Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
 
(307 intermediate revisions by 4 users not shown)
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Thursday, August 26, 2010 ==
== Sprint 16, ends 05.31.11 ==
 
== Wednesday, May 18 ==
=== General Notes ===
----
* No Daily Scrum tomorrow. Sprint Review Meeting Scheduled from 6-9am PT.
 


===Team Status===
===Team Status===
----
----
 
==== Oz Linden ====
====Aimee====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Reviewed and pulled Merov's llkdu fixes.
* Much merging
* Attended Snowstorm OH.
* Assorted repairs to mesh branch merge
* Imported and merged double-click teleport patch from Snowglobe.
* Reviewing Windlight builds


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Finish off double-click teleport and get a build up for design review.
* Submit storm-1100
* Team meeting.
* Start on storm-1265
* Howard's software dev meeting.
* Get back to importing Snowglobe build fixes
* Check with CG about renaming TeamCity projects to Viewer-Release-Builds, and Viewer-Project-Builds so that they sort together in the project list. May also need Viewer-Aimee's-Builds as I seem to be accumulating enough for my own project :)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* none


 
==== Wolf Linden ====
====Tofu====
----
OOO
 
 
====Oz====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* essentially no Snowstorm work yesterday
<b>FUTURE</b><br />
* update patch from Thickbrick for texture alignment, get it reviewed.
* get archive of my last Office Hour posted
* todays Office Hour
<b>IMPEDIMENTS</b><br />
* Non-Snowstorm tasks (no help for it)
==== Merov ====
----
<b>PAST</b><br />
* LLKDU in viewer-development: review. Logged VWR-20946 to track this. Got -1 review by Mani: Linux doesn't load llkdu. Aimee to pull the change though so we get Windows at least to build correctly.
* Add "Sit" to the "pie" menu: Got everything ready for review and pull. Created a merov-viewer-development-features repo and TeamCity tasks to share, review and test. Q is: how do we move swiftly with the rest of the process?
* Unplanned: lots of discussions on llkdu with lab folks...
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* LLKDU in viewer-development: fix the Linux issue.
* Working on getting an answer for Storm-565
* Add "Sit" to the "pie" menu: Design review (VWR-20711)
* Add "Sit" to the "pie" menu: Test the ability to sit "anywhere" (VWR-20712)


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Need clarity as to how we cover the "review, vet, pull" steps of the process in a swift and efficient way (see http://wiki.secondlife.com/wiki/Viewer_Integration_and_Release_Processes)
* none
 


==== Q ====
==== Grumpity ProductEngine ====
----
<i>OOO</i>
 
 
==== Esbee ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Hold first Product Backlog & Idea OH
* crashhunters
* Review texture alignment build for Oz
* sprint cleanup
* Discussion about UI Toolkit
* some triage
* Discussion about UI customization
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Get Resident ideas and feedback into the idea tab of backlog
* crashhunters cleanup
* Document idea submission process
* VWR triage
* Review Tofu's list of changes from viewer-public
* STORM-951
* Team Meeting
* PO build
* Howard's 'Quick or Dead' Meeting
* reports
 
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* none
 


==== Paul ====
==== Vadim ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*BUG EXT- 8722 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
* Reported a crash in viewer-development.
**In progress 60%.  
* Manual merge from viewer-development to the WLRS integration branch.
 
* WLRS repo Windows build issues: fixed one and handed another over to Paul.
* Task STORM-1256 (Region environment settings editor):
** WIP. Investigating time synchronization between viewer and region.
<b>FUTURE</b><br />
<b>FUTURE</b><br />
*BUG EXT- 8722 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
* Continue with STORM-1256.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*none
* none


 
==== Andrey ProductEngine ====
==== Andrew ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*Task VWR-20702 (Snowstorm Sprint 2: As a User who's customized the bottom bar of the Viewer UI, I also want to be able to control the order of the buttons as they appear in the UI.)
* picked up 2.6.9 beta build r230161
**WIP. Working on D&D similar to favorites, will finish tomorrow.
* verified yestarday's blockers - crash and help unavailability
* passed smoke & integrity tests, refer to the IQA-164 for more details
* tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin


