Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
 
(308 intermediate revisions by 4 users not shown)
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Wednesday, August 25, 2010 ==
== Sprint 16, ends 05.31.11 ==
 
== Wednesday, May 18 ==
=== General Notes ===
----
* New weekly office hour to be set up for Product Backlog and idea discussion starts today 2 8-9am PT at http://maps.secondlife.com/secondlife/Hippotropolis/201/115/21
 


===Team Status===
===Team Status===
----
----
 
==== Oz Linden ====
====Aimee====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Repo and build shuffling, created a Project-Viewer-Builds project on TeamCity to separate them out from the Release-Viewer-Builds project.
* Much merging
* Updated BuildParams to use CG's new build_debug_release_separately flag..
* Assorted repairs to mesh branch merge
* Pulled EXT-8300 / EXT-8398 (Avatar icons displaced from SLURL profile links) fix into viewer-development.
* Reviewing Windlight builds
* Rebased EXT-1579 and EXT-8248 work into a new viewer-development-tweaks repo for my experimental stuff.
* Double-checked with Tofu for any new files to be added to the map for converting viewer-public.


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Double-click teleport.
* Submit storm-1100
* Get back to importing Snowglobe build fixes
* Start on storm-1265
* Check with CG about renaming TeamCity projects to Viewer-Release-Builds, and Viewer-Project-Builds so that they sort together in the project list. May also need Viewer-Aimee's-Builds as I seem to be accumulating enough for my own project :)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* none
 


====Tofu====
==== Wolf Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Converted viewer-public to new repo format
** Ready to merge to viewer-development if there are no objections (this
is stuff that was aimed at Viewer 2.2, it was already mostly in
Snowglobe 2.1)
* Other tree juggling
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Really do the merge of viewer-public to viewer-development
* Working on getting an answer for Storm-565
* Find things to review (is there a neat process for actually finding
things to review?)
* Catch-up on opensource-dev


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none (just sickness!)
* none


 
==== Grumpity ProductEngine ====
====Oz====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* essentially no Snowstorm work yesterday
* crashhunters
 
* sprint cleanup
* some triage
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* update patch from Thickbrick for texture alignment, get it reviewed.
* crashhunters cleanup
* get archive of my last Office Hour posted
* VWR triage
* todays Office Hour
* STORM-951
 
* PO build
* reports
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Non-Snowstorm tasks (no help for it)
* none
 


==== Merov ====
==== Vadim ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* LLKDU in viewer-development: Modified llkdu.cmake and install.xml to use the prebuilt binaries for each platform. Suppress the dependency on exisiting llkdu subfolder in the build environment. Modified viewer_manifest.py and newview/CMakeListst.txt to support this idea. Local builds: success. TeamCity builds: success! W00t!!!
* Reported a crash in viewer-development.
* Add "Sit" to the "pie" menu: Pick up the SG 2.1 patch (VWR-20709) : done
* Manual merge from viewer-development to the WLRS integration branch.
* Add "Sit" to the "pie" menu: Merge and test patch (VWR-20710): done
* WLRS repo Windows build issues: fixed one and handed another over to Paul.
 
* Task STORM-1256 (Region environment settings editor):
** WIP. Investigating time synchronization between viewer and region.
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* LLKDU in viewer-development: review, test so it gets pulled to viewer-development
* Continue with STORM-1256.
* Add "Sit" to the "pie" menu: Design review (VWR-20711)
* Add "Sit" to the "pie" menu: Test the ability to sit "anywhere" (VWR-20712)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* none
 
 
==== Q ====
----
<i>OOO</i>
 


==== Esbee ====
==== Andrey ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Discuss sidebar undocking and more UI ideas with Rhett
* picked up 2.6.9 beta build r230161
* Set up weekly office hours to discuss product backlog and ideas
* verified yestarday's blockers - crash and help unavailability
* Continued gathering Resident feedback from blog and email
* passed smoke & integrity tests, refer to the IQA-164 for more details
* tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Hold first Product Backlog & Idea OH
* pickup latest v-d build?
* Finally get Resident ideas and feedback into the backlog
* Document idea submission process
* Review texture alignment build for Oz
* Review Tofu's list of changes from Snowglobe


