Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
 
(152 intermediate revisions by the same user not shown)
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Tuesday, January 11, 2011  ==
== Sprint 16, ends 05.31.11 ==
 
== Wednesday, May 18 ==
=== General Notes ===
----
* Reminder to devs. If a ticket doesn't pass Review and is rejected, it will move back to the To Do column in GH, if you do more work or clarify questions, it should be moved back through In Progress and then to In Review.
* MMOTD: Merov, who loves alliteration and tongue twisters.
* Today is Andrew's last day on Snowstorm.  Thank you for all your hard work, Andrew!


===Team Status===
===Team Status===
----
----
==== Merov Linden====
==== Oz Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Sprint planning
* Much merging
* MM beta: STORM-840 : crash in profile opening : integrated callum's fix
* Assorted repairs to mesh branch merge
* MM dev: STORM-807 : encroachement rules : code review, minor changes requested and done, test plan with Andrew, integrated
* Reviewing Windlight builds
* Massive cleanup in the tangle of repos I let accumulate...


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Merge Monkeying
* Submit storm-1100
* STORM-745 : Produce comprehensive perf baseline: Complete that work. I mean it!
* Start on storm-1265
 
<b>IMPEDIMENTS</b><br />
* None
 
====Oz Linden====
----
<b>PAST</b><br />
* Sprint planning
* Scrum Training
 
<b>FUTURE</b><br />
* Scrum Training
* Mining VWR Patches


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Q Linden====
==== Wolf Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-830
* STORM-823
* Blog post
* Sprint planning
* Planning / documentation for my boss
* STORM-477
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Triage
* Working on getting an answer for Storm-565


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Esbee Linden====
==== Grumpity ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Meetings, Email
* crashhunters
* Sprint planning
* sprint cleanup
* Revisions to Viewer 2.5 Beta 1 blog post
* some triage
* Tested and verified SOCIAL-437
* Pulled VWR-23712 into STORM-843 (Assigned to Jonathan)
* Closed STORM-26 (Completed this task in sprint 9) and it just needed to be moved through swim lanes
* Closed STORM-31 (Completed in Sprint 9) and needed to be moved through swim lanes
* Looked at STORM-383 - Still repros. Added a comment about how we might fix and close this ticket.
* Reviewed STORM-797 again. Pasting secondlife:///app/parcel/0b73f0b4-da58-a5d0-5434-3fd92d0958ff/about into nearby chat still doesn't work for me.
* Closed STORM-447 as expected behavior.
* Added decision info to STORM-236 for Wolfpup
* Closed VWR-24357 as a dupe of VWR-23710. Moved that ticket to STORM-844, added to Sprint 10 and assigned to Jonathan.
* Took in VWR-18435 (now STORM-845) and assigned to Jonathan.
* Finish reviewing tickets assigned to PE
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Meetings
* crashhunters cleanup
* Finish Wiki dashboard for Product Council
* VWR triage
* Internal documentation
* STORM-951
* Ask Merov for a developer build so I can review the 14 tickets in my PO review queue - https://jira.secondlife.com/secure/IssueNavigator.jspa?requestId=13662&mode=hide
* PO build
* Possible revisions Viewer 2.5 Beta 1 Blog post
* reports
* Review Snowstorm Team product backlog and bug log
* PO reviews for open tickets
* Review Jira for tickets assigned to Aimee or Moss and make some decisions about where those tickets should go :(
* Plan update for system requirements
* Come up with design for STORM-28 (Might pass this to XD)
 
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Paul ProductEngine====
==== Vadim ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* BUG STORM-387 (Part of the table is hidden after increasing firsts column width in the floater and then dock it to the SP)
* Reported a crash in viewer-development.
** Investigated and resolved that my previous fix was correct. Wrote proper test plan for ticket in comment and sent for review again.
* Manual merge from viewer-development to the WLRS integration branch.
* BUG STORM-554 (NL - text overlapping in Build tools)
* WLRS repo Windows build issues: fixed one and handed another over to Paul.
** Resolved as cannot reproduce.
* Task STORM-1256 (Region environment settings editor):
* BUG STORM-429 (Additional scroll appears for undocked tab that was re-sized to min height and width )
** WIP. Investigating time synchronization between viewer and region.
** Investigated. One of the problems lays out of PE's scope. Asked to fix it before i begin to fix the rest.
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* BUG STORM-832 (Two Roles are selected after made changes in one.)
* Continue with STORM-1256.
 