<b>FUTURE</b><br />
<b>FUTURE</b><br />
*Task VWR-20702
* pickup latest v-d build?
**analyze d&d in favorites, add similar to bottom tray
**change order of buttons shrinking and disappearing depending on button locations
**save order in settings and use it when creating bottom tray
**investigate inconsistency in distance between buttons


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Order of buttons shrinking and disappearing
* none


 
==== Wolfpup Lowenhar ====
==== Vadim ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*Task VWR-20964 (Enable sidebar to track detaching/attaching tabs):
* Working inworld(this is part of testing localy built viewers).
**70% complete.  
** Checking on horses and bundles, plus work on note cards for them.
* Deciding on what type of build to work on next.
* Run a Test build of Brad's must build faster Repository as a test on local system.
** Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
* Local build after mesh code merge crashes on start.
** This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
** also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .


<b>FUTURE</b><br />
<b>FUTURE</b><br />
*create repo to work on detachable tabs, add my code for VWR-20964, integarte with Sergey's code.  
* Working inworld(this is part of testing localy built viewers).
*figure out how else to help Sergey
* Wait for crash on error to be fixed.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*none
* Getting Autobuild system and security software to play nicely on my system.


= Past Updates =
<b>May</b><br />
[[Snowstorm_Daily_Scrum_Archive/05172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/05162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/05132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/05122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/05112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/05052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/05042011 | 04]]


==== Sergey ====
<b>April</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/04272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]
<b>PAST</b><br />
*Task (VWR-20696) Write code to allow for undocking of a sidebar tab
*Task (VWR-20697) Write code to allow for redocking of a sidebar tab
**Fixed undocked tab visibility changes when switching tabs in Side Tray.
**Added undocking multiple tabs from Side Tray.
**Fixed Side Tray expanding/collapsing on undocking/undocking tabs.


<b>FUTURE</b><br />
<b>March</b><br />
* Task (VWR-20696) Write code to allow for undocking of a sidebar tab
[[Snowstorm_Daily_Scrum_Archive/03312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/03302011 | 30]] | [[Snowstorm_Daily_Scrum_Archive/03292011 | 29]] | [[Snowstorm_Daily_Scrum_Archive/03192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/03182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/03172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/03162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/03152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/03142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/03112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/03102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/03092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/03082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/03072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/03042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/03032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/03022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/03012011 | 01]]
* Task (VWR-20697) Write code to allow for redocking of a sidebar tab
* Integrate with Vadim's code to complete both tasks tomorrow no significant bugs are found


<b>IMPEDIMENTS</b>
<b>February</b><br />
*need design soon
[[Snowstorm_Daily_Scrum_Archive/02282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/02252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/02242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/02232011 | 23]] | [[Snowstorm_Daily_Scrum_Archive/02222011 | 22]] | [[Snowstorm_Daily_Scrum_Archive/02182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/02162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/02152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/02142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/02112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/02102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/02092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/02082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/02072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/02042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/02032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/02022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |


<b>January</b><br />
[[Snowstorm_Daily_Scrum_Archive/01312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/01282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/01272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/01262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/01252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/01242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/01212011 | 21]] | [[Snowstorm_Daily_Scrum_Archive/01202011 | 20]] | [[Snowstorm_Daily_Scrum_Archive/01192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/01182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/01142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/01132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/01122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/01112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/01102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]


==== Anya ====
<b>2010</b><br />
----
<b>December</b><br />  
<b>PAST</b><br />
[[Snowstorm_Daily_Scrum_Archive/12302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/12232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/12222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/12212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/12202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/12172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/12162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/12152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/12142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/12132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/12102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/12092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/12082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/12072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/12062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/12032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/12022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/12012010 | 01]]
*GH & new jira demo
*Followup on future workflow and PE process
*Played with new jira
*Investigated platform testing status
*maintenance/org


