Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
 
(285 intermediate revisions by 3 users not shown)
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Thursday, September 9, 2010 ==
== Sprint 16, ends 05.31.11 ==
 
== Wednesday, May 18 ==
=== General Notes ===
----
* Don't forget to grab tasks from the Sprint Backlog and update your time remaining on that task each day!
* Merge Monkey of the Day: Merov


===Team Status===
===Team Status===
----
----
 
==== Oz Linden ====
====Aimee Linden====
----
OOO
 
 
====Tofu Linden====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* DEV-30773 llTextBox()
* Much merging
* Some Coverity bug fixes
* Assorted repairs to mesh branch merge
* SNOW-606 juggling (and ultimate backout)
* Reviewing Windlight builds
* Some OOO


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* DEV-30773 llTextBox()
* Submit storm-1100
* Make myself a teamcity task for staging
* Start on storm-1265
* Some OOO


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Linux build machine needs a bit of system-image love - little fuzzy on who owns that, pinged CG and Sabin.
* none
 
 
====Oz Linden====
----
OOO
 


====Merov Linden====
==== Wolf Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* VWR-22761 : LLKDU upgrade: Perf tracking
** Got a KDU baseline and compared with OpenJpeg. First data show that OpenJpeg 4 times slower in decompression than KDU.
** Posted a doc: https://wiki.secondlife.com/wiki/Performance_Testers
** First commit to dev repo : https://bitbucket.org/merov_linden/viewer-development-vwr-22761/changeset/71b1676532b3
* VWR-22759 : Chat Translator: Got green from Esbee and Q on Design Review
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* VWR-22761 : LLKDU upgrade: Polish doc, get more baseline data
* Working on getting an answer for Storm-565
* VWR-22759 : Chat Translator: Move to next stage


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Kakadu license upgrade
* none
 
 
====Q Linden====
----
OOO


 
==== Grumpity ProductEngine ====
====Esbee Linden====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Worked on draft of  Jira VWR workflow proposal and discuss w/Q
* crashhunters
* Moved Snowstorm Team Backlog to GH
* sprint cleanup
* Trying out new Jira VWR workflows
* some triage
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Schedule meeting with Orange, Gentle, and LordGregGreg for next week.
* crashhunters cleanup
* Share UI customization notes and sketches with Rhett from XD team
* VWR triage
* Finish draft of  Jira VWR workflow proposal
* STORM-951
* Set up sprints in GH
* PO build
 
* reports
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Not receiving Tofu's email to mailing list (still not sure why)
* none


 
==== Vadim ProductEngine ====
====Paul ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* VWR-22346 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
* Reported a crash in viewer-development.
**Corrected according to Vadim's commentaries
* Manual merge from viewer-development to the WLRS integration branch.
 
* WLRS repo Windows build issues: fixed one and handed another over to Paul.
* Task STORM-1256 (Region environment settings editor):
** WIP. Investigating time synchronization between viewer and region.
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* VWR-22169 (Delete outfit confirmation message doesn'r appear if use context or gear menu on 'My Outfits' tab) estimate ~ 8 hours
* Continue with STORM-1256.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
*none
* none


 
==== Andrey ProductEngine ====
====Andrew ProductEngine====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*Bug VWR-22008 (People you called via Adhoc are not shown in Recent tab).
* picked up 2.6.9 beta build r230161
**Discussed with Andrey, didn't find solution. Will ask in jira when able to add watchers
* verified yestarday's blockers - crash and help unavailability
* Major bug VWR-22125 (Mini-inspector floater doesn't appear after click on 'i' icon in IM or Nearby chat window).
* passed smoke & integrity tests, refer to the IQA-164 for more details
**Found problem.  Took more time due to additional bug (VWR-22898 - Some buttons disappear when clicked)
* tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin
**Fixed, will apply fix when Richard fixes  VWR-22898 (Vadim linked them)
* Bug VWR-22888 (Empty space appears in the top of Home side panel after redocking)
**WIP. Estimate - 6h


<b>FUTURE</b><br />
<b>FUTURE</b><br />
*VWR-22888 (Empty space appears in the top of Home side panel after redocking)
* pickup latest v-d build?