<b>IMPEDIMENTS</b><br />
* Waiting for answer in STORM-429 before i begin to fix it.
 
 
==== Seth Productengine ====
----
<b>PAST</b><br />
* TASK (STORM-797) Parcel SLURL rendering
** Re-tested fix, updated test case.
* TASK (STORM-477) Re-implement LLDir::getNextFileInDir() as an iterator object
** WIP. Working on replacing old dir iterator implementation with the new one across the viewer code.
 
<b>FUTURE</b><br />
* TASK (STORM-477) Re-implement LLDir::getNextFileInDir() as an iterator object
 
<b>IMPEDIMENTS</b><br />
* TASK (STORM-797) Parcel SLURL rendering
* BUG (STORM-447) User is not able to share multi selected objects using drag&drop
 
==== Andrew Productengine ====
----
<b>PAST</b><br />
* Normal task STORM-2 (Customizable viewer layouts).
**  Fixed problems mentioned last week. Feature is working now.
** Fixed problems found yesterday (performance issues on first save) and during testing.  Cleaned up code and added commends. Will put on review in the morning.
 
<b>FUTURE</b><br />
* Normal task STORM-2.
** Put on review.
 
<b>IMPEDIMENTS</b><br />
* will be on another project starting tomorrow
 
==== Vadim Productengine ====
----
 
<b>PAST</b><br />
* Bug STORM-720 (URL-name of object is shown as hyperlink in Share confirmation window):

** Fixed.
* Bug STORM-594 (Crash in LLView::handleVisibilityChange):
** Trying to find potential problems causing the crash.
 
<b>FUTURE</b><br />
* Bug STORM-715 (Clothing accordion is expanded after undocking My Appearance SP).
* Bug STORM-594 (Crash in LLView::handleVisibilityChange).
* Bug STORM-243 (Suppress version change message in the viewer).
 
<b>IMPEDIMENTS</b><br />
* Unclear what to do with STORM-702 (Make it possible to wear partial outfits).
* No clear acceptance criteria for STORM-226 (Floating Text aligns improperly). Not sure whether I should spend any more time on it if it's unclear what the fix should do.
 
 
==== Andrey Productengine ====
----
<b>PAST</b><br />
* picked up 2.5.0 Beta1 r218601 build
* performed smoke & integrity tests against beta build
** smoke test has been failed by VWR-24439 and VWR-24440
* started 2.5.0 Beta1 bug-fix verification
 
<b>FUTURE</b><br />
* pickup new one Beta1 build and re-run smoke tests(?)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Jonathan Yap ====
==== Andrey ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-723 was waiting for now-finished STORM-812, so I hope it appears on someone's radar screen
* picked up 2.6.9 beta build r230161
for processing/action.
* verified yestarday's blockers - crash and help unavailability
* passed smoke & integrity tests, refer to the IQA-164 for more details
* tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* pickup latest v-d build?


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
Line 183: Line 80:
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Worked @ RL and in world.
* Working inworld(this is part of testing localy built viewers).
* Upgraded personal system thx to inworld friend( added 2GB system memory now local builds take 1hr 50 min to compleate).
** Checking on horses and bundles, plus work on note cards for them.
* Deciding on what type of build to work on next.
* Run a Test build of Brad's must build faster Repository as a test on local system.
** Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
* Local build after mesh code merge crashes on start.
** This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
** also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* STORM-236 : make shure repositories are up to date so can begin working.
* Working inworld(this is part of testing localy built viewers).
* Attend Merov's OH later today.
* Wait for crash on error to be fixed.
* Work @ RL and in world.
* continue to monitor VWR-24256 .
* Check Bug Queue : viewer-development some more.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Not enough time between working in-world and at real job to actually work on code.
* Getting Autobuild system and security software to play nicely on my system.
* Right Hand(it is slowly healing but will take time since it is the tip of middle finger.)


