Difference between revisions of "Snowstorm Daily Scrum Archive"

From Second Life Wiki
Jump to navigation Jump to search
 
(237 intermediate revisions by 2 users not shown)
Line 3: Line 3:
<br clear="all"/>
<br clear="all"/>


== Thursday, October 14, 2010 ==
== Sprint 16, ends 05.31.11 ==
 
== Wednesday, May 18 ==
=== General Notes ===
----
* Merge Monkey of the Day:  Oz
* RC Blocker resolved, waiting for new build.


===Team Status===
===Team Status===
----
----
==== Merov Linden====
==== Oz Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* STORM-104: kdu upgrade: Static linking to kdu done and works.
* Much merging
* Assorted repairs to mesh branch merge
* Reviewing Windlight builds


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* STORM-104: kdu upgrade: fix unit tests, make switch at build time work, test and verify some more.
* Submit storm-1100
* STORM-105 : Perf decompression: put new data out, check the work done by opensource-dev community on similar tests.
* Start on storm-1265


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* Latest KDU bits
* none


====Oz Linden====
==== Wolf Linden ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Merge Monkey
** Pulled outstanding beta fixes
** Drain Snowstorm integration queue
* Got Development Viewer links on main download page fixed
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Figure out how to test updated libcurl VWR-22780
* Working on getting an answer for Storm-565
** So that we can unblock VWR-20801 (socks 5 proxy)
* Merge Monkey
** Waiting for fix for STORM-381
* More changes to develop site
* Office Hour


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Q Linden====
==== Grumpity ProductEngine ====
----
* OOO
 
==== Esbee Linden====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Viewer release process discussion
* crashhunters
* Viewer 2.2 Release prep
* sprint cleanup
* some triage
<b>FUTURE</b><br />
* crashhunters cleanup
* VWR triage
* VWR triage
 
* STORM-951
<b>FUTURE</b><br />
* PO build
* Write Viewer 2.2 Release blog post
* reports
* Systems requirements analysis
* VWR Triage
* Viewer 2.2 Release
 
<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Paul ProductEngine====
==== Vadim ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
*STORM-196 'Undo changes' button is absent on 'Edit wearable' panel
* Reported a crash in viewer-development.
** Fixed
* Manual merge from viewer-development to the WLRS integration branch.
* STORM-258 [NAME] text instead Users name is shown when user recieves offer friendship.  
* WLRS repo Windows build issues: fixed one and handed another over to Paul.
** Fixed
* Task STORM-1256 (Region environment settings editor):
* STORM-293 Friend permissions icons overlap long names on 'My Friends' tab
** WIP. Investigating time synchronization between viewer and region.
** WIP. Estimate ~ 2-3 hours
 
<b>FUTURE</b><br />
<b>FUTURE</b><br />
* STORM-293 Friend permissions icons overlap long names on 'My Friends' tab
* Continue with STORM-1256.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Seth Productengine ====
==== Andrey ProductEngine ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* BUG (STORM-294) Selection goes out of Favorites overflow list if scroll it by keyboard
* picked up 2.6.9 beta build r230161
** Updated fix according to feedback.
* verified yestarday's blockers - crash and help unavailability
* BUG (STORM-303) Favorites folder content isn't refreshed while re-ordering landmaks
* passed smoke & integrity tests, refer to the IQA-164 for more details
** WIP. Could not find the root cause of defect for now.
* tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* BUG (STORM-303) Favorites folder content isn't refreshed while re-ordering landmaks
* pickup latest v-d build?
** Estimated: 4-6 hours.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* none


==== Andrew Productengine ====
==== Wolfpup Lowenhar ====
----
----
<b>PAST</b><br />
<b>PAST</b><br />
* Bug STORM-322 (Group Member Search: gives more entries then the search string suggests)
* Working inworld(this is part of testing localy built viewers).
** WIP. Fixed in not very good way, fixing in better one. Estimate- 3-4 hours.
** Checking on horses and bundles, plus work on note cards for them.
* Deciding on what type of build to work on next.
* Run a Test build of Brad's must build faster Repository as a test on local system.
** Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
* Local build after mesh code merge crashes on start.
** This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
** also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .


