Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
 
(206 intermediate revisions by the same user not shown)
Line 2: Line 2:
__TOC__
__TOC__
<br clear="all"/>
<br clear="all"/>
==  Thursday, November 18, 2010  ==


=== General Notes ===
== Sprint 16, ends 05.31.11 ==
----
== Wednesday, May 18 ==
* Merge Monkey of the Day: Oz
* Q is OOO this morning


===Team Status===
===Team Status===
----
----
==== Merov Linden====
==== Oz Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-146: kdu-autobuild: Fixed Windows packaging issues. Fixed Linux build issues. All platforms covered! W00t!! Uploaded results to a spot install.py can download from.
* Much merging
* STORM-151: kdu static link: Updated install.xml with new libs, local Mac tests only so far.
* Assorted repairs to mesh branch merge
* Reviewing Windlight builds


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* STORM-146: kdu-autobuild: I also need to build linux 64 bits. Will do that today.
* Submit storm-1100
* STORM-151: kdu static link: Do test build for Windows and Linux 32. Will work on compression if time allows.
* Start on storm-1265


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* None
* none


====Oz Linden====
==== Wolf Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Merge Monkeying Around (STORM-627)
* Office Hour
* Code Review System (STORM-606)
** Installed components, configuring
* Looked at my recent crash logs
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Look more at crash logs
* Working on getting an answer for Storm-565
* Assorted administrative activities
* Continue with setting up Code Review system
* Merge Monkeying


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Q Linden====
==== Grumpity ProductEngine ====
----
* OOO
 
==== Esbee Linden====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Office hour and meetings
* crashhunters
* Review
* sprint cleanup
* [STORM-560] Provided more feedback to Andrew from PE about Mouselook and chat focus implementation.
* some triage
* [STORM-535] Asked for clarification around next steps on this task
* Updated various other tickets
* VWR Triage
* Ticket prioritization
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Work on internal reporting documents
* crashhunters cleanup
* [STORM-537] Update and publish (publicly) the keyboard shortcut doc
* VWR triage
* [STORM-539] Finish draft of prim alignment tool design
* STORM-951
* [STORM-34] Create quick design doc
* PO build
* VWR Triage
* reports
* Ticket prioritization
* Backlog cleanup
 
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Paul ProductEngine====
==== Vadim ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* TASK STORM-593 (Make transparent texteditor and lineeditor)
* Reported a crash in viewer-development.
** WIP. Within this task i try to fix the whole problem when some floaters are transparent, some partially transparent. Found out when it's happens. Tomorrow will search for the solution. Estimate ~16 hours.
* Manual merge from viewer-development to the WLRS integration branch.
 
* WLRS repo Windows build issues: fixed one and handed another over to Paul.
* Task STORM-1256 (Region environment settings editor):
** WIP. Investigating time synchronization between viewer and region.
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* TASK STORM-593 (Make transparent texteditor and lineeditor)
* Continue with STORM-1256.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Seth Productengine ====
==== Andrey ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* TASK (STORM-584) Fix color and opacity setting for Bubble Chat
* picked up 2.6.9 beta build r230161
** WIP. Investigating implementation variant suggested in jira. Asked one more question to Esbee.
* verified yestarday's blockers - crash and help unavailability
* BUG (STORM-316) Debug: Inventory.Folders by Name/Sort by Date/Sort by Name/System Folders to Top Do not apply and settings changes do not persist after relogging.
* passed smoke & integrity tests, refer to the IQA-164 for more details
** Fixed. Sent for review.
* tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin


<b>FUTURE</b><br />
<b>FUTURE</b><br />
- BUG (STORM-189) [TRUNCATION] many langs - select build tools dialog
* pickup latest v-d build?
** Estimated: 6 hours.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* TASK (STORM-584) Fix color and opacity setting for Bubble Chat
* none
Asked one more question in jira, waiting for final confirmation from Esbee.


==== Andrew Productengine ====
==== Wolfpup Lowenhar ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Major task STORM-576 (Add a Preference to allow users to enable double-click to teleport or use auto-pilot).
* Working inworld(this is part of testing localy built viewers).
** Tested, found flaws in fix and changed implementation. Discussed with Vadim. Will add comments in code and put on bitbucket in the morning.
** Checking on horses and bundles, plus work on note cards for them.
* Reopened normal task STORM-582 (Take movement and camera control preferences from Advanced and move them to the new Move & View tab)
* Deciding on what type of build to work on next.
** Fixed and put on review.
* Run a Test build of Brad's must build faster Repository as a test on local system.
* Critical task STORM-560 (Add Preference that allows users to select default behavior when pressing letter keys).
** Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
** Had a lengthy discussion with Vadim. Words weren't enough to finish it :)) So we applied my fix patches to viewer, and decided which one to use. Will finish the chosen one tomorrow. Estimate- 5 hours.
* Local build after mesh code merge crashes on start.
** This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
** also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Critical task STORM-560 (Add Preference that allows users to select default behavior when pressing letter keys).
* Working inworld(this is part of testing localy built viewers).
* Wait for crash on error to be fixed.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Something new from sprint 8 or bug-queue.
* Getting Autobuild system and security software to play nicely on my system.


==== Vadim Productengine ====
= Past Updates =
----
<b>May</b><br />
<b>PAST</b><br />
[[Snowstorm_Daily_Scrum_Archive/05172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/05162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/05132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/05122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/05112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/05052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/05042011 | 04]]
* Story STORM-40 (Enable texture selector to scroll down to existing texture when opening):
** Investigated. Not sure what the problem is. Asked in the ticket.
* Bug STORM-622 (Texture picker screws up when multiple textures are opened):
** In progress.
* Discussed recent color changes in nearby chat history/toasts with Andrey.
* Code review.