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


 
==== Wolfpup Lowenhar ====
====Vadim ProductEngine====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* sent email to viewer-tech about problems building on Ubuntu 10.04, Tofu immediately merged the fix.
* Working inworld(this is part of testing localy built viewers).
** later it turned out fix broke the build on LL servers, fix has been rolled back, discussion continues (?)
** Checking on horses and bundles, plus work on note cards for them.
* Filed a ticket (VWR-22898) regarding disappearing buttons problem.
* Deciding on what type of build to work on next.
*Bug VWR-22891 (Docked IM window hides when try to share an        item while My Inventory SP is undocked):

* Run a Test build of Brad's must build faster Repository as a test on local system.
**Fixed
** Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
* Bug VWR-22896 (Panel state resets on dock/undock):
* Local build after mesh code merge crashes on start.
**Fixed but want to test some more to prevent accidental regressions
** This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
** also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
*Paul's review request
* Working inworld(this is part of testing localy built viewers).
*Finish VWR-22896
* Wait for crash on error to be fixed.
*Other bugs


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* Getting Autobuild system and security software to play nicely on my system.


====Sergey ProductEngine====
= Past Updates =
----
<b>May</b><br />
OOO- Vacation
[[Snowstorm_Daily_Scrum_Archive/05172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/05162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/05132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/05122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/05112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/05052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/05042011 | 04]]


<b>April</b><br />
[[Snowstorm_Daily_Scrum_Archive/04272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]


====Andrey ProductEngine====
<b>March</b><br />
<b>PAST</b><br />
[[Snowstorm_Daily_Scrum_Archive/03312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/03302011 | 30]] | [[Snowstorm_Daily_Scrum_Archive/03292011 | 29]] | [[Snowstorm_Daily_Scrum_Archive/03192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/03182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/03172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/03162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/03152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/03142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/03112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/03102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/03092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/03082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/03072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/03042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/03032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/03022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/03012011 | 01]]
* filed issues discovered yesterday during smoke test and VWR-20694 testing
* started revision of existing TPE "regression" suite for viewer


<b>FUTURE</b><br />
<b>February</b><br />
* complete revision and identify gaps (Home, Picks/Classifieds, My Profile have no "formal" regression cases at least)
[[Snowstorm_Daily_Scrum_Archive/02282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/02252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/02242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/02232011 | 23]] | [[Snowstorm_Daily_Scrum_Archive/02222011 | 22]] | [[Snowstorm_Daily_Scrum_Archive/02182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/02162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/02152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/02142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/02112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/02102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/02092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/02082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/02072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/02042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/02032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/02022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |
* add sidetray panel docking/undocking test cases


<b>IMPEDIMENTS</b><br />
<b>January</b><br />
* none
[[Snowstorm_Daily_Scrum_Archive/01312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/01282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/01272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/01262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/01252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/01242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/01212011 | 21]] | [[Snowstorm_Daily_Scrum_Archive/01202011 | 20]] | [[Snowstorm_Daily_Scrum_Archive/01192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/01182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/01142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/01132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/01122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/01112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/01102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]


====Anya ProductEngine====
<b>2010</b><br />
----
<b>December</b><br />  
<b>PAST</b><br />
[[Snowstorm_Daily_Scrum_Archive/12302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/12232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/12222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/12212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/12202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/12172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/12162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/12152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/12142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/12132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/12102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/12092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/12082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/12072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/12062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/12032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/12022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/12012010 | 01]]
*played with new jira
*workflow followup
*server testing followup


<b>FUTURE</b><br />
<b>November</b><br />  
*detachable sidebar & bottom bar review
[[Snowstorm_Daily_Scrum_Archive/11302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/11292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/11242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/11232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/11222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/11192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/11182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/11172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/11162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/11152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/11122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/11112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/11102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/11092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/11082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/11052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/11042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/11032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/11022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/11012010 | 01]]
*transition issues from VWR to STORM?
*update sprint backlog


