Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
 
(294 intermediate revisions by 3 users not shown)
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Friday, September 3, 2010 ==
== Sprint 16, ends 05.31.11 ==
 
== Wednesday, May 18 ==
=== General Notes ===
----
* Don't forget to grab tasks from the Sprint Backlog and update your time remaining on that task each day!
* Merge Monkey of the Day: Merov


===Team Status===
===Team Status===
----
----
 
==== Oz Linden ====
====Aimee====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* "As a developer, I would like to clean up the way the voice code shuts down, so that it doesn't leak memory and satifies my OCD".
* Much merging
* Work out what's gone wrong with the hg convert process on james/viewer-identity-evolution
* Assorted repairs to mesh branch merge
* Hairy merge of james/viewer-identity-evolution with dessie/viewer-public to fix it.
* Reviewing Windlight builds


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Continue hairy merge of james/viewer-identity-evolution with dessie/viewer-public and hg convert.
* Submit storm-1100
* Start on storm-1265


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Will need a yes/no to integrate from design review of VWR-21253 before I can move onto that task, other stuff I can do for now though.
* none


 
==== Wolf Linden ====
====Tofu====
----
OOO
 
====Oz====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Sent code review system request to systems team
* Prepped discussion of upcoming common code split
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Post first Development build on secondlife.com ?
* Working on getting an answer for Storm-565


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none not planned for
* none


====Merov====
==== Grumpity ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* VWR-22761 : LLKDU upgrade:
* crashhunters
** Perf data instrumentation: created baseline using LLFastTimer but not enough info in there. Need to improve that system or go for a quick and dirty hack...
* sprint cleanup
** Created forked repos for indra-private and discussed with Alain. Newest Alain's code though doesn't build :(
* some triage
** Created forked merov_linden/viewer-development-vwr-22761 for this feature ('cause I'm gonna touch lots of things...)
* Merge monkey: nothing to do 'cause Tofu stole all my toys...
* Snowglobe OH
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* VWR-22761 : LLKDU upgrade: Modify LLFastTimer to allow "datasize" in and out tracking
* crashhunters cleanup
 
* VWR triage
* STORM-951
* PO build
* reports
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Kakadu license upgrade
* none


====Q====
==== Vadim ProductEngine ====
----
OOO
 
====Esbee====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Out half day yesterday
* Reported a crash in viewer-development.
* Great interview with Dusan Writer
* Manual merge from viewer-development to the WLRS integration branch.
* Met about Jira triage
* WLRS repo Windows build issues: fixed one and handed another over to Paul.
* Started documenting how Jira VWR triage will work
* Task STORM-1256 (Region environment settings editor):
 
** WIP. Investigating time synchronization between viewer and region.
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Follow up on VWR-21253
* Continue with STORM-1256.
* Respond to Resident Viewer ideas
* Groom backlog
* Finish blog post about Product and Snowstorm
* Edit Q's blog post


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* none


====Paul====
==== Andrey ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* TASK VWR-21585 (Make all tabs support horizontal resizing)
* picked up 2.6.9 beta build r230161
**In progress. Estimate ~ 20 hours.
* verified yestarday's blockers - crash and help unavailability
* passed smoke & integrity tests, refer to the IQA-164 for more details
* tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* TASK VWR-21585 (Make all tabs support horizontal resizing)
* pickup latest v-d build?


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*none
* none


====Andrew====
==== Wolfpup Lowenhar ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Task VWR-20702 (Bottom bar button reordering):
* Working inworld(this is part of testing localy built viewers).
** Sub-task VWR-20705 (Drag&Drop implementation): Done, will commit shortly.
** Checking on horses and bundles, plus work on note cards for them.
** Sub-task VWR-20706 (Make sure auto-hiding and shrinking buttons still work): Done, will commit shortly.
* Deciding on what type of build to work on next.
** Sub-task VWR-22690(Saving/restoring button order). Investigated. Estimate: 5 hours.
* Run a Test build of Brad's must build faster Repository as a test on local system.
** Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
* Local build after mesh code merge crashes on start.
** This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
** also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Finish and send for review VWR-20705 (Drag & Drop implementation) and VWR-20706 (Make sure auto-hiding and shrinking buttons still work).
* Working inworld(this is part of testing localy built viewers).
* VWR-22690 (Saving/restoring button order).
* Wait for crash on error to be fixed.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* Getting Autobuild system and security software to play nicely on my system.
 
= Past Updates =
<b>May</b><br />
[[Snowstorm_Daily_Scrum_Archive/05172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/05162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/05132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/05122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/05112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/05052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/05042011 | 04]]
 
<b>April</b><br />
[[Snowstorm_Daily_Scrum_Archive/04272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]
 
<b>March</b><br />
[[Snowstorm_Daily_Scrum_Archive/03312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/03302011 | 30]] | [[Snowstorm_Daily_Scrum_Archive/03292011 | 29]] | [[Snowstorm_Daily_Scrum_Archive/03192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/03182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/03172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/03162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/03152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/03142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/03112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/03102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/03092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/03082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/03072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/03042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/03032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/03022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/03012011 | 01]]


====Vadim====
<b>February</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/02282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/02252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/02242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/02232011 | 23]] | [[Snowstorm_Daily_Scrum_Archive/02222011 | 22]] | [[Snowstorm_Daily_Scrum_Archive/02182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/02162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/02152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/02142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/02112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/02102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/02092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/02082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/02072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/02042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/02032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/02022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |
<b>PAST</b><br />
* Task VWR-21127 (Implement saving size and position of detached tabs): Done.
 