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* none
 


==== Paul ====
==== Wolfpup Lowenhar ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*BUG EXT-8362 ([TRUNCATION] IT login screen - truncation in location box)
* Working inworld(this is part of testing localy built viewers).
**Pushed
** Checking on horses and bundles, plus work on note cards for them.
*  BUG EXT-8672 ([HARD CODED] ALL LANGS The word "Saved" is hard coded, in  the long timestamp displayed in IM when user is offline)
* Deciding on what type of build to work on next.
**Pushed
* Run a Test build of Brad's must build faster Repository as a test on local system.
*BUG EXT-7878 (Corrupted vertical scroll bar appears on 'Edit Outfit' panel if height of 'Add More' panel was changed)
** Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
**Pushed
* Local build after mesh code merge crashes on start.
*BUG EXT-7951 (Mini-Location panel appearance design issues)
** This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
**Restored in viewer-development repository.
** also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .
*BUG EXT-8558 (Add More category picker defaults whenever a clothing item is removed)
**Fixed and sent for a review


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* EXT-8722 (Appearance > 'Wearing' tab: Add Take off / Detach function  to the gear menu)
* Working inworld(this is part of testing localy built viewers).
* Wait for crash on error to be fixed.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*none
* Getting Autobuild system and security software to play nicely on my system.


= Past Updates =
<b>May</b><br />
[[Snowstorm_Daily_Scrum_Archive/05172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/05162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/05132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/05122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/05112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/05052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/05042011 | 04]]


==== Andrew ====
<b>April</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/04272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]
<b>PAST</b><br />
* Task VWR-20702 (Snowstorm Sprint 2: As a User who's customized the bottom bar of the Viewer UI, I also want to be able to control the order of the buttons as they appear in the UI.)
** WIP. Estimate ~3 days.


<b>FUTURE</b>
<b>March</b><br />
*Task VWR-20702
[[Snowstorm_Daily_Scrum_Archive/03312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/03302011 | 30]] | [[Snowstorm_Daily_Scrum_Archive/03292011 | 29]] | [[Snowstorm_Daily_Scrum_Archive/03192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/03182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/03172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/03162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/03152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/03142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/03112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/03102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/03092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/03082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/03072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/03042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/03032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/03022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/03012011 | 01]]
**analyze d&d in favorites, add similar to bottom tray
**change order of buttons shrinking and disappearing depending on button locations
**save order in settings and use it when creating bottom tray
**investigate inconsistency in distance between buttons


<b>IMPEDIMENTS</b><br />
<b>February</b><br />
* Order of buttons shrinking and disappearing
[[Snowstorm_Daily_Scrum_Archive/02282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/02252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/02242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/02232011 | 23]] | [[Snowstorm_Daily_Scrum_Archive/02222011 | 22]] | [[Snowstorm_Daily_Scrum_Archive/02182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/02162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/02152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/02142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/02112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/02102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/02092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/02082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/02072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/02042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/02032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/02022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |


<b>January</b><br />
[[Snowstorm_Daily_Scrum_Archive/01312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/01282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/01272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/01262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/01252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/01242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/01212011 | 21]] | [[Snowstorm_Daily_Scrum_Archive/01202011 | 20]] | [[Snowstorm_Daily_Scrum_Archive/01192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/01182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/01142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/01132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/01122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/01112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/01102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]


==== Vadim ====
<b>2010</b><br />
----
<b>December</b><br />  
<b>PAST</b><br />
[[Snowstorm_Daily_Scrum_Archive/12302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/12232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/12222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/12212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/12202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/12172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/12162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/12152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/12142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/12132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/12102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/12092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/12082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/12072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/12062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/12032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/12022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/12012010 | 01]]
* Critical bug EXT-8727 (Crash in LLAppearanceMgr::updateClothingOrderingInfo):
**Posted a defensive fix for review (could not repro though).
*Task VWR-20694 (Enable sidebar to track detaching/attaching tabs):
**Filed, working on it
*Code review, merge.
 
<b>FUTURE</b><br />
*Commit EXT-8727 if it gets approved.
*Work on VWR-20694.
 
