

  • BUG (STORM-379) Content permissions aren't refreshed in the "Buy copy of" floater.
    • Asked in JIRA whether the bug should be fixed in a way that may increase server load.

Vadim Productengine


PAST

  • Looked through high impact issues (in code familiar to me) from the recent Coverity report.
    • Haven't found anything dangerous (and even if I had found something, I don't know the process to handle such issues).
  • Story STORM-2 (Customizable viewer layouts):
    • Working on saving sidebar state. Stuck with handling minimization.
    • I remember Andrew mentioning a bug in LLFloaterReg which may cause it to misbehave. Will try consulting with him tomorrow.

FUTURE

  • Will work on STORM-2 at least till the end of week.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up Beta3 build#2 (r220251)
  • executed smoke and integrity tests on Windows, Linux and OSX. See IQA-80 for more details.
    • smoke on Linux has been failed but it looks like specific environment issue (?)
  • proceeded with v-d regression testing, see spreadsheet
  • reported 2 issues: VWR-24714 and VWR-24715

FUTURE

  • investigate VWR-24714
  • verify integrated STORM tickets against the latest v-d build FUTURE

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

* Worked @ RL .
* STORM-236 : began debuging issue with button layout resized issues.
 Also discussed this with Oz in IRC. 
FUTURE
  • Work @ RL
  • STORM-941 : email Oz and Leyla concering posible areas that could be causeing the problem.

IMPEDIMENTS

  • STORM-236 : waiting for new graphics and name to call the panel.
  • Not enough time to actually work on code.
  • Computer repair Client that dose not know what non repairable means and keeps trying to have me fix a unit that is beyond repair.

Jonathan Yap


PAST

  • VWR-24628 (Descriptive text missing next to first checkbox in About Land/Access)
    • This had to be fixed first in order to work on Storm - 953. 4 other people helped with this! This was my proudest moment as a developer. Great team effort. Easy fix but caused by low-level routine change.
  • STORM-953 (Clarify what happens when you uncheck Allow Public Access)

FUTURE

IMPEDIMENTS

  • VWR - 24628 needs to be pulled in to Storm-nnnn
  • Waiting for Oz to Storm-nnnn-ize my bug list.

Cummere Mayo


PAST

*jira stuff
*lots of office hours
*getting in trouble ><
*testing correct po build

FUTURE

*new blog posts
*not totally sure

IMPEDIMENTS

  • time


Past Updates

February
02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16