<b>FUTURE</b><br />
<b>FUTURE</b><br />
* Bug STORM-322 (Group Member Search: gives more entries then the search string suggests).
* Working inworld(this is part of testing localy built viewers).
* Wait for crash on error to be fixed.


<b>IMPEDIMENTS</b><br />
<b>IMPEDIMENTS</b><br />
* none
* Getting Autobuild system and security software to play nicely on my system.
 
= Past Updates =
<b>May</b><br />
[[Snowstorm_Daily_Scrum_Archive/05172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/05162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/05132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/05122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/05112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/05052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/05042011 | 04]]


==== Vadim Productengine ====
<b>April</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/04272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/04262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/04252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/04142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/04132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/04122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/04072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/04062011 | 06]]
<b>PAST</b><br />
* Bug STORM-297 ("<nolink>" text appears in confirmation message, if there is "<" symbol in Landmarks name):

** Investigated, failed to fix, bounced back to sprint backlog.

* Took over bug STORM-211 (Fade timer is reset for all toasts displayed in the notifications channel) from Paul.
** Found the flaw in Paul's fix. Will carefully test the fix and submit it tomorrow.


<b>FUTURE</b><br />
<b>March</b><br />
* Complete STORM-211.
[[Snowstorm_Daily_Scrum_Archive/03312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/03302011 | 30]] | [[Snowstorm_Daily_Scrum_Archive/03292011 | 29]] | [[Snowstorm_Daily_Scrum_Archive/03192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/03182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/03172011 | 17]] | [[Snowstorm_Daily_Scrum_Archive/03162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/03152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/03142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/03112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/03102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/03092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/03082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/03072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/03042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/03032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/03022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/03012011 | 01]]
* Bug STORM-376 (Toast close button sometimes doesn't disappear).


<b>IMPEDIMENTS</b><br />
<b>February</b><br />
* STORM-297 needs input
[[Snowstorm_Daily_Scrum_Archive/02282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/02252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/02242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/02232011 | 23]] | [[Snowstorm_Daily_Scrum_Archive/02222011 | 22]] | [[Snowstorm_Daily_Scrum_Archive/02182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/02162011 | 16]] | [[Snowstorm_Daily_Scrum_Archive/02152011 | 15]] | [[Snowstorm_Daily_Scrum_Archive/02142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/02112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/02102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/02092011 | 09]] | [[Snowstorm_Daily_Scrum_Archive/02082011 | 08]] | [[Snowstorm_Daily_Scrum_Archive/02072011 | 07]] | [[Snowstorm_Daily_Scrum_Archive/02042011 | 04]] | [[Snowstorm_Daily_Scrum_Archive/02032011 | 03]] | [[Snowstorm_Daily_Scrum_Archive/02022011 | 02]] | [[Snowstorm_Daily_Scrum_Archive/02012011 | 01]] |


==== Andrey Productengine ====
<b>January</b><br />
----
[[Snowstorm_Daily_Scrum_Archive/01312011 | 31]] | [[Snowstorm_Daily_Scrum_Archive/01282011 | 28]] | [[Snowstorm_Daily_Scrum_Archive/01272011 | 27]] | [[Snowstorm_Daily_Scrum_Archive/01262011 | 26]] | [[Snowstorm_Daily_Scrum_Archive/01252011 | 25]] | [[Snowstorm_Daily_Scrum_Archive/01242011 | 24]] | [[Snowstorm_Daily_Scrum_Archive/01212011 | 21]] | [[Snowstorm_Daily_Scrum_Archive/01202011 | 20]] | [[Snowstorm_Daily_Scrum_Archive/01192011 | 19]] | [[Snowstorm_Daily_Scrum_Archive/01182011 | 18]] | [[Snowstorm_Daily_Scrum_Archive/01142011 | 14]] | [[Snowstorm_Daily_Scrum_Archive/01132011 | 13]] | [[Snowstorm_Daily_Scrum_Archive/01122011 | 12]] | [[Snowstorm_Daily_Scrum_Archive/01112011 | 11]] | [[Snowstorm_Daily_Scrum_Archive/01102011 | 10]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01062011 | 06]] | [[Snowstorm_Daily_Scrum_Archive/01052011 | 05]] | [[Snowstorm_Daily_Scrum_Archive/01042011 | 04]]
<b>PAST</b><br />
* smoke + integrity testing of Viewer Release 2.2.0 (211892). Smoke tests were failed by STORM-377 & ** STORM-381