<b>IMPEDIMENTS</b><br />
<b>October</b><br />  
*cannot transition issues from VWR to STORM
[[Snowstorm_Daily_Scrum_Archive/10292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/10282010 | 28]] | [[Snowstorm_Daily_Scrum_Archive/10272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/10262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/10252010 | 25]] | [[Snowstorm_Daily_Scrum_Archive/10222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/10212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/10202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/10182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/10152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/10142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/10132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/10122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/10112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/10082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/10072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/10062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/10052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/10042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/10012010 | 01]]


<b>September</b><br />
[[Snowstorm_Daily_Scrum_Archive/09272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/09242010 | 24]] |
[[Snowstorm_Daily_Scrum_Archive/09212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/09202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/09172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/09162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/09152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/09142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/09132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/09092010 | 09]] | 
[[Snowstorm_Daily_Scrum_Archive/09082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/09072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/09032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/09022010 | 02]] |
[[Snowstorm_Daily_Scrum_Archive/09012010 | 01]]


== Past Updates ==
<b>August</b><br />
* [[Snowstorm_Daily_Scrum_Archive/09082010 | Wednesday, September 8, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/08262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/08252010 | 25]] |
* [[Snowstorm_Daily_Scrum_Archive/09072010 | Tuesday, September 7, 2010]]
[[Snowstorm_Daily_Scrum_Archive/08242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/08232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/08202010 | 20]] |
* Monday, September 6, 2010 - <i>No Daily Scrum, Labor Day Holiday</i>
[[Snowstorm_Daily_Scrum_Archive/08192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/08182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/08162010 | 16]]
* [[Snowstorm_Daily_Scrum_Archive/09032010 | Friday, September 3, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/09022010 | Thursday, September 2, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/09012010 | Wednesday, September 1, 2010]]
* Tuesday, August 31, 2010 - <i>No Daily Scrum, Sprint 2 Retrospective & Sprint 3 Planning Meetings took place</i>
* [[Snowstorm_Daily_Scrum_Archive/08302010 | Monday, August 30, 2010]]
* Friday, August 27, 2010 - <i>No Daily Scrum, Sprint 2 Review took place</i>
* [[Snowstorm_Daily_Scrum_Archive/08262010 | Thursday, August 26, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08252010 | Wednesday, August 25, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08242010 | Tuesday, August 24, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08232010 | Monday, August 23, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08202010 | Friday, August 20, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08192010 | Thursday, August 19, 2010]]
* [[Snowstorm_Daily_Scrum_Archive/08182010 | Wednesday, August 18, 2010]]
* Tuesday, August 17, 2010 - <i>No Daily Scrum, Sprint 2 Planning took place</i>
* [[Snowstorm_Daily_Scrum_Archive/08162010 | Monday, August 16, 2010]]

Latest revision as of 01:23, 19 May 2011


Sprint 16, ends 05.31.11

Wednesday, May 18

Team Status


Oz Linden


PAST

  • Much merging
  • Assorted repairs to mesh branch merge
  • Reviewing Windlight builds

FUTURE

  • Submit storm-1100
  • Start on storm-1265

IMPEDIMENTS

  • none

Wolf Linden


PAST
FUTURE

  • Working on getting an answer for Storm-565

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunters
  • sprint cleanup
  • some triage

FUTURE

  • crashhunters cleanup
  • VWR triage
  • STORM-951
  • PO build
  • reports

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Reported a crash in viewer-development.
  • Manual merge from viewer-development to the WLRS integration branch.
  • WLRS repo Windows build issues: fixed one and handed another over to Paul.
  • Task STORM-1256 (Region environment settings editor):
    • WIP. Investigating time synchronization between viewer and region.

FUTURE

  • Continue with STORM-1256.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.9 beta build r230161
  • verified yestarday's blockers - crash and help unavailability
  • passed smoke & integrity tests, refer to the IQA-164 for more details
  • tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin

FUTURE

  • pickup latest v-d build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
  • Deciding on what type of build to work on next.
  • Run a Test build of Brad's must build faster Repository as a test on local system.
    • Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
  • Local build after mesh code merge crashes on start.
    • This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
    • also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .

FUTURE

  • Working inworld(this is part of testing localy built viewers).
  • Wait for crash on error to be fixed.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.

Past Updates

May
17 | 16 | 13 | 12 | 11 | 05 | 04

April
27 | 26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16