==== Cummere Mayo ====
= Past Updates =
----
<b>May</b><br />
<b>PAST</b><br />
[[Snowstorm_Daily_Scrum_Archive/05172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/05162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/05132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/05122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/05112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/05052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/05042011 | 04]]
* viewer testing
* investigating bug with storm-34
* sorting and closing out or updating several snowglobe 1.x issues


<b>FUTURE</b><br />
<b>April</b><br />
* more of the same
[[Snowstorm_Daily_Scrum_Archive/04272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]
* need to get with merov to figure out which globe issues were cloned to storm that can be closed


<b>IMPEDIMENTS</b><br />
<b>March</b><br />
* none
[[Snowstorm_Daily_Scrum_Archive/03312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/03302011 | 30]] | [[Snowstorm_Daily_Scrum_Archive/03292011 | 29]] | [[Snowstorm_Daily_Scrum_Archive/03192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/03182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/03172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/03162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/03152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/03142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/03112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/03102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/03092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/03082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/03072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/03042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/03032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/03022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/03012011 | 01]]


== Past Updates ==
<b>February</b><br />
[[Snowstorm_Daily_Scrum_Archive/02282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/02252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/02242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/02232011 | 23]] | [[Snowstorm_Daily_Scrum_Archive/02222011 | 22]] | [[Snowstorm_Daily_Scrum_Archive/02182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/02162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/02152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/02142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/02112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/02102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/02092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/02082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/02072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/02042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/02032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/02022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |


<b>January</b><br />
<b>January</b><br />
[[Snowstorm_Daily_Scrum_Archive/01102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]  
[[Snowstorm_Daily_Scrum_Archive/01312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/01282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/01272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/01262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/01252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/01242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/01212011 | 21]] | [[Snowstorm_Daily_Scrum_Archive/01202011 | 20]] | [[Snowstorm_Daily_Scrum_Archive/01192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/01182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/01142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/01132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/01122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/01112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/01102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]  


<b>2010</b><br />
<b>2010</b><br />

Latest revision as of 02:23, 19 May 2011


Sprint 16, ends 05.31.11

Wednesday, May 18

Team Status


Oz Linden


PAST

  • Much merging
  • Assorted repairs to mesh branch merge
  • Reviewing Windlight builds

FUTURE

  • Submit storm-1100
  • Start on storm-1265

IMPEDIMENTS

  • none

Wolf Linden


PAST
FUTURE

  • Working on getting an answer for Storm-565

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunters
  • sprint cleanup
  • some triage

FUTURE

  • crashhunters cleanup
  • VWR triage
  • STORM-951
  • PO build
  • reports

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Reported a crash in viewer-development.
  • Manual merge from viewer-development to the WLRS integration branch.
  • WLRS repo Windows build issues: fixed one and handed another over to Paul.
  • Task STORM-1256 (Region environment settings editor):
    • WIP. Investigating time synchronization between viewer and region.

FUTURE

  • Continue with STORM-1256.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.9 beta build r230161
  • verified yestarday's blockers - crash and help unavailability
  • passed smoke & integrity tests, refer to the IQA-164 for more details
  • tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin

FUTURE

  • pickup latest v-d build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
  • Deciding on what type of build to work on next.
  • Run a Test build of Brad's must build faster Repository as a test on local system.
    • Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
  • Local build after mesh code merge crashes on start.
    • This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
    • also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .

FUTURE

  • Working inworld(this is part of testing localy built viewers).
  • Wait for crash on error to be fixed.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.

Past Updates

May
17 | 16 | 13 | 12 | 11 | 05 | 04

April
27 | 26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16