<b>FUTURE</b><br />
<b>2010</b><br />
* switch to viewer-development testing until new release build is shipped
<b>December</b><br />
[[Snowstorm_Daily_Scrum_Archive/12302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/12232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/12222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/12212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/12202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/12172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/12162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/12152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/12142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/12132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/12102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/12092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/12082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/12072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/12062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/12032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/12022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/12012010 | 01]]


<b>IMPEDIMENTS</b><br />
<b>November</b><br />  
* none
[[Snowstorm_Daily_Scrum_Archive/11302010 | 30]] | [[Snowstorm_Daily_Scrum_Archive/11292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/11242010 | 24]] | [[Snowstorm_Daily_Scrum_Archive/11232010 | 23]] | [[Snowstorm_Daily_Scrum_Archive/11222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/11192010 | 19]] | [[Snowstorm_Daily_Scrum_Archive/11182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/11172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/11162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/11152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/11122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/11112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/11102010 | 10]] | [[Snowstorm_Daily_Scrum_Archive/11092010 | 09]] | [[Snowstorm_Daily_Scrum_Archive/11082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/11052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/11042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/11032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/11022010 | 02]] | [[Snowstorm_Daily_Scrum_Archive/11012010 | 01]]


== Past Updates ==
<b>October</b><br />  
<b>October</b><br />
[[Snowstorm_Daily_Scrum_Archive/10292010 | 29]] | [[Snowstorm_Daily_Scrum_Archive/10282010 | 28]] | [[Snowstorm_Daily_Scrum_Archive/10272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/10262010 | 26]] | [[Snowstorm_Daily_Scrum_Archive/10252010 | 25]] | [[Snowstorm_Daily_Scrum_Archive/10222010 | 22]] | [[Snowstorm_Daily_Scrum_Archive/10212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/10202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/10182010 | 18]] | [[Snowstorm_Daily_Scrum_Archive/10152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/10142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/10132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/10122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/10112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/10082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/10072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/10062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/10052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/10042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/10012010 | 01]]
[[Snowstorm_Daily_Scrum_Archive/10132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/10122010 | 12]] | [[Snowstorm_Daily_Scrum_Archive/10112010 | 11]] | [[Snowstorm_Daily_Scrum_Archive/10082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/10072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/10062010 | 06]] | [[Snowstorm_Daily_Scrum_Archive/10052010 | 05]] | [[Snowstorm_Daily_Scrum_Archive/10042010 | 04]] | [[Snowstorm_Daily_Scrum_Archive/10012010 | 01]]


<b>September</b><br />
<b>September</b><br />
[[Snowstorm_Daily_Scrum_Archive/09272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/09242010 | 24]] | 23 | 22 |
[[Snowstorm_Daily_Scrum_Archive/09272010 | 27]] | [[Snowstorm_Daily_Scrum_Archive/09242010 | 24]] |  
[[Snowstorm_Daily_Scrum_Archive/09212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/09202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/09172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/09162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/09152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/09142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/09132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/09092010 | 9]] |  [[Snowstorm_Daily_Scrum_Archive/09082010 | 8]] | [[Snowstorm_Daily_Scrum_Archive/09072010 | 7]] | [[Snowstorm_Daily_Scrum_Archive/09032010 | 3]] | [[Snowstorm_Daily_Scrum_Archive/09022010 | 2]] | [[Snowstorm_Daily_Scrum_Archive/09012010 | 1]]
[[Snowstorm_Daily_Scrum_Archive/09212010 | 21]] | [[Snowstorm_Daily_Scrum_Archive/09202010 | 20]] | [[Snowstorm_Daily_Scrum_Archive/09172010 | 17]] | [[Snowstorm_Daily_Scrum_Archive/09162010 | 16]] | [[Snowstorm_Daily_Scrum_Archive/09152010 | 15]] | [[Snowstorm_Daily_Scrum_Archive/09142010 | 14]] | [[Snowstorm_Daily_Scrum_Archive/09132010 | 13]] | [[Snowstorm_Daily_Scrum_Archive/09092010 | 09]] |   
[[Snowstorm_Daily_Scrum_Archive/09082010 | 08]] | [[Snowstorm_Daily_Scrum_Archive/09072010 | 07]] | [[Snowstorm_Daily_Scrum_Archive/09032010 | 03]] | [[Snowstorm_Daily_Scrum_Archive/09022010 | 02]] |  
[[Snowstorm_Daily_Scrum_Archive/09012010 | 01]]