<b>FUTURE</b><br />
<b>November</b><br />  
*VWR-20702 design - button shrinking/disappearing - follow up with Ben
[[Snowstorm_Daily_Scrum_Archive/11302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/11292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/11242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/11232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/11222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/11192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/11182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/11172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/11162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/11152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/11122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/11112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/11102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/11092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/11082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/11052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/11042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/11032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/11022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/11012010 | 01]]
*esablish procedure for taking EXTs from old PE backlog to particular sprint


<b>IMPEDIMENTS</b><br />
<b>October</b><br />  
*out thu-fri next week
[[Snowstorm_Daily_Scrum_Archive/10292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/10282010 | 28]] | [[Snowstorm_Daily_Scrum_Archive/10272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/10262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/10252010 | 25]] | [[Snowstorm_Daily_Scrum_Archive/10222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/10212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/10202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/10182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/10152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/10142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/10132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/10122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/10112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/10082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/10072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/10062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/10052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/10042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/10012010 | 01]]


<b>September</b><br />
[[Snowstorm_Daily_Scrum_Archive/09272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/09242010 | 24]] |
[[Snowstorm_Daily_Scrum_Archive/09212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/09202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/09172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/09162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/09152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/09142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/09132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/09092010 | 09]] | 
[[Snowstorm_Daily_Scrum_Archive/09082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/09072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/09032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/09022010 | 02]] |
[[Snowstorm_Daily_Scrum_Archive/09012010 | 01]]


== Past Updates ==
<b>August</b><br />
* [[Snowstorm_Daily_Scrum_Archive/08252010 | Wednesday, August 25, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/08262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/08252010 | 25]] |
* [[Snowstorm_Daily_Scrum_Archive/08242010 | Tuesday, August 24, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/08232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/08202010 | 20]] |
* [[Snowstorm_Daily_Scrum_Archive/08232010 | Monday, August 23, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/08182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/08162010 | 16]]
* [[Snowstorm_Daily_Scrum_Archive/08202010 | Friday, August 20, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08192010 | Thursday, August 19, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08182010 | Wednesday, August 18, 2010]]
* Tuesday, August 17, 2010 - <i>No Daily Scrum today, Sprint 2 Planning took place</i>
* [[Snowstorm_Daily_Scrum_Archive/08162010 | Monday, August 16, 2010]]

Latest revision as of 01:23, 19 May 2011


Sprint 16, ends 05.31.11

Wednesday, May 18

Team Status


Oz Linden


PAST

  • Much merging
  • Assorted repairs to mesh branch merge
  • Reviewing Windlight builds

FUTURE

  • Submit storm-1100
  • Start on storm-1265

IMPEDIMENTS

  • none

Wolf Linden


PAST
FUTURE

  • Working on getting an answer for Storm-565

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunters
  • sprint cleanup
  • some triage

FUTURE

  • crashhunters cleanup
  • VWR triage
  • STORM-951
  • PO build
  • reports

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Reported a crash in viewer-development.
  • Manual merge from viewer-development to the WLRS integration branch.
  • WLRS repo Windows build issues: fixed one and handed another over to Paul.
  • Task STORM-1256 (Region environment settings editor):
    • WIP. Investigating time synchronization between viewer and region.

FUTURE

  • Continue with STORM-1256.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.9 beta build r230161
  • verified yestarday's blockers - crash and help unavailability
  • passed smoke & integrity tests, refer to the IQA-164 for more details
  • tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin

FUTURE

  • pickup latest v-d build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
  • Deciding on what type of build to work on next.
  • Run a Test build of Brad's must build faster Repository as a test on local system.
    • Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
  • Local build after mesh code merge crashes on start.
    • This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
    • also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .

FUTURE

  • Working inworld(this is part of testing localy built viewers).
  • Wait for crash on error to be fixed.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.

Past Updates

May
17 | 16 | 13 | 12 | 11 | 05 | 04

April
27 | 26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16