<b>IMPEDIMENTS</b><br />
*none


<b>November</b><br />
[[Snowstorm_Daily_Scrum_Archive/11302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/11292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/11242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/11232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/11222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/11192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/11182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/11172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/11162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/11152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/11122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/11112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/11102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/11092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/11082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/11052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/11042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/11032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/11022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/11012010 | 01]]


==== Sergey ====
<b>October</b><br />  
----
[[Snowstorm_Daily_Scrum_Archive/10292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/10282010 | 28]] | [[Snowstorm_Daily_Scrum_Archive/10272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/10262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/10252010 | 25]] | [[Snowstorm_Daily_Scrum_Archive/10222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/10212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/10202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/10182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/10152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/10142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/10132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/10122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/10112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/10082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/10072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/10062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/10052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/10042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/10012010 | 01]]
<b>PAST</b><br />
*Task (VWR-20694) As a User, I want to undock tabs  from the Viewer sidebar so that I can control what tabs are displayed  and organize them on my screen in any way I want like I could do in  1.23.
**WIP.
**Fixed some crashes caused by docking/re-docking tabs.
**Investigating undocked tab visibility changes when switching tabs in Side Tray.
 
<b>FUTURE</b><br />
* Task (VWR-20694) As a User, I want to undock tabs from the Viewer sidebar ...
**Estimated: 3 days for sub-tasks 4 and 5.
 
<b>IMPEDIMENTS</b><br />
*need design soon
 
 
==== Anya ====
----
<b>PAST</b><br />
*sidebar docking/undocking design issues (VWR-20694)
*bottom bar button reordering design issues (VWR-20702)
*jira VWR workflow wrangling
*tracking missing fixes
*progress tracking
 
<b>FUTURE</b><br />
*GH & new jira demo
*VWR-20702 design - button shrinking/disappearing - follow up with Ben
*completed/in progress tasks need estimates / burndown data
*esablish procedure for taking EXTs from old PE backlog to particular sprint
*follow up future commit process
 
<b>IMPEDIMENTS</b><br />
*out thu-fri next week


<b>September</b><br />
[[Snowstorm_Daily_Scrum_Archive/09272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/09242010 | 24]] |
[[Snowstorm_Daily_Scrum_Archive/09212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/09202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/09172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/09162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/09152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/09142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/09132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/09092010 | 09]] | 
[[Snowstorm_Daily_Scrum_Archive/09082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/09072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/09032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/09022010 | 02]] |
[[Snowstorm_Daily_Scrum_Archive/09012010 | 01]]


== Past Updates ==
<b>August</b><br />
* [[Snowstorm_Daily_Scrum_Archive/08252010 | Wednesday, August 25, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/08262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/08252010 | 25]] |
* [[Snowstorm_Daily_Scrum_Archive/08242010 | Tuesday, August 24, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/08232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/08202010 | 20]] |
* [[Snowstorm_Daily_Scrum_Archive/08232010 | Monday, August 23, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/08182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/08162010 | 16]]
* [[Snowstorm_Daily_Scrum_Archive/08202010 | Friday, August 20, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08192010 | Thursday, August 19, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08182010 | Wednesday, August 18, 2010]]
* Tuesday, August 17, 2010 - <i>No Daily Scrum today, Sprint 2 Planning took place</i>
* [[Snowstorm_Daily_Scrum_Archive/08162010 | Monday, August 16, 2010]]

Latest revision as of 01:23, 19 May 2011


Sprint 16, ends 05.31.11

Wednesday, May 18

Team Status


Oz Linden


PAST

  • Much merging
  • Assorted repairs to mesh branch merge
  • Reviewing Windlight builds

FUTURE

  • Submit storm-1100
  • Start on storm-1265

IMPEDIMENTS

  • none

Wolf Linden


PAST
FUTURE

  • Working on getting an answer for Storm-565

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunters
  • sprint cleanup
  • some triage

FUTURE

  • crashhunters cleanup
  • VWR triage
  • STORM-951
  • PO build
  • reports

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Reported a crash in viewer-development.
  • Manual merge from viewer-development to the WLRS integration branch.
  • WLRS repo Windows build issues: fixed one and handed another over to Paul.
  • Task STORM-1256 (Region environment settings editor):
    • WIP. Investigating time synchronization between viewer and region.

FUTURE

  • Continue with STORM-1256.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.9 beta build r230161
  • verified yestarday's blockers - crash and help unavailability
  • passed smoke & integrity tests, refer to the IQA-164 for more details
  • tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin

FUTURE

  • pickup latest v-d build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
  • Deciding on what type of build to work on next.
  • Run a Test build of Brad's must build faster Repository as a test on local system.
    • Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
  • Local build after mesh code merge crashes on start.
    • This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
    • also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .

FUTURE

  • Working inworld(this is part of testing localy built viewers).
  • Wait for crash on error to be fixed.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.

Past Updates

May
17 | 16 | 13 | 12 | 11 | 05 | 04

April
27 | 26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16