<b>August</b><br />
<b>August</b><br />

Latest revision as of 02:23, 19 May 2011


Sprint 16, ends 05.31.11

Wednesday, May 18

Team Status


Oz Linden


PAST

  • Much merging
  • Assorted repairs to mesh branch merge
  • Reviewing Windlight builds

FUTURE

  • Submit storm-1100
  • Start on storm-1265

IMPEDIMENTS

  • none

Wolf Linden


PAST
FUTURE

  • Working on getting an answer for Storm-565

IMPEDIMENTS

  • none

Grumpity ProductEngine


PAST

  • crashhunters
  • sprint cleanup
  • some triage

FUTURE

  • crashhunters cleanup
  • VWR triage
  • STORM-951
  • PO build
  • reports

IMPEDIMENTS

  • none

Vadim ProductEngine


PAST

  • Reported a crash in viewer-development.
  • Manual merge from viewer-development to the WLRS integration branch.
  • WLRS repo Windows build issues: fixed one and handed another over to Paul.
  • Task STORM-1256 (Region environment settings editor):
    • WIP. Investigating time synchronization between viewer and region.

FUTURE

  • Continue with STORM-1256.

IMPEDIMENTS

  • none

Andrey ProductEngine


PAST

  • picked up 2.6.9 beta build r230161
  • verified yestarday's blockers - crash and help unavailability
  • passed smoke & integrity tests, refer to the IQA-164 for more details
  • tested changes in scope of IQA-166, there is a bunch TPE cannot test. IQA-166 re-assigned back to Martin

FUTURE

  • pickup latest v-d build?

IMPEDIMENTS

  • none

Wolfpup Lowenhar


PAST

  • Working inworld(this is part of testing localy built viewers).
    • Checking on horses and bundles, plus work on note cards for them.
  • Deciding on what type of build to work on next.
  • Run a Test build of Brad's must build faster Repository as a test on local system.
    • Test Build took 8 minutes longer than normal and there was loss of functionality in most of the side panles.
  • Local build after mesh code merge crashes on start.
    • This could be a merge issue that is causing the viewer to error in LLViewerTextureList::addImageToList: ASSERT (mInitialized).
    • also looks to be same issue i had on linux testing the gpu viewer from storm-1100 .

FUTURE

  • Working inworld(this is part of testing localy built viewers).
  • Wait for crash on error to be fixed.

IMPEDIMENTS

  • Getting Autobuild system and security software to play nicely on my system.

Past Updates

May
17 | 16 | 13 | 12 | 11 | 05 | 04

April
27 | 26 | 25 | 14 | 13 | 12 | 07 | 06

March
31 | 30 | 29 | 19 | 18 | 17 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01

February
28 | 25 | 24 | 23 | 22 | 18 | 16 | 15 | 14 | 11 | 10 | 09 | 08 | 07 | 04 | 03 | 02 | 01 |

January
31 | 28 | 27 | 26 | 25 | 24 | 21 | 20 | 19 | 18 | 14 | 13 | 12 | 11 | 10 | 06 | 06 | 05 | 04

2010
December
30 | 23 | 22 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 10 | 09 | 08 | 07 | 06 | 03 | 02 | 01

November
30 | 29 | 24 | 23 | 22 | 19 | 18 | 17 | 16 | 15 | 12 | 11 | 10 | 09 | 08 | 05 | 04 | 03 | 02 | 01

October
29 | 28 | 27 | 26 | 25 | 22 | 21 | 20 | 18 | 15 | 14 | 13 | 12 | 11 | 08 | 07 | 06 | 05 | 04 | 01

September
27 | 24 | 21 | 20 | 17 | 16 | 15 | 14 | 13 | 09 | 08 | 07 | 03 | 02 | 01

August
30 | 26 | 25 | 24 | 23 | 20 | 19 | 18 | 16