<b>FUTURE</b><br />
* Help Paul with VWR-21585, approve integrating the whole feature (although most was done today by Tofu)
<b>IMPEDIMENTS</b><br />
* none


====Sergey====
<b>January</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/01312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/01282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/01272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/01262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/01252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/01242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/01212011 | 21]] | [[Snowstorm_Daily_Scrum_Archive/01202011 | 20]] | [[Snowstorm_Daily_Scrum_Archive/01192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/01182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/01142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/01132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/01122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/01112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/01102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]
<b>PAST</b><br />
* Task (VWR-21060) Fix broken ability to open a side tray tab via shortcut, menu item or button outside of the Side Tray.
** Completed. But later found more bugs, fixing them now.
* Task (VWR-20696) Write code to allow for undocking/redocking of a sidebar tab: Done.
* Task (VWR-20970) Implement undocking tabs by dragging: Done.


<b>FUTURE</b><br />
<b>2010</b><br />
* Task (VWR-21060) Fix broken ability to open a side tray tab via shortcut, menu item or button outside of the Side Tray.
<b>December</b><br />
** Fix recently discovered bugs.
[[Snowstorm_Daily_Scrum_Archive/12302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/12232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/12222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/12212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/12202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/12172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/12162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/12152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/12142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/12132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/12102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/12092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/12082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/12072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/12062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/12032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/12022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/12012010 | 01]]


<b>IMPEDIMENTS</b><br />
<b>November</b><br />  
* Do we need a new art for "Undock" button in Side Tray. For now I used the existing floater "Tear Off" button.
[[Snowstorm_Daily_Scrum_Archive/11302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/11292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/11242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/11232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/11222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/11192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/11182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/11172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/11162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/11152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/11122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/11112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/11102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/11092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/11082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/11052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/11042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/11032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/11022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/11012010 | 01]]
* Task (VWR-20697) Write code to allow for redocking of a sidebar tab


====Anya====
<b>October</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/10292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/10282010 | 28]] | [[Snowstorm_Daily_Scrum_Archive/10272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/10262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/10252010 | 25]] | [[Snowstorm_Daily_Scrum_Archive/10222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/10212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/10202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/10182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/10152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/10142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/10132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/10122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/10112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/10082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/10072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/10062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/10052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/10042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/10012010 | 01]]
OOO


<b>September</b><br />
[[Snowstorm_Daily_Scrum_Archive/09272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/09242010 | 24]] |
[[Snowstorm_Daily_Scrum_Archive/09212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/09202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/09172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/09162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/09152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/09142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/09132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/09092010 | 09]] | 
[[Snowstorm_Daily_Scrum_Archive/09082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/09072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/09032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/09022010 | 02]] |
[[Snowstorm_Daily_Scrum_Archive/09012010 | 01]]


== Past Updates ==
<b>August</b><br />
* [[Snowstorm_Daily_Scrum_Archive/09022010 | Thursday, September 2, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/08262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/08252010 | 25]] |
* [[Snowstorm_Daily_Scrum_Archive/09012010 | Wednesday, September 1, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/08232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/08202010 | 20]] |
* Tuesday, August 31, 2010 - <i>No Daily Scrum, Sprint 2 Retrospective & Sprint 3 Planning Meetings took place</i>
[[Snowstorm_Daily_Scrum_Archive/08192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/08182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/08162010 | 16]]
* [[Snowstorm_Daily_Scrum_Archive/08302010 | Monday, August 30, 2010]]
* Friday, August 27, 2010 - <i>No Daily Scrum, Sprint 2 Review took place</i>
* [[Snowstorm_Daily_Scrum_Archive/08262010 | Thursday, August 26, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08252010 | Wednesday, August 25, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08242010 | Tuesday, August 24, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08232010 | Monday, August 23, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08202010 | Friday, August 20, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08192010 | Thursday, August 19, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08182010 | Wednesday, August 18, 2010]]
* Tuesday, August 17, 2010 - <i>No Daily Scrum, Sprint 2 Planning took place</i>
* [[Snowstorm_Daily_Scrum_Archive/08162010 | Monday, August 16, 2010]]

Latest revision as of 01:23, 19 May 2011


Sprint 16, ends 05.31.11

Wednesday, May 18

Team Status


Oz Linden


PAST

  • Much merging
  • Assorted repairs to mesh branch merge
  • Reviewing Windlight builds

FUTURE

  • Submit storm-1100
  • Start on storm-1265

IMPEDIMENTS

  • none

Wolf Linden


PAST
FUTURE

  • Working on getting an answer for Storm-565

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunters
  • sprint cleanup
  • some triage

FUTURE

  • crashhunters cleanup
  • VWR triage
  • STORM-951
  • PO build
  • reports

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Reported a crash in viewer-development.
  • Manual merge from viewer-development to the WLRS integration branch.
  • WLRS repo Windows build issues: fixed one and handed another over to Paul.
  • Task STORM-1256 (Region environment settings editor):
    • WIP. Investigating time synchronization between viewer and region.

FUTURE

  • Continue with STORM-1256.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.9 beta build r230161
  • verified yestarday's blockers - crash and help unavailability
  • passed smoke & integrity tests, refer to the IQA-164 for more details
  • tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin

FUTURE

  • pickup latest v-d build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
  • Deciding on what type of build to work on next.
  • Run a Test build of Brad's must build faster Repository as a test on local system.
    • Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
  • Local build after mesh code merge crashes on start.
    • This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
    • also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .

FUTURE

  • Working inworld(this is part of testing localy built viewers).
  • Wait for crash on error to be fixed.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.

Past Updates

May
17 | 16 | 13 | 12 | 11 | 05 | 04

April
27 | 26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16