<b>FUTURE</b><br />
<b>April</b><br />
* Complete work on STORM-622. ETA: 4-5h.
[[Snowstorm_Daily_Scrum_Archive/04272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]
* Pick something from the v-d bug queue.


<b>IMPEDIMENTS</b><br />
<b>March</b><br />
* Need an answer in STORM-40.
[[Snowstorm_Daily_Scrum_Archive/03312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/03302011 | 30]] | [[Snowstorm_Daily_Scrum_Archive/03292011 | 29]] | [[Snowstorm_Daily_Scrum_Archive/03192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/03182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/03172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/03162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/03152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/03142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/03112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/03102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/03092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/03082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/03072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/03042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/03032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/03022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/03012011 | 01]]
* Unclear what new stories we can take from sprint 8 (that don't require design work first).


==== Andrey Productengine ====
<b>February</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/02282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/02252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/02242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/02232011 | 23]] | [[Snowstorm_Daily_Scrum_Archive/02222011 | 22]] | [[Snowstorm_Daily_Scrum_Archive/02182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/02162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/02152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/02142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/02112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/02102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/02092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/02082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/02072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/02042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/02032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/02022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |


==== Jonathan Yap ====
<b>January</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/01312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/01282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/01272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/01262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/01252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/01242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/01212011 | 21]] | [[Snowstorm_Daily_Scrum_Archive/01202011 | 20]] | [[Snowstorm_Daily_Scrum_Archive/01192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/01182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/01142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/01132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/01122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/01112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/01102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]
<b>PAST</b><br />  
* Tested STORM-138 (llTextBox support) and wrote a few jira comments.
* Sent email to Esbee about VWR-23871 (menu adjustment for Neaby Voice).
* Implemented and tested STORM-616 (Me/Movement menu).
* Started to collect translations of "Movement" into other languages from native speakers.
 
<b>FUTURE</b><br />
* Implement STORM-616 for foreign languages?
 
<b>IMPEDIMENTS</b><br />
* Need feedback on foreign language policy.
** Are xml files to be changed by me or the internationalization team?  I only need one word (Movement) in order to proceed.


<b>2010</b><br />
<b>December</b><br />
[[Snowstorm_Daily_Scrum_Archive/12302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/12232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/12222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/12212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/12202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/12172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/12162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/12152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/12142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/12132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/12102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/12092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/12082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/12072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/12062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/12032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/12022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/12012010 | 01]]


== Past Updates ==
<b>November</b><br />  
<b>November</b><br />  
[[Snowstorm_Daily_Scrum_Archive/11162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/11152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/11122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/11112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/11102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/11092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/11082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/11052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/11042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/11032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/11022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/11012010 | 01]]
[[Snowstorm_Daily_Scrum_Archive/11302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/11292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/11242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/11232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/11222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/11192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/11182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/11172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/11162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/11152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/11122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/11112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/11102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/11092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/11082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/11052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/11042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/11032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/11022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/11012010 | 01]]


<b>October</b><br />  
<b>October</b><br />  
Line 159: Line 124:
<b>September</b><br />
<b>September</b><br />
[[Snowstorm_Daily_Scrum_Archive/09272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/09242010 | 24]] |  
[[Snowstorm_Daily_Scrum_Archive/09272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/09242010 | 24]] |  
[[Snowstorm_Daily_Scrum_Archive/09212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/09202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/09172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/09162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/09152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/09142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/09132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/09092010 | 9]] |  [[Snowstorm_Daily_Scrum_Archive/09082010 | 8]] | [[Snowstorm_Daily_Scrum_Archive/09072010 | 7]] | [[Snowstorm_Daily_Scrum_Archive/09032010 | 3]] | [[Snowstorm_Daily_Scrum_Archive/09022010 | 2]] | [[Snowstorm_Daily_Scrum_Archive/09012010 | 1]]
[[Snowstorm_Daily_Scrum_Archive/09212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/09202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/09172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/09162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/09152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/09142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/09132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/09092010 | 09]] |   
[[Snowstorm_Daily_Scrum_Archive/09082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/09072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/09032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/09022010 | 02]] |  
[[Snowstorm_Daily_Scrum_Archive/09012010 | 01]]


<b>August</b><br />
<b>August</b><br />

Latest revision as of 02:23, 19 May 2011


Sprint 16, ends 05.31.11

Wednesday, May 18

Team Status


Oz Linden


PAST

  • Much merging
  • Assorted repairs to mesh branch merge
  • Reviewing Windlight builds

FUTURE

  • Submit storm-1100
  • Start on storm-1265

IMPEDIMENTS

  • none

Wolf Linden


PAST
FUTURE

  • Working on getting an answer for Storm-565

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunters
  • sprint cleanup
  • some triage

FUTURE

  • crashhunters cleanup
  • VWR triage
  • STORM-951
  • PO build
  • reports

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Reported a crash in viewer-development.
  • Manual merge from viewer-development to the WLRS integration branch.
  • WLRS repo Windows build issues: fixed one and handed another over to Paul.
  • Task STORM-1256 (Region environment settings editor):
    • WIP. Investigating time synchronization between viewer and region.

FUTURE

  • Continue with STORM-1256.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.9 beta build r230161
  • verified yestarday's blockers - crash and help unavailability
  • passed smoke & integrity tests, refer to the IQA-164 for more details
  • tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin

FUTURE

  • pickup latest v-d build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
  • Deciding on what type of build to work on next.
  • Run a Test build of Brad's must build faster Repository as a test on local system.
    • Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
  • Local build after mesh code merge crashes on start.
    • This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
    • also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .

FUTURE

  • Working inworld(this is part of testing localy built viewers).
  • Wait for crash on error to be fixed.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.

Past Updates

May
17 | 16 | 13 | 12 | 11 | 05 | 04

April
27 | 26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16